PREFACE
THE aim of the author has been to present a true record of the
principal seagoing concrete ships actually built up to the present,
and to analyse the merits of these ships in comparison with
ships built of steel and wood.
The main part of this book is based on personal experience
gained in the construction of about thirty vessels of concrete
during the past five years. The information referring to ships
built by others has been obtained partly through correspondence
with the designers, builders, or owners, and partly from state-
ments published by them in the engineering press. As far as
possible, facts have been ascertained from official documents,
and reference to the source of information is made in each case
The calculations are condensed in the Appendix and have,
been avoided in the general text in order to facilitate the reading
for shipping people and others, who will play an important
part in the further development of the new type of ships without
being concerned in the technical side of the question. The
usual methods of calculating displacement, speed, etc., found
in standard works on naval architecture, have been omitted,
as they are practically identical for concrete ships.
Numerous technical papers and articles on concrete ships
have appeared in the press, but unfortunately the hopes or
opinions expressed have frequently been based on anticipation
rather than on actual experience. The result has been a mass
of conflicting reports which have caused much confusion on
the subject.
If the present book should aid in clearly establishing the
true status of the best type of seagoing concrete ship to-day,
and thus form a basis for further development, the author's
chief object will be accomplished.
N. K. F.
CHBISTIANIA, 1922.
515600
CONTENTS
CHAPTER I
PAGE
INTRODUCTORY 1
CHAPTER II
THE FIRST SEAGOING CONCRETE SHIP
Preliminary Consideration — Government Permit — Assumptions for
Calculation Purposes — Method of Construction — Engine Foundations and
Stern Post — Concreting — Equipment — Launching — Trials — Docking for
Inspection — Results of Experiment ....... 7
CHAPTER III
M.S. STIER AND M.S. ASKELAD
Negotiations — M.S. Stier — Strength Calculations — Constructional
Details — Construction — Official Trials — M.S. Askelad — Constructional
Details — Official Trials — The First North Sea Trip — Subsequent Service —
Summary of Results . . . . . . . . . .19
CHAPTER IV
COMPARISON OF SOME SHIPS BUILT TO CLASS WITH THE
AUTHOR'S TRIAL SHIPS
Classification of Concrete Ships — Comparative Values of Cargo Carriers
— American Concrete Ships — S.S. Selma and Latham; S.S. Cape Fear and
Sapona ............ 41
CHAPTER V
CONCRETE TUGS, FLOATING DOCKS, LIGHTSHIPS, AND
LIGHTERS
The First Concrete Tug — The First Concrete Floating Dock— The
First Concrete Lightship — Concrete Water-carrier — Concrete Lighters . 50
CHAPTER VI
SHIPS BUILT IN THE UNITED STATES
The Faith — U.S. Shipping Board Investigations — The First U.S.
Standard Concrete Ship — Ships actually completed — Oil-Tankers — Oil-
Storage generally .......... 68
CHAPTER VII
DAMAGES AND REPAIRS
M.S. Askelad — M.S. Nicanor— M.S. Stier— S.S. Polias ... 86
vi i
viii CONTENTS
CHAPTER VIII
COMPARISONS OF CONCRETE SHIPS WITH STEEL SHIPS
PAGE
First Cost — Units of Material and Labour per Ton — Examples of Costs
— Speed— Strength — Running Expenses — The Future of the Concrete
Ship 96
CHAPTER IX
SHIPBUILDING CONCRETE
Introductory — Portland Cement — Water — Aggregate — Impurities in
Aggregate — Sand — Light-weight Aggregate — Proportions of Mixture —
Mixing — Placing and Curing — Steam Curing — Freezing — Vibration, Pres-
sure, etc. — Compressive Strength — Shear Strength — Bond Strength —
Elasticity— Watertightness — Contraction and Expansion — Trass Concrete
— Action of Sea- water — Action of Oils. etc. — Repairs — Fire-resisting
Power 107
CHAPTER X
STEEL REINFORCEMENT
Types— Quality— High-Carbon Steel 146
CHAPTER XI
CONDITIONS GOVERNING STRUCTURAL DESIGN
Theory of Design — Side Frames — Bottom Frames — Centre Keelson —
Longitudinal Strength — Strength of Shell Slab — Watertight Bulkheads —
Norwegian Government Requirements — Deflection Test on Lighter . . 150
CHAPTER XII
GENERAL METHOD OF CONSTRUCTION
Preliminary Work — Bottom Floor Prepared — Outside Centring Com-
pleted— Bottom and Side Reinforcement in Place — Frame Centring and
Reinforcement in Place — Deck Centring in Place — Centring and Rein-
forcement Completed — Concreting — Concreting Finished — Cement Finish —
Cement- Gun Concreting . . . . . . . . .169
CHAPTER XIII
SOME SPECIAL METHODS OF CONSTRUCTION AND
PARTICULAR SHIPS
M.S. R. P. Durham — M.S. Linnea — " Pre-cast " Systems — S.S. Armistice
— S.S. Bartels — Present Tonnage of Concrete Ships — Author's Recom-
mendations ........... 181
APPENDIX
STRENGTH CALCULATIONS FOR M.S. ASKELAD . . .197
INDEX 212
SEAGOING
AND OTHER
CONCRETE SHIPS
CHAPTER I
INTRODUCTORY
WHEN a new idea or invention is first put into service it is
naturally received with a certain amount of antagonism ; the
concrete ship is no exception to this rule. The doubts still
abounding in regard to the concrete ship arise principally from
ignorance of what has already been accomplished ; and in order
to appreciate what has been accomplished, and so acquire a
basis for the formation of an intelligent opinion on the subject
of concrete ships, it is desirable to study, however briefly, the
development in the use of other shipbuilding materials.
From the earliest days down to almost the middle of the
nineteenth century wood was the material of which ships were
built. The use of wood was not a matter of choice, for it was
the only material available ; and for the ships built in the days
before the nineteenth century wood was not an unsuitable
material.
The proven suitability of wood, and a natural tendency to
the use of a buoyant material for a structure whose essential
quality is buoyancy, probably retarded the consideration of
alternative materials. But the developments in shipping
resulting from the adoption of steam machinery for propulsion
stimulated the desire for improved methods of constructing
ships. The first iron steamer was the Aaron Manby, built in
London in 1821, although the first use of iron as the material for
a ship probably dates back to 1777, when an iron lighter was
built in Yorkshire. The objections urged against iron as the
material for shipbuilding were that iron was too heavy and
could not float ; that iron was too brittle and, therefore, liable
1
„« «. *
1U
2 SEAGOING AND OTHER CONCRETE SHIPS
to severe damage in the event of grounding, which damage would
be difficult to repair ; that the bottoms of the ships would
become rapidly fouled with marine growth ; and that iron would
affect the compass by creating magnetic disturbances.
The first objection was soon ruled out ; iron ships not only
floated as well as wood ships, but proved even to be lighter than
wood ships.
As regards the second objection, there were two historic
cases of grounding which caused this one also to be ruled out.
The first case is that of the Garry Owen, a coasting steamer built
at Birkenhead in 1834. On her maiden voyage the Garry Owen
was driven ashore in a gale in company with a number of wood
ships. The latter were all either completely wrecked or very
seriously damaged ; the Garry Owen was undamaged. The
second case is that of the Great Britain, the first Atlantic liner
to be built of iron and to have a screw propeller. She was built
at Bristol in 1843 to the design of I. K. Brunei and was the
largest ship of her day. She had been only about a year in
service when she was run ashore on the east coast of Ireland,
where she remained throughout a whole winter exposed to the
full force of the sea. When refloated she was found to be very
little the worse for her experience. These two cases did much
to establish the reputation of iron as a shipbuilding material.
The objections relating to marine growth and magnetic
disturbance were not found to be serious. Frequent cleaning
and painting of the under body keeps down marine growth ;
and compensation for the magnetic disturbance due to the iron
hull can be made in the compass.
The principal consideration underlying the transition from
wood to iron was structural strength. It was found practically
impossible to make wood ships adequately strong if the length
approached 300 feet ; and this length was not sufficient for the
shipping needs of the time. A further consideration underlying
the transition was the difficulty of making a wood stern post
and stern construction fit to withstand the forces developed by
a propeller, and this consideration became increasingly important
with increase in engine power. But prejudices are not easily
dispelled. So late as 1861 the British Parliament appropriated
one million pounds sterling for the purchase of timber for the
construction of wood warships.
INTRODUCTORY 3
During the war there was a partial return to wood as a ship-
building material in the United States. This was brought about
by the great desire for mercantile tonnage and the limited capacity
of the American steel works for the production of shipbuilding
material. The results were not satisfactory ; the ships were
leaky and structurally weak. No doubt the results would not
have been so bad had carefully selected, seasoned, timber been
used instead of the " green " timber which was alone available.
But on the whole, the programme of wood shipbuilding merely
affords further justification, if any is needed, for the transition
from wood to iron.
The next development in shipbuilding material was the
substitution of steel for iron, a development in detail, however,
rather than in principle. The principal defects of iron were its
unreliable character and its distinct grain. The former rendered
it almost impossible to guarantee the strength of any plate ;
the latter resulted in the plate being stronger in one direction
than in another. Steel is a very reliable material, and it has
practically no grain, so that it is equally strong in all directions ;
this latter quality is of some importance in a shipbuilding material,
for there are few points in a ship where the principal stress is
exactly longitudinal or exactly transverse, and there are almost
as many directions of principal stress as there are points where
stress exists. Steel has the further great advantage over iron
of being about 25 to 30 per cent, stronger. The disadvantages
of steel as compared to iron are greater liability to corrosion
and, in the early days, increased cost.
The transition from iron to steel, though gradual, was not by
any means such a slow process as the transition from wood to
iron. There were, of course, difficulties to be overcome. At
first the new material was uneven in quality and, in addition,
the conditions under which it could be worked were different
from those for iron ; these two considerations, separately and
in combination, account for a large quantity of cracked and,
therefore, discarded material. The difficulty as regards liability
to corrosion was easily overcome ; this involves merely care
in upkeep. The greatest difficulty was that of cost. But the
difference in cost between a steel and an iron hull was not in the
ratio of the cost per ton of steel to the cost per ton of iron ;
for the greater strength of steel permitted a saving in weight of
4 SEAGOING AND OTHER CONCRETE SHIPS
material amounting to about 15 per cent. The increasing use
of steel consequent upon a recognition of its advantages brought
about a reduction in its cost, so that within a few years of the
introduction of steel a steel hull was actually slightly cheaper
than an iron hull ; nowadays a steel hull is very much cheaper
than an iron hull — indeed, iron hulls are seldom built.
. An idea of the rate of the transition from iron to steel can
be obtained from the pages of Lloyd's Register. In 1883, when
iron shipbuilding was at its zenith, 860,000 tons of iron ships
were built in British yards ; by 1888 this amount had decreased
to 50,000 tons, and by 1895 to 10,000 tons. Steel ships were
first registered in 1878, their tonnage amounting to 4,500 tons.
In 1880 about 4 per cent, of the tonnage built in British yards
was of steel ; by 1885 this percentage had increased to 60, and
by 1890 to about 95.
The next development in shipbuilding material is the use
of reinforced concrete. This development is only in its initial
stages, but in the following chapters an outline of actual achieve-
ment is given ; it must be borne in mind that, as indicated
above, over forty years elapsed between the first attempt at iron
shipbuilding and the building of the first iron steamer, and a
further twenty years before iron was recognized as being suitable
for the construction of seagoing ships, whereas only four or
five years have elapsed since the building of the first seagoing
concrete ship.
In the consideration of concrete as a shipbuilding material
it is not necessary to draw any comparisons with wood, for
wood as a material for seagoing ships has, on the considerations
outlined above, been discarded. In what follows, therefore, the
case for concrete is presented with steel as the background.
An opinion commonly expressed by shipping people is that
concrete may be suitable for the construction of lighters and such
small craft, but is totally unsuitable for seagoing ships. The
author is, however, of a different opinion and maintains that
concrete is even better suited for the construction of seagoing
ships than of lighters. Lighters must often be of the smallest
possible dimensions and draught for a given cargo capacity ;
and their shell must be particularly capable of withstanding
local blows and scratches due to rough handling, collisions with
wharves, etc. It is in regard to these requirements that concrete
INTRODUCTORY 5
compares least favourably with steel, as will be indicated in the
following pages and throughout the book.
It is common knowledge that concrete hulls are heavier than
steel hulls of the same outside dimensions. This is due to the
fact that concrete is not so strong as steel and, therefore, if a
concrete hull and a similar steel hull of the same dimensions
are to be equally strong, as they ought to be, a greater weight of
concrete than of steel must be used. The author does not believe
that concrete will ever be improved to the extent that it will
be equal to steel in strength and elasticity ; but such an improve-
ment is not necessary, since concrete has compensating advan-
tages over steel.
In comparisons between concrete and steel ships it is neces-
sary to assume as a basis either equality of deadweight carrying
capacity or equality of total displacement. All the concrete
ships built by the author were ordered on the basis of a
stipulated deadweight, and it is reasonable to assume that
for some time to come this custom will prevail on account of
the present uncertainty of the calculations of hull weight made
by inexperienced builders. Considering, therefore, a concrete
ship and a steel ship of equal deadweight carrying capacity, it
is obvious that the former will have a greater total displacement
because of her greater weight of hull ; and the greater displace-
ment can, in general, only be obtained by the adoption of larger
dimensions. Hence the concrete ship has a greater cubic capacity,
and a larger space available for deck cargo, than the steel ship.
This is a distinct advantage in trades where the cargoes commonly
carried are light and bulky, measuring about 70 cubic feet, or
more, per ton weight. For example, by far the greater propor-
tion of the war supplies transported from the United States to
France were so light in relation to their bulk that the ships
carrying them were completely filled before they had on board
sufficient weight to sink them to their designed load draughts.
Of course, the increased capacity involves the disadvantage of
increased harbour dues, since these are assessed on a cubic capacity
basis.
The foregoing elements in the comparison between concrete
and steel can be grasped by anyone who reasons the matter out
without any reference to actual experience with concrete. But
the following facts are the results of experience, experience
6 SEAGOING AND OTHEE CONCRETE SHIPS
gained by the author from the construction of about thirty
concrete ships, and experience gained by the owners, officers,
and crew who have run these ships in overseas trade for some
years :
Concrete ships
are cheaper to build, and cost less in upkeep,
are less subject to vibration from engines or due to
" panting," and, owing to the heavier hull, require less
ballast when " light," and so have easier movements in
rough seas,
are more quickly and more cheaply repaired,
are fireproof, are not subject to corrosion,
have better insulating properties for cargoes" such as ice,
fruit, etc.,
and are more easily kept clean.
Steel ships have the following advantages :
less weight of hull,
the shell is better able to withstand local blows and scratches
resulting from rough handling.
The question of structural strength does not enter into the
comparison since adequate strength can be provided in either
material. The time of construction is generally less for concrete
ships, but is not less than the war-time records achieved in
steel construction. The speed is practically the same for ships
of equal deadweight and engine power, but this comparison is
much affected by factors such as underwater shape and external
finish, whose influence may be greater than that of mere weight.
CHAPTER II
THE FIRST SEAGOING CONCRETE SHIP
Preliminary Consideration — Government Permit — Assumptions for Calcu-
lation Purposes — Method of Construction — Engine Foundations and Stern Post
— Concreting — Equipment — Launching — Trials — Docking for Inspection —
Results of Experiment.
Preliminary Consideration.— The construction of the Namsenfjord,
the first seagoing concrete ship, was an experiment based on the
favourable experience gained by the author from the construc-
tion of a concrete lighter in Manilla during his activity as a
Civil Engineer in the Far East.
In 1910-11 preparatory investigations of the possibility of
constructing seagoing concrete ships were begun, and the author's
first patents are dated January 1912. The building of the first
seagoing concrete ship was not, therefore, entirely due to the
world war ; but lack of capital and other circumstances delayed
the realization of ideas fully worked out in theory at an earlier
period.
In Norway anyone is free to build lighters of concrete or any
other material without regard to Government rules ; but the
construction of seagoing ships intended to carry a Norwegian
crew and flag is subject to the control of the Department of
Shipping.
In 1916 the author forwarded plans of a seagoing concrete
lighter of 2,700 tons deadweight carrying capacity to the Depart-
ment of Shipping. In order to obtain expert opinion on the
proposal the Department referred the plans to a specially
appointed Technical Committee.
The utmost doubt was freely expressed as to the possibility
of a concrete ship having the necessary strength and elasticity
to resist strains due to heavy seas and to vibrations from the
engines. Naval architects, concrete engineers, and sailors
expressed their unreserved opinions, through the press and
otherwise, that the whole idea was impossible and that a seagoing
i
8 SEAGOING AND OTHER CONCRETE SHIPS
concrete ship was doomed to disaster the first time she encoun-
tered rough weather. It was no wonder, therefore, that the
Government authorities hesitated to grant a permit for the
construction of such a ship.
Since no shipowner was found willing to take the risk involved
in ordering the first seagoing concrete ship, the author's firm
decided to build the Namsenfjord at their own expense and for-
FIG. 1. — M.S. Namsenfjord, on trial during August 1917. The First Seagoing
Concrete Ship.
warded an application to the Department of Shipping on 22nd
November 1916 for the necessary permit. The reply from the
Department, dated 9th December 1916, was to the effect that
a definite opinion could not be given until the proposal had
been investigated by the Technical Committee appointed to
consider the earlier proposal ; further, the author's firm was
required to promise to bear the expenses connected with the
investigation.
The project was discussed at a number of conferences with
THE FIRST SEAGOING CONCRETE SHIP 9
the Director of Shipping and his chief engineer, both of whom
gave it full consideration. Government officials closely watched
the practical experience gained daily with the concrete lighters
built by the author's firm ; and detailed plans and calculations
were worked out for the ship. Meanwhile the Technical Com-
mittee got to work ; and it was decided that plans and calcu-
lations must be approved by the Committee before the ship could
be built.
Government Permit. — From the elaborate preparations being
FIG. 2. — M.S. Namsenfjord. General Arrangement.
made it appeared that the investigation of the proposal would
take a long time ; and so the author asked the Chairman of
the Technical Committee, Dr. J. Bruhn, to support his applica-
tion to the Government for special permission to construct the
Namsenfjord on his own responsibility without waiting for the
approval of the Committee. The application was forwarded to
the Department of Shipping on 9th March 1917. The reply
from the Director of Shipping, dated 31st March, granted the
desired permission, but stipulated that the ship should not be
put into commission as a cargo carrier without a permit from
the Department, that such permit should be for smooth- water
10 SEAGOING AND OTHER CONCRETE SHIPS
service only, and that it should be given for a short period only,
being renewed for successively increasing periods if the per-
formance of the ship were satisfactory.
While awaiting hopefully the grant of the Government permit
for the construction of the ship negotiations had been carried
on with several shipowners ; and in January 1917 a contract was
signed with Mr. Anzjon, of Namsos, for delivering Namsenfjord
complete at a price of kr. 90,000 (about £5,000) ; Mr. Anzjon
intended to use the ship for the carriage of lumber on the coast,
but wanted her equipped also for the North Sea trade.
The main particulars of Namsenfjord are :
Length over-all, 84 feet ; breadth, 20 feet ; depth, 11-5 feet.
Cargo capacity (deadweight), about 200 tons.
Capacity of oil and fuel tanks, 5-5 tons.
Capacity of freshwater tanks, 8-0 tons.
Engine, Bolinder crude oil motor, 80 B.H.P.
Block coefficient, 0-75.
Designed speed, 7J miles per hour.
Total crew, 7 men.
Assumptions for Calculation Purposes. — In order to ensure
that the ship would be sufficiently strong, consideration was
given to :
(a) Local stresses, in bottom, sides, and deck, due to water-
pressure and to weights of cargo carried.
(b) longitudinal stresses, in bottom, sides, and deck, due to
bending arising from local inequalities of weight and buoyancy
along the length of the ship considered as a girder.
(c) Stresses due to vibrations set up by engines.
For calculation purposes the following assumptions were
made as regards permissible stresses :
Concrete : to have an ultimate compressive strength of at
least 4,000 Ib. per sq. inch at 28 days, the proportions of mixture
and the class of material being determined from practical tests
before commencing the actual pouring.
Permissible compressive stress, 1,000 Ib. per sq. inch.
Permissible shearing stress, 120 Ib. per sq. inch.
Steel Reinforcement : to be of open hearth, mild, medium-
grade steel, of ordinary shipbuilding quality, having an ultimate
THE FIRST SEAGOING CONCRETE SHIP
11
tensile strength of 28 to 32 tons per sq. inch and an elongation
of 20 per cent, in eight inches length.
Permissible tensile stress, 12,000 Ib. per sq. inch.
Permissible shearing stress, 8,000 Ib. per sq. inch.
The methods of calculation are discussed in Chapter XI.
and actual specimen calculations are given in the Appendix.
The disposition and amount of steel reinforcement are shown
in Fig. 3. Rods of from J to 1J inch diameter were used, amount-
ing in all to 10 tons.
FIG. 3. — Midship section of M.S. Namsenfjord. Left half through Hatch; right
half through Deck.
Method of Construction. — The actual construction of the hull
was carried out in accordance with a system devised by the
author, using a perforated metal lath instead of wood forms
for the sides, deck, transverse bulkheads, interior water tanks,
etc. Wood centring was, however, used for frames and deck
beams. The metal lath was stiffened and supported by the
wood boxes for frames and beams. The main reinforcing bars
were tied to the metal mesh. One layer of mesh was placed
near each surface of vertical plating, and concrete was poured
between ; the two surfaces were afterwards finished with cement
mortar.
12 SEAGOING AND OTHER CONCRETE SHIPS
Engine Foundations and Stern Post. — The most important
and difficult details were the engine foundations and the stern
post with rudder attached. Upon the satisfactory solution of
the problems involved in the design of these elements depended
largely the ability of the concrete ship to resist the strains due
to vibrations of the engines. It was hoped that the concrete
ship would show less vibration than a steel ship ; should this
FIG. 4. — Namsenfjord from aft, July 1917. The lower wood fender has now
been removed as it was found unnecessary.
not be the case the result might be disastrous for the mechanically
propelled concrete ship.
The engine foundation consists of two heavy girders, parallel
to the centre-line of the ship and connecting five transverse
frames. The stiffness of these girders ensures that the loads
due to engine vibration will be properly distributed over the
transverse frames and bottom slab. The engine bed-plate was
of cast iron, with holes for eight 1J inch holding-down bolts ;
openings were arranged in the concrete foundation girders to
*st •*
14 SEAGOING AND OTHER CONCRETE SHIPS
give access to the bolt-heads. It was considered preferable to
arrange wood packing between the engine bed-plate and the
concrete girders rather than to secure the bed-plate to the
concrete direct. The purpose of the packing is to relieve, to
some extent, the load on the holding-down bolts. The wood
packing was of oak, seven inches thick ; in later ships, however,
the thickness has been reduced to two inches. Heavy steel
reinforcement was placed near the tops of the foundation girders
and carried down at the ends to the bottom slab and transverse
frames for anchorage. Steel washers were arranged under the
holding-down bolt-heads, and the holes in the girder were filled
in with cement mortar after the bolts were placed. The arrange-
ment has proved satisfactory, no trouble having been experienced
up to date.
From Fig. 5 it can be seen that there is an interior stern
post of concrete constructed as part of the concrete hull. To
the concrete stern post is attached a wrought-iron post of rect-
angular section having a bearing for the propeller and a vertical
post for the rudder. The wrought-iron post is secured to the
concrete post by 17 anchor bolts 15-18 inches long and f inch
diameter with hooked ends ; these bolts were screwed into the
wrought-iron post on port and starboard sides alternately and
had their heads clenched. In addition, steel plates eight inches
wide were riveted to the wrought-iron post to form a channel
section enveloping the end of the concrete. The stern tube is
of cast iron, and is screwed into the wrought-iron post.
Concreting. — Before concrete was poured all the steel rein-
forcement in bottom, frames, and deck was placed in position.
Particulars of the mixtures used are given in Chapter IX. The
bottom, sides, and deck were concreted in a continuous operation.
Thereafter the transverse bulkheads, internal walls for water
tanks, galley, lamp-room, etc., were built by plastering cement
mortar on a metal mesh with an auxiliary reinforcement of
round bars horizontally and vertically. Steel dowels were
inserted in bottom and side frames while these were being con-
creted and recesses provided for the anchorage of the transverse
bulkheads to the hull ; this arrangement has proved satisfactory
as there have been no cracks observed between the bulkheads
and the frames.
Equipment. — The deckhouses were made of wood. Outside
THE FIRST SEAGOING CONCRETE SHIP 15
fenders and bilge keels of oak were bolted to the concrete hull,
| inch diameter bolts having been embedded in the concrete
beforehand. The hatch coamings were protected against chipping
by steel beams of channel section along the upper edges, the
webs of the channels being upwards. Wood ceiling 2J inches
thick was fitted on top of the inner bottom, and wood sparring
along the faces of the transverse frames ; see Fig. 3.
Officers' quarters, galley, etc., were located in the deckhouse,
and the crew's quarters under the deck forward. A 5 H.P.
motor winch was arranged on deck near the main hatch, and
the remaining equipment was similar to that on any other ship
of the size. In order to save weight open rails were fitted along
the sides rather than bulwarks.
Launching. — The ship was built on a platform consisting of
removable shuttering which acted as forms for the bottom.
The platform was fitted on rollers, and when the hull was prac-
tically finished the platform, together with the ship, was pulled
by an electric winch on to a steel launching car. When the ship
was on the launching car the propeller, shaft, and rudder were
shipped, and everything was ready for the launch on 25th July.
The first attempt at launching was unsuccessful owing to the
car jumping the track, due to the flanges of the wheels being
shorn off. The second attempt was also a failure owing to
settlement of the foundation piles of the slipway after the
launching car and ship had been lifted back into place. Applica-
tion was then made for the use of the floating crane belonging
to the Norwegian Navy. The crane was anchored alongside the
slipway, three wire strops were placed round the ship, and the
Namsenfjord was lifted in the air and lowered into the water on
the morning of 2nd August 1917.
Trials. — A couple of days after launching the machinery was
installed, and on 5th August the engine was tried while the ship
was tied to the wharf. Everything went well and on the follow-
ing day a private trial was made by the author on the Sound
at Moss.
On 8th August the Namsenfjord went on her official trial
with the Director of Shipping, his Chief Engineer, and several
consultants on board. A southerly gale was blowing in the
Christianiafjord which set up a heavy sea and so gave a good
opportunity to test the ship for seaworthiness, strength, and
16 SEAGOING AND OTHER CONCRETE SHIPS
general behaviour. The ship was light during the trial, which
lasted four hours and was entirely successful. The pilot in
charge expressed his great satisfaction with the ship, particularly
in regard to her easy movements, slight vibration, and steady
steering when going into a head wind and a heavy sea. The
average speed was 7J miles per hour ; it was found later that
the speed when loaded was rather over 7 miles per hour. After
the first few moments there was no nervousness on board in
regard to the seaworthiness of the ship ; and the confidence
gained will be appreciated when it is realized that the permit
for the construction stipulated that the trials should take place
in " enclosed waters where waves are entirely shut out."
Docking for Inspection. — Official comments were received
from the Director of Shipping as a result of his inspection during
the trial. Equipment and life-saving apparatus were slightly
improved. But before a certificate for coasting service could
be granted various trial trips with cargoes of stone, sand, or
lumber had to be made.
On 31st August the Namsenfjord received her first cargo, of
flour, at Moss and delivered it at Skien. A couple of minor
leaks were discovered during the loading, and when the ship
returned the Director of Shipping ordered her to be docked for
inspection. On 10th September the ship was inspected by the
Director of Shipping and assistants and by the Concrete Ship
Committee. The report of the Committee stated that the
inner bottom hindered inspection, also that some fine hair-
cracks of the usual type appeared in the concrete, but that
these were only in the surface and were not considered to
jeopardize the strength of the ship. Leaks in the fore peak and
crew's quarters were made tight and the peak tank tested under
water-pressure ; the leaks were due to faulty work when placing
bolts for the oak fenders on the stem.
Subsequent to the inspection the ship made several trips with
cargoes between Moss and Drammen. On 6th October an
official Certificate of Seaworthiness was issued, and a load-line
assigned ; the certificate was valid for one month.
During the war there was a shortage of fuel oil in Norway,
and the Namsenfjord, like other motor-ships, was forced to lie up
for a while until oil bunkers were again procurable, when the
ship was put into the coasting trade in southern Norway and
THE FIRST SEAGOING CONCRETE SHIP 17
afterwards to Namsos. At present she is carrying lumber on
the northern coast of Norway.
The following weights were noted when the ship was com-
pleted :
Tons.
Weight of hull 134
equipment .... 32
engine . . . . 8
Light displacement . . . .174
Deadweight . . . . .182
Load displacement . . . .356
Results of Experiment. — Generally speaking the Namsenfjord
was a successful experiment. She proved that the problem of
building a seagoing concrete ship propelled by engines was a
practical proposition.
It is obvious that in a first attempt of this kind experience is
gained from which details can be improved and errors avoided
in subsequent ships ; the following are typical instances :
(a) Deckhouses of wood are not satisfactory, since the joint
between the concrete coaming and the wood wall is never tight.
Outside walls should therefore be of concrete.
(b) Steel capping on the top of the hatch coaming, as in
Namsenfjord, is expensive and difficult to fit ; wood capping
should be used.
(c) The corners of the main hatch should be rounded or
bevelled and specially reinforced. No weakness was shown on
Namsenfjord, but this is an exposed detail on all ships, and
sharp corners should be avoided in concrete construction.
(d) A double bottom should not be arranged, at least in small
and moderate-size ships, since it increases weight, complicates
piping, and hinders inspection of the outer bottom.
(e) Wood packing should be fitted between the engine bed-
plate and the concrete foundation girders ; this may be about
two inches thick, that is, considerably less than adopted in
Namsenfjord.
(/) Double metal mesh for walls is not desirable ; it is better
to use only one layer of metal mesh, the concrete mortar being
plastered on up to three inches in thickness. Additional rein-
2
18 SEAGOING AND OTHER CONCRETE SHIPS
forcement of round or square bars may be wired to the mesh
as required.
(g) Gravel, even of | inch size, should not be used in concrete
or mortar for vertical walls in small ships ; it prevents the
mortar from properly surrounding the steel reinforcement, and
frequently jumps out when mortar is thrown from a trowel on
to a metal mesh. Since concrete containing gravel is, however,
stronger and cheaper than mortar containing only cement and
sand, it should be used in bottom and deck where the concrete
is poured over surfaces which are nearly level.
CHAPTER III
M.S. 8TIER AND M.S. A8KELAD
Negotiations — M.S. Stier— Strength Calculations — Constructional Details —
Construction — Official Trials — M.S. Askelad — Constructional Details — Official
Trials — The First North Sea Trip — Subsequent Service — Summary of Results.
Negotiations. — During the spring of 1917 the author had a
number of interviews with the Director of Shipping on the
subject of the construction of further seagoing concrete ships,
and requested permission to proceed without waiting on the
investigations of the Technical Committee which had been"
appointed by the Department of Shipping. The matter was
raised with the Prime Minister and eventually, following upon
a conference called together by the Minister of Shipping and
Commerce at which the Director of Shipping, the members of
the Technical Committee, and the author, amongst others, were
present, permission was granted for the construction of one ship
of 600 tons deadweight carrying capacity and one ship of
1,000 tons deadweight carrying capacity. The permits were
granted on condition that the author assumed all financial
responsibility, and it was stipulated that the ships should be
designed to have 20 per cent, more strength than the author
would ordinarily consider sufficient on the basis of his calcula-
tions, and that they should be particularly well equipped with
pumps and life-saving appliances ; it was stipulated also that
the ships should be tested in smooth water before proceeding
to sea, and that they should make several trips on the open
sea accompanied by escorting ships before being granted per-
mission to enter the North Sea and Coasting Trades. The
Technical Committee Accepted no responsibility for the behaviour
of the ships, but desired to be kept informed as to the experience
gained with them.
The permits for the construction having been obtained,
negotiations were commenced with a view to finding purchasers
19
20 SEAGOING AND OTHER CONCRETE SHIPS
for the ships. As in the case of the Namsenfjord this was not
an easy matter, as there were prejudices to be overcome. But
on 8th May 1917 a contract was completed with Mr. Gunnar
Brekke, of Christiania, for the 1,000-ton ship, and on 23rd May
a contract was completed with Mr. G. M. Bryde, of Christiania,
for the 600-ton ship. For each ship a fixed price was arranged
for the reinforced concrete hull ; all other work, including the
machinery installation, was to be carried out on the basis of
actual cost plus a percentage for profit. For the 1,000-ton
ship the fixed price for the hull was kr. 200,000 (about £11,000) ;
for the 600-ton ship the corresponding price was kr. 118,000
(about £6,500).
M.S. " Stier." — This ship is a cargo carrier of the flush-deck
type ; the main particulars are :
Length over-aU ..... 145' 0"
Length between perpendiculars . . 140' 0"
Breadth over concrete . . . . 27' 6"
Depth ...... 15' 9"
Contract deadweight (including bunkers) 600 tons
Capacity of oil fuel tanks ... 20 tons
Capacity of freshwater tanks . . 5 tons
Engine, Bolinder crude oil motor . . 320 B.H.P.
Block coefficient . . . . . 0-77
Tonnage, gross ..... 462-03
nett ..... 258-44
Capacities of holds :
Fore hold ..... 15,010 16,341
After hold . . . .14,608 16,027
Hatches ..... 1,560 1,590
31,178 33,958
The general arrangement is shown in Fig. 6. It was originally
intended to build a double bottom, but as the result of experi-
ence with the Namsenfjord this intention was discarded. Water
ballast amounting to 40 tons can be carried in the fore peak ;
the after peak can be used as a trimming tank. The forecastle
is raised about four feet above the main deck, and has concrete
bulwarks. Open rails are fitted at the ship's sides between the
M.S. STIER AND M.S. ASKELAD
21
forecastle and the steel bulwarks arranged in way of the deck-
house aft. The deckhouse contains accommodation for the
officers and crew, 11 men in all. The fuel and lubricating oil
are carried in three steel tanks. The fresh water is carried in
concrete tanks arranged in way of the engine-room.
Strength Calculations. — In the building permit granted by
the Government it was stipulated that the ship should be designed
to have 20 per cent, more strength than the author would
ordinarily consider sufficient. In order to determine the standard
of strength the author worked out according to the rules of
FIG. 6. — M.S. Stier, 600 tons deadweight. Capacity Plan.
Norske Veritas the sizes of frames, beams, etc., for a steel ship
of the same type and dimensions as Stier. For these members
of the structure moments of inertia and resistance were calculated
in the ordinary manner. These calculated values were then
increased by 20 per cent, and the resulting figures used as the
standards of strength for the reinforced concrete members. In
calculating the strengths of the reinforced concrete members
the permissible working stresses were taken to be 15,000 Ib. per
sq. inch, tension in steel, and 750 Ib. per sq. inch, compression
in concrete. The methods of making these calculations are
discussed in Chapter XI.
22 SEAGOING AND OTHER CONCRETE SHIPS
The desire was, of course, to build the ships as light as possible ;
but it was appreciated that nothing could be more harmful to
the development of concrete shipbuilding than lack of strength
in the first ships.
Constructional Details. — The structural arrangements are
FIG. 7. — M.S. Stier on official trial, 7th May 1918.
indicated in Fig. 8. The sizes of the main members are as
follow :
Item. Depth. Width.
Deck beams .... 8"-12" X 6"
Side frames . 11"-14J" x 6"
18"-24"
28"
3 J' '-4"
x sy
X 8J'
Bottom frames
Keelson ....
Deck slabs
Side slabs . . . . 4"-4J"
Bottom slabs .... 4"
The frame spacing is 4' 0".
The bottom frames are wider than the side frames ; the
extra width was added on one side in order to simplify the
M.S. 8TIER AND M.S. A8KELAD
23
centring. The side slabs were increased in thickness in the
regions of the quarter lengths where the maximum shear was
expected. The deck slabs were increased in thickness towards
the sides.
A longitudinal stringer, of concrete 14J" X 4", is arranged
LONG ITU D. SECTION
NEAR. K.E.EL5ON
FIG. 8. — M.S. Stier. Midship Section.
above the bilge at the top of the wood flooring. The bilge keels
are of concrete, of triangular section 7" X 1" rounded to about
3" at the outside ; the steel for these was placed before the
hull was concreted, but the concreting was done after the bottom
forms were removed.
The hatch coamings are of concrete 29" X 8", heavily rein-
24 SEAGOING AND OTHER CONCRETE SHIPS
forced, and run continuously from the fore hatch to the deck-
house aft. The tops of the coamings are protected by oak
capping 5" thick. Between the hatches the deck is raised to
near the top of the coaming.
The steel reinforcement is of round rods J" to 1J" diameter,
the size and disposition of the principal bars being shown in Fig. 8.
M.S. STIES AND M.S. ASKELAD
25
The longitudinal reinforcing rods are not spliced by welding
or directly connected in any other way. The rods are merely
placed alongside each other with the ends overlapping for a
length of 24 diameters ; a 90 degree hook, five diameters long,
is made at each end of each rod. In this manner it is arranged
that the tensile forces shall be transmitted by means of the
bond between the concrete and the steel. The overlaps of the
rods are distributed uniformly throughout the ship. The rods
are spaced about one diameter apart (in the overlap) in order
to allow of sufficient concrete being poured between them.
TRAN5V. SECTION NEAR. BULKHEAD
LOOKING FORWARD
FIG. 10. — M.S. Stier. Engine-room Arrangement.
In all, 58 tons of steel were used in the construction of M.S.
Stier.
The arrangement of stern post is similar to that in the
Namsenfjord, only heavier ; it is shown in Fig. 9.
The arrangement of the engine seating is also shown in Fig. 9,
and follows the lines of that in the Namsenfjord, except that in
the Stier the oak packing under the bed-plate is only two inches
thick.
The arrangement of the engine-room is shown in Fig. 10.
The freshwater tanks are of concrete, and on top is arranged a
steel fuel storage tank. On the starboard side, mounted on
concrete bearers, are another steel fuel storage tank, a daily
use fuel tank, and a lubricating oil tank. On the port side is
26 SEAGOING AND OTHER CONCRETE SHIPS
a 5 B.H.P. motor pump connected to all the pipe lines ; the
repair bench and tools are also arranged on the port side.
An oak fender, 5" X 1", is fitted around the hull at the deck
level. A similar fender, protected by J" steel plate, is bolted
to the concrete stem.
The walls of the engine casing, also the walls of galley, w.c.,
and lamp-room are of concrete.
The navigating bridge has wood planking on steel beams.
A 5 B.H.P. motor winch of 1J tons lifting capacity is fitted
at each hatch. The capstan is arranged for hand-power, but
can be driven by a messenger chain from the forward winch.
The steering gear is arranged for hand-power only. The bollards
and fairleads are secured to the deck by heavy bolts having
steel washers underneath. The deck is increased in thickness
under all fittings.
The chain pipes are of cast iron, and the concrete sides are
increased in thickness and have additional reinforcement where
the chain pipes come through. In order to provide against
abrasion by the anchors an outside finish of cement and iron
powder, one inch thick, was applied from the stem to a short
distance abaft the chain pipes ; this can be seen in Fig. 7. The
extra cement finish was found to be unnecessary and has not
been adopted in later ships.
Construction. — The Stier was constructed on a platform of
wood sheeting supported on timbers across the launching ways.
Double centring was used. For the exterior centring vertical
templates shaped to the lines of the ship were erected on the
wood platform, the spacing being generally about three feet,
but closer than this towards the ends of the ship. The centring
was of f" boards nailed to these templates.
Before the concreting was started all the reinforcement was
in position, also all the centring with the exception of the inside
forms for the side slabs, which were left open to facilitate con-
creting. As the concrete worked upwards the interior centring
was put in place ; thus the concrete was worked around the
reinforcement at every level.
The mixture of the concrete was approximately
1 part cement : 1 f parts sand : f part gravel.
This showed an average ultimate compressive strength of about
4,500 Ib. per sq. inch at 28 days.
M.S. 8TIER AND M.S. ASKELAD 27
The ship was successfully launched on llth March 1918,
and was ready for trial seven weeks later.
Official Trials. — On 7th May M.S. Stier went through her
first official trial, which was successful.
After preliminary trips in the Christianiafjord the ship went
to Skien and on with a cargo of saltpetre to Stavanger and
Bergen, thence to Aalesund, and back with a cargo of limestone
to Fredrikshald. This was a heavy cargo and the ship en-
countered a severe gale with a -rough sea at the exposed part of
the coast. According to statements by the captain and pilot
the weather was so rough that other ships of similar size refused
to put to sea. This trip was, therefore, a decisive test of the
seaworthiness and strength of the ship.
From the report, covering a month, of the Government
Inspector who accompanied the ship it appears that the pumps
were not used at all, as the ship proved to be absolutely tight.
Following on these trials the ship was docked on 7th June
at Moss Verft for official inspection by the Director of Shipping,
the Chairman of the Technical Committee on Concrete Ships,
the consultants of the owners, and other officials. The ship
was found to be in excellent condition without any signs of
weakness in the concrete hull, and a certificate of seaworthi-
ness was, therefore, issued by the Director of Shipping for
one year.
The speed of the Stier is 8 knots loaded and about 8-6 knots
light.
M.S. " Askelad." — This ship is a cargo carrier of the flush-
deck type ; the main particulars are :
Length over-all . . . .176' 0"
Length between perpendiculars . 170' 0"
Breadth over concrete . . . 31' 0"
Depth 19' 0"
Contract deadweight (including
bunkers) .... 1,000 tons
Capacity of oil fuel tanks . . 30 tons
Capacity of freshwater tanks . 7 tons
Engines, two Bolinder crude oil
motors 320 B.H.P. total
Block coefficient 0-77
28 SEAGOING AND OTHER CONCRETE SHIPS
Tonnage, gross . . . . 758-88
nett .... 422-55
Capacities of holds :
Bale. Grain,
cub. ft. cub. ft.
Fore hold . . . 22,600 25,000
After hold . . . 21,600 24,000
Hatches 1,800 1,800
46,000 50,800
The general arrangement of the ship is shown in Fig. 11.
The deckhouse, containing accommodation for 13 men, has the
external walls of concrete and the internal divisions of wood
The roof of the house, forming the navigating bridge, is of
wood on steel beams. The fore-peak ballast tank is of 60 tons
capacity.
The actual strength calculations are given in the Appendix,
and they are discussed in Chapter XI.
Constructional Details. — The structural arrangements are
indicated in Fig. 12. The sizes of the main members are as
follow :
Item. Depth. Width.
Deck beams . . . . 12" X 6J"
Side frames . . . . 13"- 17" X 6J"
Bottom frames . . . 22"-28" X 10"
Keelson 32" x 11"
Deck slabs .... 3J"-4J"
Side slabs .... 4"-4J"-5i"-6"
Bottom slabs 4"
The frame spacing is 4' 0".
The structural arrangements are generally similar to those
in the Stier.
The reinforcement is arranged in a similar manner to that
in the Stier ; square " rib " bars were, however, used exten-
sively. In all, 105 tons of steel were used.
The arrangement of the stern post is very simple, on account
of the ship having twin screws. The propeller brackets are
riveted to a vertical I-beam embedded in the concrete stern post.
The rudder post is of cast steel with flanges riveted on, and is
uJ
u
Q
O
t
Q
g
^r
00
Ik
"en,
29
30 SEAGOING AND OTHER "CONCRETE SHIPS
secured in the same manner as the slorn post in Namsenfjord.
Details of these arrangements are shown in Fig. 13.
The stern tubes are of cast steel, lined with cast iron, with
%"<> NEAR.
'OUTER. FACE.
REINFORCEMENT IN SIDES
SEEN FROM OUTSIDE.
REINFORCEMENT IN BOTTOM
5EEN FROM ABOVE. IN KEE.LSON
HI"-!/
BOTH WAYS
FIG. 12.— M.S. Askelad. Half Midship Section.
flanges to take anchor bolts ; longitudinal ribs are arranged
on the tubes to provide additional anchorage. Casings of steel
plate for the protection of the propeller shafts are fitted between
the propeller brackets and the stern tubes. Lubrication is
provided for the inner ends of the tubes.
M.S. STIER AND M.S. ASKELAD
31
The engine seatings are similar to those in the Stier, but on a
smaller scale because of the lower power of each engine as com-
pared with that in the Stier.
The arrangement of the engine-room is shown in Fig. 13.
The freshwater tanks are of concrete, and on top are the oil fuel
storage tanks, of steel. The daily use tank and the lubricating
32
M.S. STIER AND M.S. A8KELAD 33
oil tank are arranged at the sides ; these also are of steel. The
motor pump is of 5 B.H.P.
The deck machinery and fittings, also the fenders, are similar
to those on the Stier.
The arrangement of centring and the general method of
construction were the same as for the Stier. The mixture of
the concrete was not constant ; an average was
1 part cement : 1-8 parts sand : 0-7 part gravel
This showed an ultimate crushing strength of more than 4,000 Ib.
per sq. inch at 28 days.
No extra finish with iron powder was applied in way of the
chain pipes ; the ships' sides were increased in thickness about
1 J inches on the inside and additional reinforcement fitted.
The Askelad was launched on 8th June 1917 ; but at that
date she was called Oddfrid.
Official Trials. — On 21st August M.S. Askelad went through
her first official trial, which was successful. The vibration was
less than in the Stier, which had the same power, but concen-
trated in one engine. It was noted also with satisfaction that
the ship made nearly as good a speed as the Stier though having
75 per cent, more cargo capacity.
The Askelad carried out a number of trials with different
kinds of cargoes on the coasts of Norway. The trials were
perfectly satisfactory in so far as the concrete construction was
concerned, but minor troubles were experienced with the engines
and various improvements in deck fittings and equipment sug-
gested themselves. During the month of November heavy
weather was encountered by the ship in the course of her trials ;
on one day a heavy sea, which broke over the ship, stove in
the cover of the fore hatch. Reports sent in by the captain
and by the Government Inspector who was on board the ship
during these trial trips were perfectly satisfactory, and both
call attention to the fact that it was not necessary to use the
pumps at all during any of the rough weather.
Following on these trial runs the Askelad was docked at the
end of November for an official inspection. The concrete hull
was found to be entirely satisfactory, and so on 10th December
1918 the Director of Shipping issued a certificate of seaworthiness
3
34
M.S. STIEti AND M.S. ASKELAD
35
for M.S. Askelad for one year, permitting the ship to engage in
North Sea and Baltic trading.
Before the Askelad was completed the author had been
engaged in negotiations with the Government with a view to
obtaining a permit for a trans- Atlantic voyage. The Minister
of Shipping and Commerce requested, however, that the matter
be left over until the ship had carried out trials with different
cargoes and had crossed the North Sea. Unfortunately, by the
FIG. 16.— M.S. Askelad with Staal-Beton 19, the First Concrete Tug, alongside.
time the various trials had been carried out the owners had
fixed up a number of charters for the ship which ruled out the
possibility of an Atlantic trip.
The First North Sea Trip. — On llth December 1918 the
Askelad sailed from Christiania for Rouen, where she arrived
on the 23rd December. The cargo was 6,941 bales of wood pulp,
weighing normally 892 tons, but actually more, as the bales had
been lying exposed since the month of June and were wet through.
On the passage the ship had three days of very stormy weather —
36 SEAGOING AND OTHER CONCRETE SHIPS
a westerly gale with a heavy sea — and a few bales of the deck
cargo were washed overboard. This was the first crossing of
the North Sea by a concrete ship.
Subsequent Service. — After her first trip across the North
Sea the Askelad was engaged trading with all kinds of cargoes
to various Norwegian, British, Dutch, and Swedish harbours.
Occasional trips were made in the Baltic, where the ice proved
troublesome. During the period of speculation in shipping the
ship changed hands several times, always at a profit to the last
owner. On the conclusion of one of these transactions the new
owners asked for a report on the ship from the Captain, who had
been with the ship since she was built ; the Captain testified to
FIG. 17. — M.S. AsJc.elad, on trial, llth August 1918.
her general seaworthiness, to her steering qualities, and to her
low cost of upkeep. Fig. 18 will indicate that the Askelad was
put to hard service ; it shows her at Gravesend with a cargo,
including deck load, of wood pulp. The weather on the trip
across the North Sea from Gothenburg was very bad and the
deck cargo was shifted, bending and tearing up some of the rails
and stanchions on the deck. A further indication of the hard
service performed by the Askelad is given in Chapter VII.
On 9th September 1919 the Askelad was again docked for
an official inspection. Cracks were discovered in four deck
beams, and they were chiselled open for inspection ; they were
found to be only J"-l" deep, and were merely filled up again
with cement. The concrete of the hull was hammered all over,
38 SEAGOING AND OTHER CONCRETE SHIPS
and the bottom in the engine-room was cleaned of oil, scraped,
and chiselled open in places for inspection ; there were no signs
of the concrete being attacked by oil nor was any sign of weak-
ness found. Accordingly a certificate of seaworthiness was issued
for a further year.
The following data for Askelad are of interest :
Tons.
Weight of reinforced concrete hull . 733
„ equipment . . . 120
„ machinery . . . 31
Displacement, light . . . 884
Deadweight, freeboard 2' 6J" . . 1,036
Displacement, loaded . . . 1,920
The freeboard of 2' 6J" required by the Director of Shipping
is only temporary ; it is 3 J" more than would be required for
a steel ship of the same type and dimensions as Askelad. During
her official trials the Askelad was actually loaded down to a free-
board of 2' 3", and carried a cargo of 1,050 tons ; making an
addition for bunkers, fresh water, provisions, etc., the dead-
weight with 2' 3" freeboard amounts to about 1,090 tons.
The Askelad is continuously engaged in Baltic, North Sea.
and Channel trade, the owners being Messrs. A. I. Langfeldt &
Co., Christiansand.
It is difficult to obtain information about the Stier, now
known as the Aliakmon, for she was sold to Greece, first to E. D.
Papayannis and then to another owner ; at present she is
employed in Mediterranean and Red Sea service. The last
Norwegian captain of the Stier, who was also for a time captain
of the Namsenfjord, has reported very favourably on her, calling
attention particularly to the low cost of upkeep.
Summary of Results. — These trial ships have now been con-
tinuously in service for fully three years, and the experience
gained with them demonstrates that concrete ships possess
valuable qualities with which they were not originally credited.
Two features are, above all others, necessary for seagoing ships
built of any material : Strength and Watertightness. These are
of prime importance. All the other qualities — cost, deadweight
capacity, speed, running expense, cost of upkeep — are matters of
secondary importance, frequently affected by local considerations.
M.S. STIER AND M.S. ASKELAD 39
Until the Stier and the Askelad (together with the Namsen-
fjord) proved that the seagoing concrete ship possessed in full
measure the above qualities of prime importance they were
thought to be impossible of attainment with concrete as the
material of construction. A summary of the results of experience
as regards the " prime " qualities, and also the " secondary "
qualities, is given below.
Strength. — Both ships showed that the strength of the concrete
hull was ample. In fact, the author believes that the strength
as calculated by his methods could be reduced by 20 per cent,
without danger of weakness ; if this were carried out it would
put concrete ships on an equality with steel ships in the matter
of strength.
Watertightness. — Both ships have proved to be absolutely
watertight, and are in this respect superior to wood ships and
even to many steel ships.
Cost. M.S. Stier
Concrete hull only, without fittings
of any kind . . . . Kr. 118,000 (£6,500)
All equipment, engines, deck
machinery, etc., including in-
stallation . . . . Kr. 415,000 (£22,800)
Total cost . . Kr. 533,000 (£29,300)
M.S. Askelad
Concrete hull only, without fittings
of any kind . . . . Kr. 200,000 (£11,000)
AJ1 equipment, engines, deck
machinery, etc., including in-
stallation . . . . Kr. 493,000 (£27,000)
Total cost . . Kr. 693,000 (£38,000)
Cost per ton of deadweight :
Stier = Kr. 888 (£49)
Askelad = Kr. 660 (£36)
The cost of construction varied greatly during the war, and
so comparisons with costs for steel and for wood ships can be
made only between ships built in the same country. To the
best of the author's knowledge the Askelad was the cheapest
40 SEAGOING AND OTHER CONCRETE SHIPS
ship per ton of deadweight for her size and type built in Norway
during the period 1917-20.
Deadweight Capacity. — M.S. Stier carries just the deadweight
stipulated in the contract, namely 600 tons ; but M.S. Askelad
carries 1,050 tons, that is, 5 per cent, more than required by
the contract.
It should be remembered that, owing to the increased size
of ship as compared with a steel ship of the same deadweight,
the concrete ship has a greater cubic capacity per ton of dead-
weight than a steel ship.
Speed. — The Stier made 8-6 knots light and 8-0 knots loaded
on her trials. Later she showed a better speed. The Askelad
made a slightly better speed than the Stier, in spite of her much
larger cargo capacity. The Askelad' s speed is equal to that of
a steel ship of the same deadweight carrying capacity and engine
power. This is contrary to expectation in view of the heavy
concrete hull ; but it can be accounted for in part by the smooth-
ness of the concrete hull — there are no projecting rivet heads or
overlaps of plating — and the reduced skin friction.
Running Expenses and Upkeep. — The same crew and engine
power are employed in a concrete ship as in a steel ship of the
same cargo capacity, and so there is no difference in the costs of
fuel and wages. The trial ships were not painted either inside
or out, except with coal tar or antifouling composition on the
bottom below the waterline to prevent marine growth. (Experi-
ence showed that it was desirable to apply the antifouling com-
position direct to the concrete, when the surface became " as hard
as glass " and lasted very well.) There was, therefore, a saving
in this respect. Further, the low first cost of the ships as com-
pared with steel ships resulted in reduced " charges " for interest
on capital and for depreciation ; also it was proved that the costs
of repairs required by collisions or groundings were very low.
As far as the hulls are concerned there were many details
in which improvements could have been effected. But as the
slight defects noted were matters of arrangement or design,
and were not in any way due to the material of construction,
they need not be discussed here. As indicating a defect arising
out of the material of construction, it may be mentioned that it
was found necessary to fit panelling on the inside walls of concrete
deckhouses used for living-rooms.
CHAPTER IV
COMPARISON OF SOME SHIPS BUILT TO CLASS WITH
THE AUTHOR'S TRIAL SHIPS
Classification of Concrete Ships — Comparative Values of Cargo Carriers —
American Concrete Ships— S.S. Selma and Latham ; S.S. Cape Fear and Sapona.
Classification of Concrete Ships. — Concrete ships were first
recognized by classification societies in September 1917, when
Lloyd's Register of Shipping approved plans submitted by the
author for several types of seagoing concrete motor-ships and
barges, which were granted the Class " Al for Scandinavian
Coasting Service," "Subject to annual survey" and subject
to the notation " Experimental " being made in the Register
Book. At about the same time the Norwegian Veritas were
preparing their " Provisional Rules for Classification of Concrete
Ships." This recognition was of the first importance and was
partly due to the success of M.S. Namsenjjord, which a month
previously by practical demonstration had furnished indisputable
proof of the strength and seaworthiness of the Seagoing Concrete
Ship.
Class is to a ship what a report of good name and standing
in the community is to a man, and it was very important for
the new type of ship to secure even a modified form of class at
this early date. About twenty-five million tons of shipping, or
one-half of the world's entire tonnage, have been built according
to the rules of Lloyd's Register of Shipping, and of the remainder
by far the largest portion has been built to class in other institu-
tions. Obviously the first rules for classification of concrete
ships could only be of provisional character, pending further
practical experience, and they were naturally conservative and
" on the safe side." On the other hand, economy of materials
and labour in construction is of the utmost importance for the
future development of concrete ships in competition with steel
ships ; by economizing in the material worked into a ship the
41
42 SEAGOING AND OTHER CONCRETE SHIPS
deadweight carrying capacity is increased, and by economizing
in labour and materials the first cost is kept down. The problem
is, therefore, to determine how little material may be put into
a ship without the finished product showing signs of weakness.
Having this important point firmly in mind the object of this
chapter is to prove that concrete ships can safely be constructed
FIG. 19. — M.S. Patent, 600 tons deadweight, built to Class A 1 "Experimental"
in Norwegian Veritas. The ship is partly covered with ice while docking in
Christiania.
much lighter — with less expenditure of materials and labour —
than as required at present by classification societies.
Comparative Values of Cargo Carriers. — The principal factors
determining the commercial value of a cargo carrier are :
Carrying capacity.
Speed.
First cost.
Running expenses.
CONCRETE SHIPS BUILT TO CLASS
43
For ships of the same dimensions and outside shape, and
with the same engine power, the speed and running expenses are
the same and need not be considered in this comparison. But
comparisons of carrying capacities for two different sizes of ships
are given below ; they are drawn between trial ships built by
the author's firm and similar ships built by the author's firm
under the regulations of the Norwegian Veritas Classification
Society :
Trial ship Classed ship
Stier. Patent.
Trial ship Glassed ship
Askelad. Concrete.
Length over-all ....
145'0" 145' 0*
176'0" 176'0"
,, between perpendiculars
140' 0" 140' 0"
170' 0" 170' 0"
Breadth
27' 6" 27' 6"
31' 0" 31' 0"
Depth
15' 9" 15' 9"
19' 0" 19' 0"
Freeboard, loaded .
2' 0£" 2' OJ"
2' 6J" 2' 1\"
Block coefficient
0-77 0-77
0-77 0-77
Cargo capacity, /grain .
33,960 33,960
50,800 50,800
cubic feet \bale
31,180 31,180
46,000 46,000
Displacement in tons, light
565 572
884 940-5
Deadweight in tons
610 603
1,036 972-5
Displacement in tons, loaded
1,175 1,175
1,920 1,913
Reinforcement in hull, tons
58 68
105 120
Concrete in hull, tons
394 391
628 666-5
Weight of hull, tons
452 459
733 786-5
Engines (Bolinder motors), B.H.P. .
320 320
320 320
Singlescrew. Singlescrew.
Twin screw. Twin screw.
Speed in knots, light . .
8-6 9-0
8-6 8-0
,, ,, loaded
8-0 8-25
8-0 7-5
The slight differences in speed are probably due to internal
causes in the machinery ; all the ships built by the author's
firm have shown increased speed after they have been in service
for a time.
The table shows that the trial ships are lighter than ships of
exactly the same dimensions and outside shape built to class.
And it must be borne in mind that the trial ships have been proved
to possess ample strength.
Turning now to the question of first cost, it was found that
the unit costs of construction for M.S. Concrete were :
1-0 ton of concrete complete in place and launched . £14 8s.
1-0 ,, reinforcement ,, ,, „ „ . £47 15s.
These unit costs include all materials and labour for wood
forms, scaffolding, mixing, handling and placing of concrete,
handling and placing of steel, also all overhead charges.
44 SEAGOING AND OTHER CONCRETE SHIPS
They were worked out from the actual cost figures obtained
after the construction was finished. The buying prices were,
for steel £32 per ton and for Portland cement £1 7s. 6d.
per barrel delivered at the yard. The prices are high owing
to war conditions.
M.S. Concrete and M.S. Askelad were sister ships in every
respect but the detail design of the concrete hulls ; and as
shown in the table above, the differences in design involved in
the Concrete additional weights of 38-5 tons of concrete and
FIG. 20. — M.S. Concrete, 972-5 tons deadweight, built to Class A 1 " Experi-
mental " in the Norwegian Veritas.
15-0 tons of steel. Adopting the unit costs given above the
excess first cost of the Concrete as compared with the Askelad
amounts to :
38-5 tons of concrete at £14 Ss. = £554
15-0 tons of reinforcement at £47 15s. = £716
Total = £1,270
The cost of M.S. Concrete complete, including engines and
equipment, was £46 per ton deadweight ; and, as given above,
the deadweight carrying capacity of the Concrete is 63-5 tons
CONCRETE SHIPS BUILT TO CLASS 45
less than that of the Askdad. Expressing the reduction in
deadweight in pounds sterling the amount is :
63-5 tons at £46 per ton = £2,921,
which may be taken either as a reduction in selling value or as
an increase in first cost. Hence the total increased cost of the
Concrete as compared with the Askelad, an increase brought about
by the classification requirements embodied in the Concrete
amounts to £1,270 + £2,921 = £4,191. The total cost of M.S'.
Concrete complete was about £45,000, so that the increased first
cost amounts to 9 J per cent, per ton deadweight.
The increased first cost brought about by classification
requirements is emphasized if the cost of the naked hull alone is
considered ; and the differences between the Concrete and the
Askelad are only in the hulls — in machinery and equipment the
two ships are exactly alike.
The total cost of the hull of M.S. Concrete was £15,000, which
represents £15 8s. per ton deadweight. On this figure the
increased first cost corresponding to the reduction in deadweight
amounts to 63-5 tons at £15 Ss. per ton, that is, £978. The total
increased first cost of the naked hull is, then, £1,270 -f- £978
= £2,248. Hence the concrete hull built to class shows an increased
first cost o/15 per cent, as compared with a hull built to the author's
design.
It should be mentioned, too, that the Concrete was built
exceptionally light because the Norwegian Veritas consented to
some modifications in their provisional rules on account of the
author's experience in building concrete ships. The difference
in favour of the author's design is, therefore, not so pronounced
as in the examples given below, which refer to ships built to
class by others.
American Concrete Ships. — As further examples for comparison
are selected two types of seagoing concrete ships built by the
U.S. Shipping Board — Emergency Fleet Corporation — which
in January 1918 organized a special Concrete Ship Section
to deal with the new type of ship. The author is indebted to
the Engineers in charge of this department for various technical
particulars of the ships. The information as to the actual
carrying capacities of, and experience with, the finished ships
was obtained from the American Fuel Oil and Transportation
46 SEAGOING AND OTHER CONCRETE SHIPS
Company, Inc., of New York City, who at present own and
operate two of the largest ships. The information as to the
costs of the completed ships is taken from the reports of the
special " Committee on Reinforced Concrete Barges and Ships,"
presented to the conventions of the American Concrete Institute
at Chicago in 1920 and 1921. The prices are for the present
comparison calculated per ton actual deadweight:
All the ships were built to class in the " American Bureau of
Shipping," where they received "Experimental Class." The
author does not know how far the classification society influenced
the designs, but during a visit to Washington at the time the
designs were commenced he received the impression that nearly
all the details of the concrete hulls were fixed by the designers,
while representatives of Lloyd's Register and of the American
Bureau of Shipping were consulted on matters of naval archi-
tecture.
It is unfortunate that the two types of ships have always
been characterized as being respectively of 7, 500 tons deadweight
capacity and 3,500 tons deadweight capacity. The original
estimates showed considerably smaller figures, and the actual
carrying capacities are respectively: 6,380 tons deadweight and
3,078 tons deadweight.
A special light-weight aggregate concrete (see Chapter IX) was
used in building these ships, and it is difficult to say whether
the increased weights of hulls as compared with the estimated
figures were due to increased unit weight per cubic foot of concrete
— originally estimated at 107 Ib. per cub. ft. excluding reinforce-
ment— or if larger quantities of concrete were used in the hulls
than shown on the plans.
The gravel concrete used in the construction of the author's
trial ships weighed 140 Ib. per cub. ft. excluding reinforcement.
It was to be expected, therefore, that ships built of the special
light-weight concrete would have greater deadweight carrying
capacity in relation to the weight of hull than the trial ships.
But as is shown below, this is not the case ; on the contrary, the
concrete hull of M.S. Askelad is much lighter per ton deadweight.
S.S. "Selma" and "Latham"; S.S. ««, Cape Fear" and
" Sapona." — The first type of U.S. concrete ship is represented
by the oil-tankers S.S. Selma and Latham, owned by the American
Fuel Oil and Transportation Company, Inc. They are described
CONCRETE SHIPS BUILT TO CLASS
47
in Chapter VI. The second type is represented by the cargo
carriers S.S. Cape Fear and Sapona,, also described (see pp.
72-77) in Chapter VI. These ships have the same freeboards as
steel ships of corresponding types ; and in making comparisons
of carrying capacity, the same condition should apply to M.S.
Askelad. The demand for extra freeboard made by the Nor-
wegian Director of Shipping is no longer justified ; Lloyd's Register
of Shipping, for example, does not demand extra freeboard for
concrete ships as compared with steel ships of the same type.
The freeboard for M.S. Askelad should therefore be taken at
2' 3", as has been done in the comparison below.
None of the ships have shown unseaworthiness or lack of
strength ; the carrying capacities may, therefore, be compared
without any qualification of a technical nature :
Oil-Tankers SeZma
and Latham, of
light-weight con-
crete 420' x 53'
X 35' 6", free-
board 9' 0*.
Cargo Carriers
Cape fear and
Sapona, of light-
weight concrete
268' X 46' x 28' 3",
freeboard 4' 3".
Cargo Carrier
Askelad Trial Ship,
of gravel concrete
ITO'xSl'xIQ'O",
freeboard 2' 3*.
Loaded displacement, tons
Actual deadweight, tons
Deadweight
13,040
6,380
0-489
5,537
1-16
6,310
3,078
0-488
2,843
1-08
1,960
1,076
0-549
733
1-47
Loaded displacement
Weight of concrete hull, tons
Deadweight
Weight ot concrete hull
The above shows that the relative advantage of the author's
design, demonstrated by M.S. Askelad, is 12-J- per cent, increased
deadweight in relation to loaded displacement, or 31 per cent,
increased deadweight in relation to weight of concrete hull.
It may be argued that the Askelad is a motor-ship, while the
others are steamers, with considerably heavier machinery, thus
reducing the deadweight. This is true, but then it must be
remembered that the American ships are built of light-weight
concrete, weighing between 107 and 120 Ib. per cub. ft., while
the Askelad is built of ordinary gravel concrete weighing 140 Ib.
per cub. ft. Had the same volume of light-weight concrete been
used in building the Askelad, the weight of hull would have
120
been 628 X - = 538 tons, a reduction of 90 tons, which would
140
have given the trial ship a corresponding increase of deadweight
capacity.
48 SEAGOING AND OTHER CONCRETE SHIPS
The weight of Steel Reinforcement in the author's trial ships
was equal to 9| per cent, of the deadweight capacity. In the
U.S. Shipping Board's cargo carriers it amounted to 13J per
cent, and in the oil-tankers 21 per cent, of the deadweight capacity,
or respectively about 36 and 115 per cent, more reinforcement per
ton deadweight than in the trial ship.
The amount of concrete used in building the hull of the
Askelad was 0-343 cubic yards per ton deadweight, while the
amounts in the U.S. Shipping Board's cargo carriers arid oil
tankers work out at, respectively, 0-548 cubic yards and 0-457
cubic yards per ton deadweight, assuming that the light weight
concrete used in these ships really weighed 120 Ib. per cub. ft.
(average), as stated in the final report, 21st January 1921, of
the Committee on Concrete Barges and Ships. This shows that
respectively 60 and 39 per cent, more concrete was used per ton
deadweight to build the hulls of the classified ships than in the
author's trial ship.
From Mr. R. J. Wig's paper, "Methods of Construction of
Concrete Ships," published in the Proceedings of the Fifteenth
Annual Convention of the American Concrete Institute, vol. xv,
1919; pp. 276-7, it appears that the buying price of the chief
materials in Hull No. 1715 — an oil-tanker of the same type as
the Selma and Latham, built in Mobile, Ala. — came to about
£18 105. ($89) per ton of 2,240 Ib. for the steel, and about
13 shillings ($3-12) per barrel of Portland cement delivered at
the yard. The corresponding prices of materials used in building
the author's trial ships were much higher, viz. about £28 per
ton of steel reinforcement and about £1 5s. per barrel of Portland
cement. Lumber for making the wood forms and scaffolding
was about 20 per cent, cheaper in the construction of the
American oil-tanker than in the author's trial ships. But wages
were approximately 40 per cent, higher in the United States
than in Norway at that date (1918). At present they are prac-
tically the same in most trades. It becomes interesting, then,
to compare the actual first costs of the ships complete.
In the reports of the Committee on Reinforced Concrete
Barges and Ships the prices are stated as being $210-300 per
ton deadweight for the cargo ships, and about $200-280 per
ton deadweight for the oil-tankers, with the important proviso
that these prices refer to the purely nominal deadweight capacities,
CONCRETE SHIPS BUILT TO CLASS 49
and not to the actual capacities. Taking average figures from
the above prices, and varying them in accordance with the
relation between the nominal deadweight and the actual dead-
weight, the costs per ton deadweight are :
Cargo carriers, 3,078 tons deadweight,
similar to Cape Fear and Sapona . . ( $290) £60
Oil-tankers, 6,380 tons deadweight, similar
to Selma and Latham. . . . ($282) £58
Trial ship Askelad, 1,076 tons deadweight £35
In the above considerations, where unfavourable facts as
regards carrying capacities and prices have been proved against
concrete ships built to class, there has been no desire on the
part of the author to criticize the designers, who have worked
under the strain of war conditions and have been subject to handi-
caps which are not present when private enterprise takes the
initiative and assumes the whole risk. Nor has there been any
intention of presenting the superior points of the author's design
in an extreme manner ; for example, no allowance has been
made for the well-known fact that smaller vessels always are
more expensive in construction, and therefore command a higher
market price per ton deadweight, than larger ships.
More than 60,000 tons deadweight of seagoing concrete ships
of the above-mentioned types were actually constructed by
the U.S. Shipping Board. Reports on this tonnage will be
made known to the profession in all parts of the world ; and it
is therefore necessary to point out as strongly as possible that
concrete ships have been built successfully at a much lower cost
than these, with much lighter weights of hull, and with at least the
same, if not greater, strength.
CHAPTER V
CONCRETE TUGS, FLOATING DOCKS, LIGHTSHIPS, AND
LIGHTERS
The First Concrete Tug — The First Concrete Floating Dock — The First
Concrete Lightship — Concrete Water-Carrier — Concrete Lighters.
The First Concrete Tug. — There is one type of ship in which
cargo capacity is of practically no importance, and in which a
heavy weight of hull is an advantage rather than otherwise ;
that type is the seagoing or harbour tug, provided with powerful
machinery in order to tow or assist other ships, and made strong
enough to withstand the rough usage entailed by such service.
A tug must be seaworthy and easy to handle in all circum-
stances since she is frequently called upon to put to sea in weather
bad enough to keep larger ships in harbour. The commercial
value of a tug depends primarily on the type and power of the
engines, the fuel consumption, and the equipment for salvage
work, etc., while the size of hull is of secondary importance.
It may be assumed that the steel hull of an ordinary cargo carrier
costs about 40 per cent, of the total cost of the ship, whereas
the hull of a tug costs only about 25 per cent, of the total.
Accordingly the saving in first cost obtained by the use of concrete
for the hull of a tug is relatively less than for a cargo carrier.
There are, however, other advantages to be gained by building
tugs of concrete ; they may be stated as follows :
1. The towing force is superior to that of a steel tug of equal
engine power, particularly if equipped with internal-combustion
engines.
2. The life of the engines is increased and repairs and upkeep
expenses decreased, due to their being mounted in more rigid
hulls less subject to vibration.
3. The first cost, running expenses and costs of repairs, are
reduced.
Staal-Beton 19, the first concrete tug, was built by the author's
firm for private use, and was neither classed by a Registration
50
FIRST CONCRETE TUG 51
Society nor built under a Government permit ; but the authorities
knew of the construction and tacitly agreed, reserving, however,
the right to condemn the ship if she did not pass tests of sea-
worthiness and strength. Fortunately the trials of the tug were
perfectly satisfactory, and she has now given continuous good
service for nearly four years. There have not been the smallest
repairs carried out on either hull or engine during this time.
CREW'S QUARTERS
FIG. 21. — Tug Staal-Bzton 19. General Arrangement.
In the winter the tug is used for ice- breaking in the harbour at
Moss and in the Sound.
Definite proof of the advantages of concrete tugs can come
only from experience ; but Staal-Beton 19 is providing that
proof, and justifying expectations. With regard to the three
points mentioned above :
1. The superior towing force is due to the greater weight and
momentum of the concrete hull ; once the initial inertia has been
overcome a steadier pull is maintained on the tow-rope in a
rough sea. It must be borne in mind that the resistance of the
FIG. 22. — Tug Staal-Beton 19. Ready for Launching, 17th October 1917.
FIG. 23. — Tug Staal-Beton 19. On trial outside Christiania, October 1917.
52
FIRST CONCRETE TUG
53
tug itself is almost negligible in comparison with the resistance
on the tow-rope ; and many elements enter into the tow-rope
resistance — size and number of ships in tow and their steering
qualities, towing speed, currents, wind, length of tow-rope.
FIG. 24. — Tug Staal-Beton 19 breaking ice in the Sound at Moss.
2. After nearly four years of continuous service the engines
in Staal-Beton 19 are in perfect condition and have never been
repaired nor even had the foundation bolts tightened up. The
opinions of marine engineers who have had experience in concrete
ships must, until comparative figures can be obtained, be accepted
54 SEAGOING AND OTHER CONCRETE SHIPS
as further testimony in support of the claim advanced for longer
life of engines.
3. The costs of the Staal-Beton 19 were, in round figures :
hull £800, engines £1,100, equipment and installation £1,300,
total £3,200. The cost of the hull was found to be less than
ascertained costs of similar steel hulls of the same date.
Fig. 24 shows Staal-Beton 19 breaking ice eight to ten inches
thick without difficulty. There has been much discussion in
technical circles on the ability of concrete to withstand ice or
even sea- water, and various writers have referred, as examples,
to badly made concrete piers, etc., disintegrating, or fracturing,
with serious consequences. But from a personal examination
of Staal-Beton 19 the author can state that after three or four
winters in service, partly as an ice-breaker, there are no signs
whatever of abrasion or wear on the concrete bows. The hull is in
perfect condition everywhere. Neither repair, painting, nor
cement brushing has been done on the surface, which is in its
original state, without any protection or covering. The author
believes that Staal-Beton 19 is a conclusive example of the power
of resistance of shipbuilding concrete to the attacks of ice.
The main particulars of Staal-Beton 19 are :
Length between perpendiculars . 48' 0"
Breadth 12' 0"
Depth" r r
Block coefficient . . . . . 0-62
Engines, Bolinder motor . . . 50 B.H.P.
Weight of reinforcement in hull . . 5 tons
,, concrete ,, . 35 „
., equipment . . . . 15 ,,
,, engines . . . . 4 ,,
Light displacement . . . . 59 ,,
The detail design did not present any special difficulties, for
there was no need to save weight on the concrete hull and all
dimensions could be made ample, namely :
Deck slabs . . . 2J"
Side slabs . . . .3"
„ at bilges . 5"
Bottom slabs . . 3J"
Deck beams . . . 5" X V'
Side frames . . . 5" X 8"
Bottom frames . . . 7" X 10", 12", and 16"
Keelson 8" X 12"
FIRST CONCRETE TUG
55
The reinforcement in the deck, side, and bottom slabs con-
sists of a " rib " lath near the outside and J" and I" round bars,
W4>N
%
»
(k"^-6"O.C. BENT UP FROM
DECK PLAN.
SECTIONS THROUGH BOTTOM AT KEELSON
SECTIONS THROUGH FRAMES.
N
NEAR. BOTH rftCE5
(STAGGERED)
REINFORCEMENT IN F*RAME5 2f BULK1HEADS.
FIG. 25. — Tug Staal-Beton 19. Longitudinal Section, Deck, and Frames.
spaced from 3" to 12", staggered near both surfaces. The side
frames are reinforced with two J" rods near the inside face and
56 SEAGOING AND OTHER CONCRETE SHIPS
two J" rods near the outside, tied with iV stirrups 5" apart. The
bottom frames have the same reinforcement with an additional
I" rod near the top. The keelson is reinforced with three £"
rods near top and bottom ; it is divided from the fore end of
the engine foundation to the stern, forming a shaft tunnel
through the hold.
Two oak fenders were originally bolted round the sides, as
shown in the illustrations ; but the lower one was removed after
the first trials. The stem is protected by a 5" X 6" oak fender
faced with a f" steel flat bar. The towing hook, sliding on a
steel arc, is attached to the concrete hatch coaming around the
engine-room.
The First Concrete Floating Dock. — Many years before
seagoing concrete ships became an accomplished fact, the question
of constructing floating docks of concrete had been considered
by the author, and Fig. 26 shows the first concrete floating dock
ever built. It was ordered by A. S. Maritim, yacht and motor-
boat builders at Bestum, near Christiania. Since the dock was
intended to take only light pleasure craft a lifting capacity of
75 tons was considered sufficient ; during trials before delivery
to the owners it lifted 90 tons. After the first year of service
Messrs. Maritim, on their own initiative, expressed the following
opinion on the dock :
" BESTUM PH. CHKISTIANIA.
10 May 1918.
"It is a pleasure for us to advise you herewith that the
concrete floating dock, which you built for us last year, is working
just as satisfactorily now as last year, although it has been
frozen in the ice during the entire winter ; and the dock has
suffered no damage whatsoever, in spite of the fact that the ice
was never cut up around the floating dock.
" Respectfully yours,
A. S. MARITIM,
(s.) Alf Bryde,
Managing Director."
It should be added that subsequent experience to date has
been equally satisfactory, and that the dock every winter is
frozen in ice several feet thick, in the Bay of Bestumkilen, near
Christiania, where it is stationed. The ice exerts heavy pressure
CONCRETE FLOATING DOCK
57
against the sides ; and it is difficult to say whether steel and
wood docks would stand the strain as well, since it is customary
to cut the ice around them.
The dimensions of the dock are :
ft. in.
Inside breadth . . . . . 25 0
Outside breadth 36 0
Length 80 0
Depth of pontoon . . . . . .46
Total depth of sidewalls . . . . 20 0
£*
Reinforcement. Concrete.
FIG. 26. — Cross Section of the first Concrete Floating Dock.
The pontoon is divided by two longitudinal and two transverse
watertight bulkheads into nine compartments, each with a
separate pipe-line to the pumping chamber. Access is provided
to each compartment by manholes with watertight covers. The
bottom frames are spaced 4' apart ; they are of solid concrete
3" thick, provided with manholes and openings near top and
bottom for air and water, except in those acting as watertight
bulkheads. Fig. 26 shows a cross section of the dock. The
longitudinal bulkheads and top and bottom slabs of the pontoon
are all 2f" thick. The outer and inner walls of the side wings
are 2J" thick, and the top slab 3" thick. The reinforcement is
58 SEAGOING AND OTHER CONCRETE SHIPS
very light. In the slabs it is of lath with J" and -£s" round bars ;
the vertical frames are reinforced with f" to f" round bars.
Wood forms were only used in construction of interior frames
in wings and pontoon. All the slabs were plastered on " rib "
and " Hy. rib " lath except the bottom slab, which was poured
directly on the" wood platform supporting the dock.
The pump-house is located on top of one wing, directly over
the pumping chamber, where a centrifugal pump capable of
emptying the dock in an hour is fitted. A five horse-power
electric motor drives the pump, current being supplied from the
shore by cable. All the valves are controlled from the pump-
house, where a pendulum indicates the direction in which the
dock is trimming and so the routine in which the valves should
be operated. Four sluice valves on the outside walls of the
dock allow of it being filled, and lowered, very rapidly. The
pipe-lines are made of concrete, poured around five-inch terra-
cotta pipes ; but this construction is heavy and not altogether
satisfactory. Iron pipes permit of easier access to bends and
connexions. The keel blocks are of wood, four feet apart.
When the plans were being drawn out for the dock there
had been no experience accumulated relating to floating craft
of concrete other than lighters. It was therefore natural that
the design should be "on the safe side," and the dock is con-
siderably heavier than it need have been ; the weights are :
Tons.
Reinforcement in hull ... 20
Concrete in hull . . . . .170
Outfit, pumps, and motor ... 20
Light displacement . . . .210
Lifting capacity . . . .90
Loaded displacement . . . 300
The weights of concrete and steel amount, respectively, to
about 190 and 22 per cent, of the lifting capacity. These are
too high, even for small docks. Designs have been prepared by
the author for docks of 4,000 tons and 8,000 tons lifting capacity,
and these show the following calculated weights :
4,000 tons 8,000 tons
Lifting Capacity. Lifting Capacity.
Weight of concrete in hull 3,800 tons 7,000 tons
steel 450 800
59
60 SEAGOING AND OTHER CONCRETE SHIPS
In relation to the lifting capacities these weights are, respec-
tively, 95 per cent, and 88 per cent, for concrete, and 11 per
cent, and 10 per cent* for steel, showing that the cost per ton
of lifting capacity decreases as the size of dock increases.
There is perhaps no kind of floating craft more exposed to
corrosion than the pontoon of a floating dock, which is con-
tinually being filled with, and emptied of, salt water. The
numerous interior bulkheads offer extensive surface for attack,
and repairs are expensive on account of the difficulty of docking
large floating docks. The best material for the construction of
such craft is shipbuilding concrete ; the advantages and dis-
advantages in comparison to wood or steel can briefly be summed
up as follows :
1. The first cost of concrete docks is considerably lower ; broadly
speaking, it comes to about 60 to 70 per cent, of steel docks.
2. The upkeep expenses of concrete docks are practically nil ;
while those for steel docks are considerable, because of the
liability to corrosion inside and out.
3. Repairs are much cheaper for concrete docks. There are
no bottom plates to renew, and practically all local damage below
the water-line can be repaired by the assistance of divers, without
the necessity of docking.
4. Water tightness and fireproofness of concrete docks are
superior to those of either steel or wood docks.
The disadvantages of concrete docks are :
1. Increased size for the same lifting capacity. This is
important only if space is limited where the dock is to be located,
or if the depth of water does not permit of increased depth of
pontoon.
Greater liability to local damage from collisions with ships if
the concrete surface is not protected by fenders.
Neither of these objections is serious, and local conditions
will frequently reduce both to a minimum. The author firmly
believes that within the next two or three generations all floating
docks will be built of shipbuilding concrete, just as at present
excavated dry docks are lined with concrete.
The First Concrete Lightship. — Another stationary type of
floating craft which is built to greater advantage of concrete
than of steel or wood is the Lightship. The demand for such
ships is very limited, particularly in Norway, where deep water
FIRST CONCRETE LIGHTSHIP
61
is found everywhere close in to the shore, and lighthouses erected
011 islands give good service. When the Director of Lighthouses
decided to station a lightship at a subaqueous rock in the
approach to Christiania — the Ildjemsflu — concrete was selected
as the most suitable material, and the author's firm was requested
to build the ship. While having the distinction of being the
only lightship in Norway and the first ever built of concrete
the Ildjernsflu presented no difficulties of design, and details are
not of special interest. Fig. 28 shows the ship after two years
Fio. 28. — The first Concrete Lightship — Ildjernsflu — stationed at the approach
to Christiania since 1918.
of service ; she was completed in 1917, except for the machinery,
and was stationed at the rock in the following year.
The ship has given entirely satisfactory service in spite of
exposure to more severe strains than originally anticipated.
The Director of Lighthouses has given the author the following
information on the matter :
" The rounded form, smooth surface, and flat bottom of the
vessel serves its purpose of enabling the lightship to rise on
the ice jams, and no ill effects can be seen from the ice. The
hull is made rather too short and rose almost on end in rough
seas. Since the chain was fixed to a loop through the chain pipes
at the bow, a terrific pounding was caused against the ship's
62 SEAGOING AND OTHER CONCRETE SHIPS
bottom when rising on the seas. In November last year during
a very severe gale the vessel broke its moorings by snapping
both anchor bolts, each 2" diam., fastened in the rock, and
drifted in through the harbour, where she was rescued before
any damage was done to the concrete hull. When being re-
stationed at Ildjernsflu a strong loop of hemp cable was carried
around the aft end and attached nearly at the centre of the
ship (as on tugs), and the chain was fastened to this loop. The
arrangement has been satisfactory, and has greatly eased the
heavy pounding from waves on the ship's bottom and the strain
on the moorings."
The ship is quite small, having the following dimensions :
ft. in.
Length between perpendiculars . 42 0.
Breadth 18 0
Depth 90
The materials in the hull were 6 tons of reinforcement and
52 tons of concrete, making the total weight of the naked hull
58 tons. Machinery was installed for supplying power and
compressed air to the sirens and the light. Cabins were fitted
up for the keeper and his family, and large supply tanks for
fresh water were built of concrete against the ship's side. The
remaining space was taken up by store-rooms for fuel, food, etc.
The advantages obtained by building lightships of concrete
compared to steel are :
Lower first cost and upkeep, perfect watertightness and
better insulation against cold and heat for the crew. A concrete
lightship once moored at its station should — barring severe
accidents — never need to be removed for docking or survey.
The Ildjernsflu is painted a bright red, and most ships passing
by probably have no idea that she is built of concrete.
Concrete Water Carrier. — This ship is also very small, the
dimensions being 60' 0" X 18' 0" X 7' 6", and she carries about
75 tons of fresh water. The engine is a 38 H.P. Scandia motor,
giving a speed of 5 miles an hour. The hold is divided up by
portable wood bulkheads longitudinally and transversely to
prevent the water moving about too freely. When these are
taken away the boat is used to carry ordinary cargo.
As regards carrying water, it will probably be admitted that
CONCRETE WATER CARRIER
63
concrete is much cleaner, and easier to keep clean, than either
wood or steel ; and it should be recorded that no influx of salt
water has ever affected the freshwater cargo in Bjorvika,
although at the time of her construction many engineers had
serious doubts as to the possibility of making concrete perfectly
watertight.
Concrete Lighters. —In Chapter I it has been stated that,
contrary to an almost universal impression, shipbuilding con-
crete is not utilized to its best advantage when used for con-
structing lighters. And yet a considerable number of such
craft have been built in different countries at various periods,
FIG. 29. — Concrete Water Carrier Bjorvika, built for harbour service in 1917.
dating back twenty-five years or more. It is even claimed that
a small row-boat of concrete was built in 1854 by Lambot, and
exhibited by him at the World's Fair in Paris that year. The
author has given the problem considerable attention during the
past twelve or fourteen years, and has built numerous lighters
of different types and sizes. The first one was constructed in
Manilla, the others in Norway.
During the past few years many misleading and incorrect
statements have appeared in the technical and public press
about concrete lighters. Frequently the writers have been
entirely ignorant of the subject : some have been theoretical
enthusiasts, whose designs on paper were the sole foundation for
64 SEAGOING AND OTHER CONCRETE SHIPS
their extravagant claims ; others have condemned the whole
idea of using concrete for any kind of floating craft, merely from
unsatisfactory experience with perhaps one or two concrete
lighters.
Conditions differ greatly in different countries and there is
no material of construction, wood, steel, or concrete, which is
best under all conditions of service. On the large rivers in the
forest regions of Russia and Siberia wood lighters — sometimes
of a temporary, raft-like character — are built at a trifling cost
to transport native produce down the river, where they are
FIG. 30.— Standard type of 100 tons deadweight Concrete Lighter. The first
built in Norway, August 1916.
knocked apart and the materials sold at the end of the journey.
Obviously in such a trade neither steel nor concrete can compete
with wood. On the inland canals of Europe and America, where
locks and waterways are frequently limited in dimensions, and
the lighters always move in entirely enclosed waters, steel boats
of extremely light construction are the most efficient cargo
carriers, owing to their very light weight and draught. Further,
in the districts intersected by these canals steel lighters can be
built very cheaply. Where there is plenty of water, and the
cargoes are light in relation to their bulk, like lumber, for example,
and conditions do not impose frequent collisions with docks,
CONCRETE LIGHTERS AND BARGES
65
concrete lighters may be most suitable on account of their low
first cost and upkeep expenses.
Concrete lighters have given also good harbour service. The
author's firm constructed in 1916 two lighters of the type illus-
trated in Fig. 30 for A.S. Laegterkompaniet, the largest lighter
owners in Christiania. These owners have testified (in a letter
dated 21st February 1917) to the good service given by these
FIG. 31. — Open Concrete Barge, 60 tons deadweight, for river and harbour
service.
two lighters ; they have recorded that the lighters have been
frozen up for several weeks, and that they have been towed
through the ice in Christiania harbour, without apparently
suffering any damage.
These standard type lighters are of light construction, the
average thickness of the deck, side, and bottom slabs being
2£ inches. The frames are 9" X 4", spaced 5 feet apart ; the
transverse frame at amidships is heavier than the others and is
carried across the hatch in an arc, forming a support for the
5
66 SEAGOING AND OTHER CONCRETE SHIPS
hatch covers. There are two transverse bulkheads, 2 inches
thick, having a cargo hold between them 48' 0" long ; the cargo
hatch is 40' 0" X 12' 6". Wood centring was used only for the
platform on which the bottom rested, and for the interior
frames ; the concrete in the side and deck slabs was plastered on
a stiff metal lath to which was secured additional reinforcement
in the form of round bars.
The author's firm has built also some 250-ton lighters of similar
design to the 100-ton lighter, and a very small type of open river
barge, shaped like a box, with a pointed stem ; one of the latter
is illustrated in Fig. 31. This figure shows also a couple of
concrete mooring buoys, of which several have been built ; they
are giving satisfactory service and have not been pumped out
since they were placed in position four or five years ago.
The particulars of the lighters and the barge are :
250-ton 100-ton 60-ton
Lighter. Lighter. Barge.
Length between perpendiculars . 80' 0" 64' 0" 47' 0"
Breadth (maximum) . . .20' 0" IS' 6" 15' 0"
Depth . . . . .11'$* 7' 6" 5' 6"
Weight of reinforcement, tons .10 5 2
concrete „ . 122 49 25
hull „ . 132 54 27
outfit 13 63
Light displacement ,, .145 60 30
Deadweight „ .250 100 54
Loaded displacement „ .395 160 84
Block coefficient .... 0*84 0*80 0'935
Cost in 1916 .... £1,750 £450 £260
More than a dozen lighters of these types have been built
and are now in service in various parts of Norway and Sweden.
The various elements involved in a comparison between
concrete lighters and steel or wood lighters are discussed below :
First cost is nearly always highest for steel and lowest for
wood, with concrete between ; but in localities where wood for
shipbuilding purposes is difficult to obtain concrete may prove
cheaper than wood.
Upkeep expenses are larger for both steel and wood.
Repairs cost more for both steel and wood ; but since concrete
CONCRETE LIGHTERS AND BARGES 67
is more liable to local damage on the surface than steel or wood,
the greater frequency of repairs may even up the balance.
The lifetime will probably be longer for concrete than for
either steel or wood, but there is not a long enough experience
of concrete craft to provide data for a definite conclusion ; it
should, however, certainly be the case in tropical countries,
where wood hulls are liable to destruction by insects and steel
hulls to destruction from corrosion.
Strength is a matter of design and can be made sufficient
with any of the materials of construction.
Cargo capacity in cubic feet per ton of deadweight carried is
greater for concrete than for steel or wood. This is due to the
greater weight of concrete, requiring the provision of a larger
hull for a given deadweight carrying capacity. This is an
advantage if light cargoes are to be carried, but a disadvantage
if dimensions are restricted, as by locks, etc.
Speed. — Experience has shown that in spite of the greater
weight of concrete lighters they do not require appreciably
greater towing power than steel or wood lighters of equal dead-
weight capacity.
Watertightness is a necessity for all lighters ; with the passage
of years wood lighters often open up at the seams and become
leaky, whereas concrete lighters generally become perfectly tight,
even if they leak slightly immediately after being launched.
The fire-resisting qualities of concrete are better than those
of steel or wood.
Liability to marine growth is about the same for the three
materials ; but concrete is easier to clean because of the absence
of rivets or seams.
The time required for construction is roughly the same for the
three materials ; but in out-of-the-way places concrete lighters
are easier to construct because less equipment and skilled labour
are required, and all the materials are easily handled without
the use of cranes or machinery.
CHAPTER VI
SHIPS BUILT IN THE UNITED STATES
The Faith — U.S. Shipping Board Investigations — The First U.S. Standard
Concrete Ship — Ships actually completed — Oil-Tankers — Oil-Storage generally.
The " Faith." — One ship stands out prominently in the develop-
ment of seagoing concrete ships, the Faith, built by the San
Francisco Shipbuilding Co. at Redwood City, Cal. This was the
first seagoing ship built in America of the new material ; and at
the time of her completion she was by far the largest concrete
ship in the world. To Mr. W. Leslie Comyn, president of the
shipbuilding company, and to Messrs. Allan MacDonald and
Victor Poss, the engineers who designed the ship, great credit is
due for their splendid and successful achievement.
Construction was started in September 1917 on the meadow
bank of a narrow estuary, where the ship was launched on
March 14th, 1918. A couple of construction sheds were all that
remained to indicate that a large ship had been constructed in
the place ; the usual heavy cranes and equipment of a shipyard
were conspicuous only by their absence.
The main particulars of the Faith are :
Length between perpendiculars . . 320' 0"
Breadth 44' 6"
Depth 3<y 0"
Freeboard, loaded . . . 6' 0"
Load displacement .... 8, 150 tons
Block coefficient . . . .0-835
Engines, triple expansion type . . 1,700 I.H.P.
Speed ...... about 10 knots
The designed deadweight capacity was 5,000 tons ; and it has
been stated that the actual deadweight capacity is 4,500 tons.
The latter figure would correspond to a " light " weight of 3,650
tons and a concrete hull weight of 2,700 tons. On the other
68
SHIPS BUILT IN THE UNITED STATES
69
hand, it has been stated also that the hull includes 520 tons of
reinforcement and 1,500 cubic yards of concrete ; at 138 Ib.
per cubic foot the weight of concrete would be 2,495 tons, which
with the steel would give a hull weight of 3,015 tons and a
deadweight capacity of 4,185 tons, and not 4,500 tons as given
above. The author does not know which of these deadweight
figures is correct. But according as the higher or lower figure
is taken the relation of the deadweight capacity to the loaded
FIG. 32. — S.S. Faith. Ready for the launch.
displacement is 55-2 per cent, or 51-3 per cent. Both of these
percentages are higher than those obtained in the concrete ships
built by the U.S. Shipping Board, even though these were built
of light-weight concrete.
The estimated cost of the Faith was $300,000 to $400,000;
the actual cost was $750,000.
The Faith is constructed with longitudinal framing between
heavy transverse frames spaced 16 feet apart. Deformed bars
provided'with lugs were used in order to obtain the best possible
70 SEAGOING AND OTHER CONCRETE SHIPS
band between concrete and steel. The side and bottom slabs
are 4" to 4J" thick, reinforced diagonally ; the shelter deck slabs
are 3" to 3J" thick. The poop, bridge, forecastle, and main
decks are of wood, as is also the ceiling on the floors in the cargo
holds. There are seven watertight bulkheads of concrete.
The Faith was launched six weeks after the pouring of the
concrete was started, and the builders were so satisfied with
the launch that it was considered unnecessary to give the hull
a trans- Pacific towing trial as originally intended. The installa-
tion of the machinery was therefore started right away, and a
couple of months later the ship was completed and ready for
her first trip. She made journeys with different cargoes to
Vancouver, Tacoma, Honolulu, Chile, and through the Panama
Canal to New York, arriving there in November 1918, after
having travelled some 12,000 to 15,000 miles. While in New
York the ship was inspected by many engineers and shipping
men, who all declared her to be perfectly sound and seaworthy.
Some minor details on deck might have been improved, such as
the attachment of the wood deckhouses and the winches. A
slight leakage of fuel oil from the concrete tank forward of the
engine-room bulkhead had occurred as the result of a light oil
being used on one journey ; this was remedied by steaming out
the tank and covering the inner surface with spar varnish, and
it is understood that no further percolation of oil has taken place.
The ship was perfectly watertight ; and there was no sweating
in the holds. In rough seas she exhibited the easy movements
and lack of machinery vibration which are characteristic of
concrete ships. It has been stated that cracks have occurred
in the concrete deck as the result of longitudinal strain ; if this
were so, they seem to have been of minor importance and only
in the upper surface, which now is covered with an inch of asphalt.
During the spring of 1919 the Faith arrived in London, being
the first concrete ship to cross the Atlantic. Subsequently,
the ship was sold to Italian owners and is at present trading in
European waters.
Mr. W. Leslie Comyn, builder and first owner of the Faith,
whose energy, courage, and financial backing made the con-
struction possible, is a business man, not an engineer ; but he
knew that wood ships built of green lumber were foredoomed
to failure, and he realized the difficulties involved in the building
SHIPS BUILT IN THE UNITED STATES
71
of steel ships on the West Coast, separated from the rolling mills
by almost the width of a continent whose railways were suffering
from war-time conditions. When, however, he proposed the
construction of concrete ships to the U.S. Shipping Board he
received at first no support. There is no need to dwell on the
difficulties he encountered. But it may be mentioned that in
1920 the American Concrete Institute awarded him a special
medal for his meritorious work.
FIG. 33. — S.S. Faith going through the Panama Canal.
U.S. Shipping Board Investigations. — The U.S. Shipping
Board was organized to meet the enormous demand for tonnage
at the time when America entered the war. The large majority
of the ships constructed by the Board were of steel, but several
hundred wood ships and a dozen concrete ships were also
constructed.
During the summer of 1917 numerous suggestions as to the
building of concrete ships were made to the Board by the author
through his brother, Hermann Fougner, C.E., and others, but
with no immediate results. In October, after the Namsenfjord
had demonstrated by actual trials the possibilities of the seagoing
concrete ship, the author crossed to the United States and had
72 SEAGOING AND OTHER CONCRETE SHIPS
several conferences with leading members of the Board ; it was
suggested that the Board should purchase a concrete ship then
under construction in Norway by the author's firm. By the
new year the suggestions and conferences had borne fruit to the
extent that it was decided to institute a concrete ship section to
investigate the whole position in regard to concrete ships.
The Concrete Ship Section of the Board was organized by
Mr. R. J. Wig, who was first the Chief Engineer and latterly the
Head ; it was staffed by expert concrete engineers from all over
the country. Very elaborate theoretical investigations were
carried out, and also extensive laboratory experiments and
tests of structural details of the proposed ships. The tests were
of a magnitude beyond the resources of the private concrete
shipbuilder. For example, a 5,000-ton machine was used for
testing full-size specimens of bottom frames ; particulars of
experiments and tests can be obtained in " Structural Laboratory
Investigations in Reinforced Concrete made by Concrete Ship
Section, Emergency Fleet Corporation," by Mr. W. A. Slater,
in the Proceedings of the American Concrete Institute for 1919.
Following upon the investigations and tests a " Special
Report ... on the Advisability of Constructing Concrete Ships "
was presented by Mr. Wig to Mr. E. N. Hurley, the Chairman of
the Board, on 5th April 1918. In the Report it was stated that
the concrete ship could be built structurally equal to any steel
ship ; that the concrete ship would be durable for several years ;
that the cost of the concrete ship complete would be from $100
to $125 per ton deadweight ; that the construction of concrete
hulls would not interfere with the existing Shipping Board
programme for the building of steel and wood ships ; and that, if
operations were started at once, approximately 560,000 deadweight
tons of concrete ships could be completed by the end of 1918.
On 9th April 1918 the Chairman of the Shipping Board sub-
mitted to the Treasury an estimate of appropriation covering
an emergency fund for concrete ships, and on 12th April it was
approved and authorized by President Wilson.
The First U.S. Standard Concrete Ship. — Appended to the
report of 5th April 1918 was a description of the proposed ship
whose plans had been fully worked out by the Concrete Ship
Section, and which provided the basis for the estimate of the
tonnage which could be constructed by the end of 1918. The
SHIPS BUILT IN THE UNITED STATES
73
main particulars of the design, and the estimated weights, were
given as :
Length between perpendiculars . . 268' 0"
Breadth 46' 0"
Depth ....... 28' 3"
Draught ...... 23' 6"
Weight of hull ..... 2,500 tons
„ equipment and outfit . . 191
„ propelling machinery . . 206 ,,
Margin . . . . . 75 „
Light displacement .... 2,972 tons
Weight of reserve feed . . . 80
ordnance . . . . 23 „
fuel 300 „
stores 40 „
cargo . . . 2,760 „
Total deadweight .... 3,203 „
Load displacement . . . 6,175 „
Deadweight
Load displacement
The Cape Fear and Sapona, referred to in Chapter IV, p. 46,
are of this class ; accordingly the actual deadweight capacity
worked out at about 3,078 tons, and the cost per ton deadweight
at about $290.
The general arrangement, including number and positions of
bulkheads, was very similar to that of the wood standard ship
of the same dimensions ; the propelling machinery also was
similar to that of the wood standard ship.
Calculations of the structural strength gave the following
results :
Condition of Ship.
Maximum
Bending
Moment.
Maximum Fibre Stress.
Maximum
Fibre Stress in
Concrete.
Deck
Reinforcement.
Keel
Reinforcement .
ft. tons
tons/in.2 ten.
tons/in.2 comp.
lb/in.2
Ship without cargo, hogging
25,175
5-53
2-80
728
Ship fully loaded, hogging .
37,000
5-63
2-95
766
comp.
ten.
Ship without cargo, sagging
14,400
2-63
1-28
270
Ship light but with cargo
in forward hold for trim-
ming purposes, sagging .
11,960
•2-19
1-07
210
Ship fully loaded, sagging .
9,400
1-72
0-84
70
74 SEAGOING AND OTHER CONCRETE SHIPS
For a steel ship of the same size and type the maximum tensile
stress, for the conditions for calculation used above, would be
from 5 to 8 tons per square inch. In addition to the " structural "
stress there is a stress due to bending of the plating between
frames due to water-pressure ; this local stress is seldom taken
into account in steel ships, but was calculated for the 268 feet
concrete ship and was found to add. about 3 tons per square inch
to the tensile stress in the reinforcement.
The strength of the transverse frames was investigated for
various conditions of loading and various immersions of the ship,
FIG. 34. — S.S. Polias. Built for the U.S. Shipping Board by the Fougner Con
crete Shipbuilding Co., New York, October 1919.
upright and inclined. The maximum permissible stress in the
steel was taken at 15,000 Ib. per square inch.
The bulkheads were designed to carry a head of water up to
the deck on either side. For the collision bulkhead and the aft
peak bulkhead the maximum permissible stresses were taken
at 1,500 Ib. per square inch compression on concrete and
16,000 Ib. per square inch tension on steel ; for the engine-room
bulkheads the maximum permissible stress on the steel was taken
to be 20,000 Ib. per square inch. In the design of bulkheads for
steel ships it is common practice to use a permissible stress of
22,000 to 23,000 Ib. per square inch.
SHIPS BUILT IN THE UNITED STATES
75
The deck was designed to carry a five feet head of water ;
this was in excess of the loading assumed for the steel standard
ships then being built for the Board.
Ships actually Completed. — The policy of the Shipping Board
involved the concrete- ship- builder preparing his yard before
commencing actual ship construction. As things happened,
this was not a sound policy. There was a large number of yards
turning out wood ships, ships whose success was, at that time,
problematical and whose failure is, now, definite. It would have
JMfe
FIG, 35,— S.S. Selma.
Built for the U.S. Shipping Board by the Fred. T. Ley
Co., Mobile, Ala.
been reasonable to place one or two of these yards at the disposal
of the Concrete Ship Section so that one or two trial ships could
have been built and put through tests at a very early stage in
the programme, with decided benefits to the programme as a
whole in the way of indicating possible economies of time and
money. Had the Concrete Ship Programme not been kept
entirely as a thing apart from the Wood Ship Programme it is
possible that by the spring of 1919 a large fleet of seagoing
concrete ships would have been ready for service, instead of, as
was actually the case, the first ship being launched in December
76 SEAGOING AND OTHER CONCRETE SHIPS
1918 and completed in October 1919. The estimate of the
Concrete Ship Section was that, without interfering with the
programme of wood ship construction, about 560,000 deadweight
tons could be constructed by the end o"f 1918.
The Armistice brought the Government shipbuilding pro-
gramme to a sudden termination. Only ships whose construction
had reached a certain stage were completed ; the result was that
the Concrete Ship Programme was reduced to the following
twelve ships :
Name. Dimensions. Deadweight.
Tons.
Polias, cargo carrier . . 268' 0" X 46' 0" X 26' 6" 2,460
Atlantus „ . . 250' 0" X 43' 6" X 26' 9" 2,542
Cape Fear „ . . 268' 0" X 46' 0" X 28' 3" 3,078
Sapona „ .
Selma, oil-tanker . ' . 420' 0" X 54' 0" X 36' 0" 6,380
Latham „ .
Palo Alto „ .
Peralta „ .
Cuyamaca „
SanPasqual,,
Dinsmore „ .
With the exception of the Polias and Atlantus the ships
completed were all of the standard type. Most of the ships
were of the so-called 7,500-ton type. This type was designed
after the 3,500-ton type, it having been decided that the latter
type was too small ; the change in policy involved a delay in
the building programme. The cargo carriers were delivered
between October 1919 and January 1920, and the oil-tankers,
except the Moffit and Dinsmore, between May and September
1920.
The Polias was constructed by the Fougner Shipbuilding Co.
(incorporated by the author) of New York ; the order was given
by the Concrete Ship Section in February 1918, and was to be
followed by five more. The design was prepared by the Fougner
Co., but was revised in various details by the Shipping Board and
the structural design was subject to the requirements of Lloyd's
Register ; it was based on the design of the wood standard ship,
so that similar machinery, equipment, and fittings could be used.
SHIPS BUILT IN THE UNITED STATES 77
The superstructure and all decks were of concrete, and the whole
design was worked out more heavily in details than was originally
anticipated. There is no doubt that much steel and concrete
could have been saved in the frames, longitudinals, and super-
structure. The average thicknesses of the shell and deck slabs
were, respectively, 5" and 4|" ; these do not appear excessive for
a ship of the size, but would probably have been adequate in
association with a five feet frame-spacing instead of the four feet
spacing actually used. The side frames were 8" thick by 24"
average depth. The deck was carried by two continuous girders
forming the hatch coamings and supported by widely spaced
pillars of 9" diameter steel pipe filled with concrete.
The side slabs were reinforced with two layers of J" square
bars, arranged diagonally in both directions. The deck and
bottom slabs had a layer of f" square bars diagonally each way
in the middle, also the heavy longitudinal reinforcement, of 1"
square bars, near the upper and lower faces. The frames were
reinforced with 1J" square bars near the inner and outer faces
and the keelsons with 1J" square bars near the tops.
Had " light-weight " concrete, as described in Chapter IX,
been used about 400 tons of weight of concrete would have been
saved, and the deadweight carrying capacity correspondingly
increased. A further saving of weight could have been obtained
by making the keelsons and bottom frames of T section, instead
of rectangular section ; but this saving would have been achieved
at the expense of increased cost for centring. Engineering News-
Record, for 12th December 1918, contains considerable detailed
information on the structure of the Polias ; but the ship's name
is not given as she had not then been named.
The Polias was run on a reef off Rockport, Maine, early in
1920 and has been abandoned. Particulars of the damage to
the ship are given in Chapter VII.
The Cape Fear was sunk in a collision with S.S. City of Atlanta
in Narragansett Bay during October 1920 ; she lies in about
125 fathoms between Castle Hill and Rose Island.
Hence there remain, in all, not more than ten seagoing
concrete ships of the Shipping Board Programme ; there may,
in fact, only be eight ships, for there is no definite information
as to the completion of the Moffit and Dinsmore, both of which
had accidents during launching.
78 SEAGOING AND OTHER CONCRETE SHIPS
The Selma and Latham have been in the service of the
American Fuel Oil and Transportation Co., who informed the
author, in July and October 1920, that they have been fine steady
ships in rough weather, entirely oil-proof and watertight. Both
ships have grounded against the harbour jetty at Tampico, and
the owners estimate that the costs of the repairs were only half
what would have been incurred by steel ships.
The Atlantus was until recently chartered by the Clyde
Steamship Co., who found her entirely seaworthy, but rather
heavy ; she was not remunerative in the service where she was
engaged, due principally to the drop in freight rates and the high
operating expenses. She is now laid up, as are also the Sapona
and Peralta, together with hundreds of steel ships owned by the
Shipping Board.
The Palo Alto is believed to be chartered by the American
Fuel Oil and Transportation Co., and the Cuyamaca and San
Pasqual by the France and Canada Oil Transportation Co.
From the above brief record it is evident that very little
practical experience has been gained from these concrete ships ;
and it remains for the future to prove their merits. But the
author desires to point out that even experience of these ships
will not be by any means decisive for the future of concrete
ships. These ships constitute only a link in the chain of develop-
ment, nothing more. Had circumstances permitted their designers
and builders to revise and improve on subsequent ships, there is
no doubt that the subsequent ships would have been better ships,
both cheaper and lighter.
Further information on the U. S. Concrete Ships, also informa-
tion on the yards in which they were built, can be obtained in
the Proceedings of the American Concrete Institute for 1919. For
example, Mr. J. Glaettli, jun., has contributed " Problems in the
Design of Reinforced Concrete Ships " ; Mr. R. J. Wig has
written on " Methods of Construction of Concrete Ships " ;
and Mr. A. L. Bush, who succeeded Mr. Wig as head of the
Concrete Ship Section of the Shipping Board, has contributed
" Layout and Equipment of the Government Concrete Ship-
yards." These papers were, however, written before any of the
ships were completed, and estimates of carrying capacities, costs,
etc., given in them require modification to bring them into
accordance with actual facts.
BUILT IN THE UNITED STATES 70
Oil-tankers. — The first concrete oil-carriers ever constructed
were built in the spring of 1918 by the Fougner Concrete Ship-
building Co. for the Standard Oil Co., of New York. In all six
ships were built, comprising three harbour barges for carrying
oil in bulk in the hull compartments and in cases on deck, two
canal barges, one to carry oil in bulk and the other to carry asphalt
in cylindrical steel tanks, and a hulk for the storage of oil in
cases and in barrels. Investigations during the last few years
have shown that the common grades of fuel oils can be retained
safely in concrete vessels, without leakage or injury to the con-
crete ; but before carrying out the contract with the Standard
Oil Co. the Fougner Co. made numerous experiments in order
to confirm, and extend, the then available information on the
matter.
The first harbour barge, Socony 200, is 98' 0" by 31' 0" by
9' 6" and carries about 400 tons deadweight ; the general arrange-
ment is shown in Fig. 36.
Socony 200 is of similar type to the ordinary New York
Harbour deck scow. The hull is divided internally by four
transverse and three longitudinal bulkheads, all oiltight except
the centre longitudinal bulkhead, which is pierced by large
openings. Only the three central compartments are arranged
for the carriage of oil. The deck is of concrete, covered with
spruce flooring laid on nailing strips. Manholes are provided
for access to all compartments. Equipment for towing and for
handling cargo, the quarters for the crew, and the deck fittings,
etc., are the same as usually arranged by the Standard Oil Co.
on barges of the size and type. The sides of the barge are pro-
tected by three horizontal fenders, 6" by 8", of white oak ; between
these, at the ends and the most exposed places on the sides, are
fitted solid planking of pine, as can be seen on Fig. 37. The
pump-room is aft under the deckhouse.
The two other harbour barges are of the same type as Socony
200, but are each of 700 tons deadweight.
The canal barges Socony 201 and Socony 50 are 132' 0" by
12' 0" by 12' 4", and carry about 550 tons deadweight each.
The first was launched in November 1918 and the second in
January 1919. Both have the pump-room amidships and the
crew's quarters aft. Socony 201, which carries oil in bulk in the
hull, is divided by six transverse and one longitudinal bulkhead ;
'«#
_-TQ.—
o.
>
z
o
s
2
§
0)
O
+3
W)
1
1
TS
a
^
O
7
Z
2 B
o °
80
SHIPS BUILT IN THE UNITED STATES
81
access to the compartments is obtained through trunks on the
deck. Outside fenders are fitted as on Socony 200. The equip-
ment and pumping plant were supplied by the Standard Oil Co.
These barges have given satisfactory service ; but they have
been subject to minor damages through rough handling. There
is no kind of craft which receives harder usage than the New
York Harbour barge, which is constantly bumping against other
barges, and against tugs and wharves. The author is of the
FIG. ST.— Socony 200. The Launch, July 1918.
opinion that concrete is not at present suitable for such craft ;
but the great advantage of the fire-resisting property of concrete,
and the easy upkeep of the tanks, are points in favour of the use
of concrete for oil barges.
The oil storage hulk, whose general arrangement is shown in
Fig. 39, is 152' 9" by 35' 8" by 13' 3", and carries 1,200 tons of
oil in cases or barrels on deck in the concrete superstructure.
The hull is divided into watertight compartments by four
transverse bulkheads and one longitudinal bulkhead, with
additional subdivision in the ends. Two open longitudinal
6
82 SEAGOING AND OTHER CONCRETE SHIPS
bulkheads are fitted for structural reasons. The average thickness
of the sides, bottom, and deck is 3 inches. The walls and roof
of deckhouse are 2 J" thick ; a concrete fire wall, 4" thick, encloses
the deckhouse to a height of 27 inches. Above the fire wall are
fireproof sliding doors and windows. The fittings are all of the
Standard Oil Co.'s usual type. Fenders are fitted as on the
barges.
The oil storage hulk shown in Fig. 39 has been inspected by
a member of the Special Committee on Concrete Ships and Barges
FIG. 38. — Socony 201. 550 tons deadweight.
of the American Concrete Institute ; see report dated 21st January
1921. .It was found that the concrete was in excellent condition ;
some cracks were discernible, but there was practically no leakage,
and the barge appeared to be doing its work satisfactorily.
Oil Storage generally. — Until recently there was no great
demand for oil stations, for the good reason that ships burning
oil were few and far between. Before the war less than one per
C3nt. of the world's mercantile tonnage used oil fuel. The case
is different now. According to Lloyd's Register, in 1919-20
eighteen per cent, of the world's mercantile tonnage used oil
fuel, either under boilers or in internal combustion engines ;
tc
!c
z
Mp
5
5
£L
QL
/^°i
F\
POO
— '
— T— I" 1
1
O
1
j
o L !
-»- ^Q
r "
Q 2H
"
£
1 0
,__.
i
, z
£
O I
^ 3
...^_
— r—
b""!"
o
0
o
(1 *
u ±
— — L •!
\^_Vi
^
LLJ
D
z
O
•a
Z *'•
O "
h ^
.
0
84 SEAGOING AND OTHER CONCRETE SHIPS
in 1918-19 the percentage of tonnage using oil fuel was twelve.
Of the total tonnage classed in 1919-20, 47 per cent, was arranged
for the use of oil fuel.
In view of the development in the use of oil fuel it is obvious
that oil bunkering stations will be required in most ports ; and
owing to the great value of harbour frontage the cost of shore
stations with land tanks will generally be prohibitive. Hence,
the author firmly believes that within the next ten years hundreds
of floating oil stations of the type shown in Fig. 39 will be in
service. For this type of craft shipbuilding concrete is un-
questionably a better material of construction than any other
known to-day ; concrete shows up to advantage on the scores
of cheapness, durability, low upkeep expenses, and safety against
fire risks. For oil hulks the question of fire risk is of the utmost
importance ; it requires no great imagination to conceive what
would happen if hundreds of tons of flaming oil were to float about
in a harbour. Neither wood nor steel is fireproof, but concrete
is. And by storing bulk oil only in inside compartments additional
safety against the risk of burning oil escaping is obtained.
Craft of the type shown in Fig. 39 can be almost box-like in
exterior shape and, with intelligent supervision, can be constructed
by local labour anywhere in the world ; and they will generally
be built most cheaply at, or close to, the place where they are
to be stationed. Sand, gravel, and in most countries Portland
cement and some lumber, can be procured locally or shipped
only from a short distance. The steel will generally be the most
difficult element to obtain, but that amounts to only about a
fourth of the steel required to build a similar ship of steel.
Concrete oil containers on land may be somewhat outside
the scope of this work, but many features are closely related to
those of the floating oil-tankers. The author is aware that the
cylindrical steel tanks above ground frequently used by oil
companies may in certain localities be quite as cheap in first
cost as concrete, or even cheaper. But the matter does not
end there. Very often it is necessary to arrange the fuel oil
reservoir under ground. Concrete is then better suited to resist
hydrostatic or earth pressures, has greater weight against upward
pressure, is a better non-conductor of heat and cold, lightning
and electrolysis, does not rust, and is fireproof. Most of these
points are also in favour of concrete oil tanks above ground.
SHIPS BUILT IN THE UNITED STATES 85
In this connexion some interesting papers are published in
the Proceedings of the American Concrete Institute, vol. xv.
1919 : " The Design of Reinforced Concrete Fuel-Oil Reservoirs,"
by H. B. Andrews ; " Tests of Concrete Tanks for Oil Storage,"
by J. C. Pearson and G. A. Smith ; " The Fire Hazard of Fuel
Oil," by J. W. Lord.
CHAPTER VII
DAMAGES AND REPAIRS
M.S. Askelad — M.S. Nicanor— M.S. Stier—S.S. Polios.
M.S. Askelad. — At 7 a.m. on 16th January 1919 the Askelad
left Havre for the North and, following instructions from the
French naval authorities, steered a course close to the shore at
low speed. There was a strong wind, with a heavy sea. Full
speed ahead was ordered at midday, and during the afternoon
Fecamp, P. Valery, St. Valery, Pt. d'Ailley, P. Treports Pirere,
and Cayeux were passed. At 9.15 p.m., in a strong wind with
rain and a heavy sea, the ship struck a sandbank in the estuary
of the River Somme, about midway between Cayeux and Pte. de
St. Quentin ; the place where the ship struck is marked " A "
in Fig. 40. The helm was put hard over in an attempt to get
the ship out to sea ; but the ship was driven inshore, coming
to rest eventually in the position marked " B " in Fig. 40, about
four miles from " A." While being driven ashore the ship
bumped violently at every heave of the sea, and this continued
after she was brought up on the beach. The shocks were so
severe that footing could not be kept on the bridge. Heavy seas
swept the ship, and the starboard lifeboat and the dinghy were
carried away. After a time the shocks became less violent and
by about 11 p.m. they had died away. Shortly after it was
found that the ship was practically high and dry at the bow,
and a member of the crew who had been sent out to investigate
reported that it was possible to get to land in about half an hour,
and that it was necessary to wade waist-deep in only a few places
on the way. The crew, therefore, took the opportunity of getting
ashore with their belongings, also some food and water, as they
were afraid that the ship would break up at the next high tide.
In a report to the owners, dated 18th January, the Captain
stated that the ship was still bumping violently at high tide,
86
DAMAGES AND REPAIRS
87
though the weather had moderated a bit ; in his report was the
remark " Strange to say, the ship is quite tight." During the
'•a
II
31
i
.
O oj
^ I
l-s
o t
0
day of the 17th the Captain had made arrangements for a tug
to come from St. Valery when the weather moderated ; and on
the forenoon of the 18th an attempt was duly made to get the
ship off, tug and ship's engines working together. But the
88 SEAGOING AND OTHER CONCRETE SHIPS
attempt was unsuccessful. The tides were falling and the
Captain was of the opinion that there was no use in making any
further attempt at refloating before the beginning of February,
. . . "if the ship holds together." " Should another gale spring
up there is every probability that the ship will break to pieces,
although she seems to be strong as a rock." (The passages
quoted are from the Captain's report dated 18th January.)
The attempt at refloating made on the 18th January was a
failure in part through the main engines stopping as the result of
the cooling water-pipes becoming choked with sand. In order to
get over this trouble and ensure that the engines would be available
when needed the ship's engineers arranged a temporary circulating
system, taking supplies from the sanitary tank on the bridge to
the engines, and using the fore-peak tank as a storage tank from
which the sanitary tank was filled ; by this means it was possible
to keep the engines going for a spell at each high tide.
While waiting for the spring tides at the beginning of February
the ship was shifted as far as possible every high tide. As
preparation for the ensuing high tide advantage was taken of
low tide to dig a trench in the sand astern of the ship, and also
to shift the kedge and stern anchors a further stage out to sea.
Then at each high tide the ship was taken a short distance
seawards, the efforts of the main engines being backed by the
deck machinery pulling on wires attached to the anchors out
astern.
Towards the end of January the Captain was enabled to
make an aeroplane survey of the channels in the sands,
by courtesy of the commanding officer of the aerodrome at
St. Valery ; and then on the night of 1st February the ship was
floated off after working the main engines and pulling on the
anchors for about an hour. The ship was then taken out to
deep water by way of the channels surveyed by the Captain,
and anchored to await the morning.
On 6th February the Askelad left St. Valery for London,
arriving there four days later. Owing to a strike there was a
difficulty in obtaining dry dock accommodation, but a survey
with the ship afloat was carried out by representatives of the
Norwegian Veritas, of the underwriters, and of the engine-builders.
The underwriters' surveyor reported the presence of various
cracks in the concrete. There were cracks in the centre keelson
DAMAGES AND REPAIRS
89
in nearly every frame space in the holds ; in most of the bottom
frames in the holds near the centre-line ; and also in a few of
the bottom frames near the bilges. But these cracks seemed to
be only in the surface. As regards the deck, there were cracks
in the raised portion between the hatches, and in the portion
between No. 2 hatch and the fore end of the deckhouse ; these
cracks all radiated from the hatch coamings at the centre-line
of the ship, and were probably due to the hold pillars underneath
FIG. 41. — M.S. Askelad aground.
being forced up by the keelson when the ship was bumping over
the sandbanks. Such an explanation is consistent with the
presence of cracks in the keelson and floors. There was no
indication of damage to the two forward bulkheads, but there
were slight cracks in the bulkhead between the engine-room and
No. 2 hold. There was a very small quantity of water in the
bottom of the ship ; but the pumps had not been in use since the
ship left St. Valery. This water was, however, completely bailed
out and the bottom carefully examined ; only a few cracks were
found, and these were in the bottom frames, low down. But
90 SEAGOING AND OTHER CONCRETE SHIPS
from the presence of the water it was inferred that there was a
crack through the bottom, though it was obviously of little
importance. In the report from which this information was
extracted the underwriters' surveyor expressed the opinion that
the ship was sufficiently seaworthy to go to Grimsby, but that
she should be dry- docked there for examination of the bottom
and of the propeller shafts.
The Askelad accordingly left the Thames on 7th March, and
arrived at Grimsby on the 10th, where she was dry- docked two
days later. It was found that some cement finish had been
rubbed off and that there was a slight leak in No. 2 hold. A
few patches of cement plaster were applied by the crew, but no
other work was done on the concrete hull. There was a certain
amount of work done to the machinery, the principal item being
the renewal of the starboard propeller on account of the loss of
a blade during the grounding or the refloating ; but no work was
called for as the result of any defect in the concrete hull.
After the survey at Grimsby the Askelad was immediately
put into service and was not again dry-docked until September,
when she was surveyed at Moss as required by the Norwegian
Department of Shipping in terms of the yearly certificate of
seaworthiness. Following on this survey minor repairs were
carried out on the deck fittings, and the cement finish on the deck
was repaired in a few places. The total bill for the work done
at this time amounted to kr. 1879-31 (about £100) ; of this
amount the cost of the cement used was about two pounds, by
far the major portion being due to alteration to deck fittings.
It can safely be said that the total cost of repairing the concrete
hull after the grounding on the French coast did not exceed twenty- five
pounds.
Captain, officers, and crew deserve great credit for the work
done in salving the ship. In recognition of this work the under-
writers presented gold watches and chains to captain and chief
engineer.
The grounding of the Garry Owen, referred to in Chapter I,
did much to establish the reputation of the iron ship ; the
grounding of the Askelad has equally established the reputation
of the concrete ship.
M.S. "Nicanor." — This ship was built by the author's firm,
and is of practically the same dimensions and type as the Namsen-
DAMAGES AND REPAIRS 91
fjord. During the night of llth April 1919 she ran on a sub-
merged rock near South Torgersogap, when on a passage to
Christiania ; subsequently the strong current in the channel
carried her over on to another rock which held her abaft amid-
ships. After vainly trying to get the ship off by her own power
a call was sent out for a salvage boat, and one arrived during the
following day. The salvage boat put a hawser on to the bows
of the Nicanor, which were nearly under water, intending to
pull alongside by means of her winch ; but the pull on the hawser,
instead of bringing the salvage boat alongside, slewed round the
bows of the Nicanor, causing her to slide slowly off the rock
and dive to the bottom of the channel, where she rested almost
on end in six fathoms of water. A month later the Nicanor
was salved and taken to a steel ship builder for repairs.
A survey of the damage showed that there were ten holes
in the concrete hull, some cement finish rubbed off, both bilge
keels damaged, and the wood fender on the stern damaged.
There was damage to machinery and accommodation as the
result of immersion, and damage also to deck fittings and gear.
The costs of the repairs, as assessed by Magistrate for insurance
claim purposes, were :
£
Repairs of bottom and stem .... 250
,, deckhouse, crew's quarters, painting,
etc 175
,, rails, boat davits, boat deck . . 75
,, engines . . . . . . 250
,, rigging, hatches, etc. .^ . .50
Equipment lost or destroyed .... 200
Dock dues 150
Total . .1,150
The ship in her damaged condition was valued at £2,800.
Repairs were very expensive in 1919, but even so the concrete
hull could easily have been repaired for £100 to £150, instead of
£250 as given above. To the £100 or £150 there must be added, of
course, the dry dock dues ; but these would not amount to
£150, as given above, on account of repairs to concrete, for in
the particular case the time in dry dock was determined by the
other repairs, the concrete work only taking a week.
92 SEAGOING AND OTHER CONCRETE SHIPS
M.S. " Stier." — During a dense fog on the evening of 17th
December 1918, when bound for Christiania, the Stier touched
bottom in the Christianiafjord, but she slid over the obstruction
and continued on her way ; the holds were sounded and found
to be dry. Shortly afterwards the ship struck hard against a
small reef, but again she slid off ; this time, though, there was
leakage, for the fore peak was found to be flooded. Both holds
were again sounded and found to be dry, the collision bulkhead
holding good ; and the ship was able to make port under her
own power.
The Stier was not repaired until several weeks had elapsed,
and she made the passage round to Moss for repairs in her
damaged condition. The work was carried out by a steel ship
building firm, and the costs as assessed by Magistrate for insurance
claim purposes were :
£
Repairs to bow ...... 325
Repairs to keel aft ..... 1
Removing interior ceiling for inspection . . 60
Overhauling winches, etc. .... 65
Dock dues 209
Total . . £660
The damage to the concrete hull could in this case also have
been made good for a much smaller figure than given above ;
in fact, the author's firm would gladly have done the work for
£175, but for personal reasons the owner wanted the steel builder
to do the work. And as the steel ship builder had no experience
of concrete, and got no assistance from the classification society,
since the Stier is not classed, the repairs were not carried out so
fast or so cheaply as might have been.
S.S. "Polias." — This ship, while southward bound to Norfolk
in light trim, was run on to the CiJley Ledge, off the coast of
Maine, on 6th February 1920. At the time of the grounding
the ship was running at full speed, making probably 9J to 10
knots. Eleven of the crew put off in one of the boats against
the captain's orders ; they have not been heard of since, nor
has any trace been found of their boat. The remainder of the
crew, about thirty men, stayed by the ship overnight and were
taken off by coastguards.
FIG. 42. — M.S. Stier in dry dock after grounding.
93
94 SEAGOING AND OTHER CONCRETE SHIPS
A few weeks after the accident an inspection was made by
a representative from the U.S. Shipping Board, a few days of
calm weather having allowed a diver to make a careful examina-
tion of the underwater damage. The ship was found to be
lying on a shelving rock, with the stern in about 1 1 feet of water,
and the bow nearly submerged, at low tide. In grounding the
ship had evidently passed between two jagged rocks, for the
sides were ripped open practically from end to end, the depths
of the openings varying from about two feet to about seven feet.
HHHHHHE
FIG. 43. — S.S. Polias aground on Cilley Ledge.
But the damage was found to be confined almost entirely to
the shell, although in a few places small pieces had been torn
out of the frames. A careful examination of the above water
portion of the ship failed to discover structural damage ; the
ship had evidently not deflected, as there were no cracks dis-
cernible in the deck. Further information on the report of the
Shipping Board representative, Mr. Lewis R. Ferguson, can be
obtained in Engineering News-Record for 4th March 1920.
In the latter part of April 1920, Mr. Ferguson received a
letter from the officer in charge of the coastguard near the Cilley
Ledge ; in the letter was the following interesting statement :
DAMAGES AND REPAIRS 95
" Yes, the old steamer still lies in the same position, and
tho' severe storms have washed over and around her since you
were here she remains the same ; no apparent change has been
noticed, and with the exception of the paint washing off I do
not believe the hull has been damaged in the least.
" I am still of the opinion that the concrete boat is, if kept
off the rocks, the strongest built ship afloat, as no steel or wood
ship would have stood the severe storms that have beaten
against the Polias during the past two months with such little
damage being done."
The above statement should provide plenty of food for thought
for those who will contemplate the probable fate of a steel ship
of even the best construction after running on to these rocks
at a speed of ten knots.
Owing to the depression in shipping the Polias has not been
salved. She will probably remain for many years in her exposed
position, bearing testimony to the strength and durability of
the seagoing concrete ship.
Striking confirmation of the remarks in the previous para-
graph comes to hand at the moment of going to press in tho
following paragraph (reprinted from The Times Trade Supplement
(Engineering Section, p. 173) of 22nd July 1922), which it has
been ascertained refers to the Polias :
A WRECKED CONCRETE SHIP
In February 1920 a concrete steamship, 250 feet long, struck a sub-
merged reef of rock off Port Clyde, U.S.A. Inspection of the vessel in
the following July is said to have revealed no damage except a hole in
the bottom, the concrete hull, decks, and bulwarks being in perfect
condition in spite of the heavy seas to which they had been subjected.
A second inspection in August 1921 disclosed little change in the state
of the vessel. Some of the timber upper works had been washed away,
but the hull appeared as solid as the rock on which it rested. According
to recent reports the hull is still intact after exposure to the sea for over
twenty-eight months. The chief of the salvage crew is reported to have
stated that a steel or timber vessel would not have survived for more
than three months in the same situation. The test is one showing very
clearly the high resistance of reinforced concrete to exceptionally severe
shocks and stresses.
CHAPTER VIII
COMPARISONS OF CONCRETE SHIPS WITH STEEL
SHIPS
First Cost — Units of Material and Labour per Ton — Examples of Costs —
Speed — Strength — Running Expenses — The Future of the Concrete Ship.
First Cost. — It is very difficult to present reliable and useful
information on first cost. Current market prices do not give
any guidance, since, as is well known, during the present depres-
sion in shipping ships change hands at prices far below the first
costs. The majority of shipbuilders do not care to publish their
cost data ; or, if they do publish any of it, they do so in such
a form that it does not give a true idea of the cost of production.
Further, the war-time inflation of wage rates and costs of materials
introduces a disturbing element. Accordingly, the figures used
in the comparison below can be taken as only approximately
correct. But they are based on actual costs of completed
ships ; the concrete ships were built by the author's firm, the
steel ships by a firm on the west coast of Norway. Only hulls
are taken into account in the comparison, since engines and
equipment are practically the same whether the hull be of concrete
or steel.
Concrete, Ships
Units ol Material and Labour per Ton. — The materials used
are : Concrete of mixture 1 : 1-85 : 0-65 ; steel reinforcement of
mild, medium grade, round rods, and second quality pine or
spruce boards for centring :
One ton (2,240 Ib.) of concrete in the finished hull afloat requires :
f 1-9 barrels of Portland cement (at 3-8 cub. ft.).
Concrete-^ 14 cub. ft. of sand.
{ 5 cub. ft. of gravel.
10 cub. ft. wood for centring.
96
CONCRETE AND STEEL SHIPS COMPARED 97
24 hours of carpenter work on centring.
, 14 concreting.
Labour 5 .
10 ?> plastering nnish.
,, erecting scaffolding and launching.
100 per cent, of cost of labour should be added for
supervision and all other charges.
One ton (2,240 Ib.) of steel reinforcement in the finished hull
afloat requires :
2,240 Ib. of steel delivered in the yard.
116 hours of bending, cutting, and placing.
100 per cent, of actual cost of labour for charges.
Notes. — Wood materials for the centring are assumed to be
used three times.
Average wages for masons and helpers should be figured for
plastering the cement finish. One cubic yard of concrete weighs
1-7 tons.
The cost of a concrete hull is found by adding the weights of
concrete and steel multiplied by their respective unit prices. It
is best to calculate separately the weight and cost of equipment.
The estimate can be summarized as follows :
Weight. Cost.
Concrete .....
Reinforcement ....
Engines and equipment
Deadweight ....
Displacement loaded in tons (at 2,240 Ib.) :
Steel Ships
The material used is steel of ordinary shipbuilding quality.
One ton (2,240 Ib.) steel in the finished hull afloat requires :
2,240 Ib. of steel delivered in the yard.
104 hours of shaping, erection, and riveting.
100 per cent, of actual cost of labour for charges.
Notes. — The number of working hours per ton is an average
of actual figures from seven ships, varying in sizes from 1,600
tons to 8,000 tons deadweight built between 1900 and 1919.
The 100 per cent, addition to the actual cost of labour, for
7
98 SEAGOING AND OTHER CONCRETE SHIPS
supervision (including foremen), overhead charges, tools, etc., is
also an average figure, which may vary considerably. Sometimes
this item is covered by adding a much lower percentage, namely
between 30 and 50 per cent., to the cost of labour plus materials ;
and this in the end gives practically the same figure.
The deadweight capacity is known, and it is useful to express
the weight of hull in terms of the deadweight. For concrete
ships the concrete and reinforcement should be figured separately.
In the preceding chapters it has been shown that the majority
of concrete ships have been constructed far too heavily. The
Askelad and Faith have practically the same ratio of weight of
hull to deadweight ; but since the exact quantities of steel and
concrete are known only for the Askelad, data from her con-
struction are used in the present calculations.
Concrete Ships
For Askelad : 1,076 tons deadweight and 628-0 tons con-
crete give 0-583 ton (0-343 cub. yd.) concrete per ton deadweight ;
1,076 tons deadweight and 105-0 tons reinforcement give 0-0976
ton reinforcement per ton deadweight.
Steel Ships
The average gross weight of steel required in constructing the
hulls of seven ships, varying in size from 1,600 to 8,000 tons
deadweight, was found to be 36-5 per cent, of the deadweight.
On account of waste in cutting plates, punching rivet-holes, etc.,
this amount is reduced by about one-tenth in the finished hulls ;
but the gross quantity of steel should naturally be used as a
oasis in determining the cost of production. Therefore :
0-365 ton of steel is required per ton deadweight.
Examples of Costs. — From the above data the costs of con-
structing hulls of concrete and steel can be readily estimated
for any prices of labour and materials. In Chapters II, III, and
IV are given the actual costs of some concrete ships, but these
are of no permanent interest ; neither are war-time prices of
steel ships. Comparisons of practical value can only be made
when and where it is desired to build either concrete or steel
ships, and the costs must be based on the local prices of labour
COMPARATIVE EXAMPLES OF COSTS 99
and materials. It is of course impossible to say what these
may be five or ten years hence, when shipbuilding perhaps again
becomes normal after the present depression, but the following
figures are assumed in order to give an example :
It is desired to build a cargo carrier of ordinary type, either of
concrete or steel. Deadweight capacity to be 2,000 tons.
Unit prices of materials and labour :
£ s. d.
Portland Cement, per barrel . . . 0 10 0
Sand and Gravel, per cub. ft. . . . 004
Second quality Pine and Spruce, per cub. ft. 020
Steel Reinforcing Rods per ton (2,240 Ib.) . 15 0 0
Steel Plates, Angles, etc., per ton (2,240 Ib.) 1600
Average wages for skilled tradesmen and their helpers :
£ s. d.
Carpenters per hour . . . . .016
Concrete workers per hour . . .013
Brick- masons (Plasterers) per hour . .020
General labour per hour . . . .010
Steel shipbuilders per hour . . .019
Concrete Hull
£ s. d.
Portland Cement, 1-9 barrels @ 10/- . . 0 19 0
Sand and Gravel, 19 cub. ft. @ 41 . . 064
Second quality lumber, 10 cub. ft. @ 2/- . 100
Carpenter work, 24 hours @ 1/6 . . 1 16 0
Concreting, 14 hours @ 1/3 . . . 0 17 6
Plastering, 10 hours @ 2/- . . .100
Scaffolding and launching, 18 hours @ I/- . 0 18 0
100 per cent, of cost of labour charges , 4116
One ton of Concrete . . .£1184
£ s. d.
Steel reinforcement, 1 ton @£15 . . 1500
Placing, bending, etc., 116' hours @ I/- . 5 16 0
100 per cent, of cost of labour for charges . 5 16 0
One ton of Steel Reinforcement , £26 12 0
100 SEAGOING AND OTHER CONCRETE SHIPS
£ s. cl
0-583 ton of Concrete @ £11 8s. 4d. . . 6 13 1
0-0976 ton of Steel Reinforcement @ £26 12s. 2 12 0
Cost per ton deadweight . .£951
2,000 tons deadweight @ £9 5s. Id., £18,508 6s. Sd.
Steel Hull
£ s. d.
Steel plates, angles, etc., 1 ton @ £16 . . 1600
Shaping, riveting, erection, etc., 104 hours
@ 1/9 . 920
100 per cent, of cost of labour for charges . 920
One ton of Shipbuilding Steel , . £34 4 0
0-365 ton Steel @ £34 4s £12 10 0
Cost per ton deadweight . . £12 10 0
2,000 tons deadweight @ £12 10s., £25,000.
From the above it is seen that, with the assumed prices of
materials and labour, the steel hull costs : £25,000-£18,508 =
£6,492 more than the concrete hull.
In other words : The hull of a steel ship is 35 per cent, more
expensive in first cost than that of a concrete ship of the same type
and deadweight capacity.
Speed. — Several elements combine to form the total resistance
of a ship to motion through water ; but by far the most important
element in the case of ordinary cargo carriers is the skin resistance,
which amounts to nearly 80 per cent, of the total resistance in
the case of a steel ship. Skin resistance is due to the friction of
the water against the sides and bottom. Obviously the smoother
the immersed surface the less the resistance. On steel ships the
projecting plate edges and rivet-heads contribute appreciably
to the skin resistance ; Mr. G. S. Baker has shown in a paper to
the North- East Coast Institution of Engineers and Shipbuilders
in 1915 that as compared with a smooth hull the additional
resistance due to plate edges and rivet- heads amounts to about
10 per cent. Accordingly, due to her smooth surface, a concrete
ship may be expected to show appreciably less resistance than
a steel ship of the same dimensions and form. And it is with
CONDITIONS AFFECTING SPEED 101
this, as well as watertightness, in mind that the author recom-
mends the application of a cement mortar finish to the outer
surfaces of the hulls of concrete ships ; with careful trowelling
the finished surfaces are very smooth and dense.
How far vibration, rolling, and pitching affect the speed of a
ship can probably not be accurately ascertained, except through
actual trials of full-size sister ships built of different materials.
But it is a fact, proved beyond doubt, that concrete ships have
easier movements and much smaller vibrations than similar
steel ships. In the author's opinion these advantages, which
are due to the greater stiffness and heavier sides of the hull,
account to a considerable extent for the good speeds generally
obtained by concrete ships.
Not long ago the author had an excellent opportunity of
observing the movements in the hull of a steel ship. It was in
the North Atlantic in November during a raging gale. The ship
was a large passenger steamer about six hundred feet long, and
practically empty as regards cargo — 600 tons of matches was all
she carried — but the bottom ballast tanks were filled. The
" panting " of this ship was most remarkable, especially when
she was hit a hard blow in the fore- part of her bottom, while
riding on the crest of another wave. And it seems logical that
excessive resistance must be caused by such an undulating
surface passing through water ; for instance, a pliable spear
vibrating through the air will not travel as far as one that is more
rigid. It should also be remembered that the vibration is two-
fold in steel ships driven by engines ; as well as the temporary
deflections of the hull from external forces of the waves, there
is a perpetual vibration due to the engines.
That considerable deflections do take place in steel ships is
amply proved by shorn-off rivets, and in many other ways. It
is equally certain that they do not affect the concrete ship to any
appreciable extent, otherwise cracks would at once appear in
the surface of bottom and sides, even from deflections of fractions
of an inch. No such cracks have been seen on any of the concrete
ships built by the writer, which have now been in use for nearly
four years.
Concrete ships are, however, in the matter of speed subject
to one disadvantage, namely, increased displacement for given
deadweight. The increased displacement involves increased
102 SEAGOING AND OTHER CONCRETE SHIPS
wetted surface, resulting in increased skin resistance. But this
disadvantage will be diminished as the weights of concrete hulls
are reduced.
Strength. — In preceding chapters it has been shown that
concrete ships have been built having sufficient strength for
normal service, and even, as in the case of the Askelad, sufficient
strength for abnormal service.
Running Expenses. — The principal elements which combine
to make up the total running expenses are : Interest on capital
invested ; Depreciation ; Insurance ; Bunkers and Stores ;
Crew's Wages and Provisions ; Handling of Cargo; Brokers'
Fees ; Harbour and Dock Dues ; Upkeep and Repairs. It is
the sum of these charges on revenue and items of expenditure
which is of prime importance to the shipowner.
Several items of running expenses are the same for concrete
ships as for steel ships of the same deadweight, namely, Bunkers,
Stores, Crew's Wages, Provisions, Handling of Cargo, and
Brokers' Fees. Harbour Dues are slightly larger for concrete
ships, since they are based on register tonnage, which is larger
for concrete ships than for steel ships of the same deadweight
on account of increased dimensions. The charge made on
revenue to cover Interest on Capital invested is less for a concrete
ship than for a steel ship of the same deadweight ; this item, of
course, depends entirely on first cost, or purchase price, and so
the reduced cost of construction of the concrete ship involves
an appreciable saving in running expenses.
The cost of Insurance ought to be rather less for concrete
ships, but, in fact, underwriters have, up till now, demanded
higher rates than for steel ships. The result is that some Nor-
wegian owners of concrete ships have discontinued insurance,
except for complete loss, as they have found it unnecessary to pay
exorbitant premiums to cover costs of repairs which often are
carried out by the crew in a few hours.
The greatest savings in the running expenses of concrete
ships are accomplished on the scores of Depreciation, Upkeep, and
Repairs. After four years of service there are no signs of attack
from sea-water, rust spots on the unpainted concrete surfaces,
nor other signs of depreciation on the ships built by the author's
firm. A barge with pile driver, now belonging to the Moss
Harbour Authorities, was docked for inspection on 20th June
RUNNING EXPENSES COMPARED 103
1921, after having been continuously in sea- water for four years
and four days. The surface, when cleaned of seaweeds, was
just as smooth and solid as it was four years ago. In no place
was the finish rubbed off or loose. The docking, cleaning, and
coating of the barge — which up to then had received no painting
—with coal tar was done at the trifling cost of about £9. This
little ship furnished proof of an interesting fact, namely, that
outside cement finish can be applied a considerable time after
the concrete has hardened, and yet will adhere perfectly. The
hull was concreted on 23rd April 1917 and the following few
days. The sides were plastered with cement finish between 4th
and 9th May, and the under side of bottom between 15th and
19th May 1917.
The matter of repairs has been treated at some length in
Chapter VII.
Actual figures for comparing the running expenses of concrete
and steel ships under exactly the same conditions have not so
far been available. One reason for this is the annual survey
demanded by the classification societies or by the Director of
Shipping. Another reason is the already mentioned attitude of
the underwriters, who unnecessarily increase the insurance
premiums. The principal concrete shipowner in Norway, Mr.
Thygo Sorensen, of Christiania, expressed his opinion to the
author substantially as follows :
" There is no doubt that concrete ships are cheaper to run,
out up to the present considerable extra expense has been
incurred by the annual survey (for steel ships only every four
years), and by the fact that even the inner ceiling must be
removed for inspection. Outside inspection of the hull ought
to be sufficient, as long as it seems to be perfectly sound."
This is a reasonable attitude, and it will probably be only a
matter of time before concrete ships are surveyed no more fre-
quently than steel ships. Many cases of minor damage have
occurred, where the concrete surface has suffered abrasion from
collisions with docks, etc., but as regards seagoing ships such
damage could nearly always have been avoided with more care.
In a letter to the designers, Messrs. Leopold Walford, Ltd.,
London, express their opinion on the upkeep expenses of the
S.S. Armistice (see Chapter XIII), estimating these to average
about one-fifth of those for a steel ship working under the same
104 SEAGOING AND OTHER CONCRETE SHIPS
conditions. They base their views on figures noted for three
typical steel ships, which respectively compare to the Armistice
as 2 J to 1, 3 to 1, and 10 to 1. Their experience covers 1 J years
of service.
The Future of the Concrete Ship. — There are no technical
difficulties to prevent the building of concrete ships of much
greater size than have already been built. The author believes,
however, that with the present materials of construction the
future of the concrete ship lies in sizes from about 2,000 tons to
6,000 tons deadweight. For short voyages between harbours of
limited depth the smaller sizes are required, and for oversea
cargo service the larger sizes should probably be economical.
The construction of concrete ships of larger sizes than 6,000 tons
requires relatively more steel reinforcement in the hull and more
equipment in the builder's yard, as the centring is heavier to
handle ; it is doubtful whether the cost per ton deadweight
would be lower.
When a really satisfactory light-weight concrete is invented,
with better elastic properties than at present, it will involve a
great improvement and radically change the interior details of
the hull. All frames will probably be eliminated ; in other
words, the steel reinforcement will be embedded in a thick slab,
where it will act as frames spaced very close together, and so
will be very effective. The weight of reinforcement will be
reduced for three reasons :
On account of the thick concrete sides absorbing more of the
shearing strains, without the aid of reinforcement.
Because the steel near the inner and outer faces can be better
utilized in a thick slab, having greater " effective depth."
Because with a concrete able to stretch slightly more than
the present material, high carbon steel of much greater strength
can be employed as reinforcement to full advantage. Such
steel cannot be used in the construction of steel ships, where
the material is exposed to twisting and bending as well as tension
and compression ; but as reinforcement it can be used safely.
The exterior form of the ship should be maintained exactly
as desired by the naval architect, but the elimination of interior
frames would improve facilities for loading cargo. The cubic
capacity for " bale " goods would be increased considerably
because the massive slab would not be nearly as deep as the
FUTURE OF THE CONCRETE SHIP 105
present frames, and the saving on inside centring and work in
placing the reinforcement is obvious. Such construction of sides
would permit greater deflections, so reducing greatly the risk of
injury from local blows, and the thickness would prevent minor
damage from penetrating.
The author firmly believes that this improvement in concrete
will come, and that it will play a very important part in the ship-
building of the future. He does not dream of a concrete with an
elasticity of steel or wood, nor does he expect the material to
possess great tensile strength — the steel reinforcement supplies
that ; but he does believe that a concrete will be developed
which will stretch rather more than the present material. The
new concrete will stretch sufficiently to prevent cracks forming
around a reinforcement of high carbon steel worked to perhaps
thirty per cent, higher tensile stress than is used now. The
author anticipates also that this concrete will be between one-
half and two-thirds of the weight of the present material. In
conclusion the author may sum up his views as follows :
" With the present materials, seagoing concrete ships have
been built cheaper than steel ships. They are seaworthy and
strong, with low upkeep expenses and no higher fuel consumption
than steel ships of the same deadweight. On account of their
larger cubic capacity and better insulating qualities against
temperature changes, they are especially suited for cargoes like
lumber, coke, ice, fruit, etc."
Up to now seagoing concrete ships — or rather the builders
of such ships — have hardly had a fair chance to develop the
new construction, on account of war conditions and the following
depression with over-production of steel and wood tonnage.
It is not true that the seagoing concrete ship was a " war- pro-
duct " or poor substitute doomed to sink into oblivion. It
would have arrived regardless of the war, and shows even in
its present crude state of development some advantages over
steel ships, and a decided superiority over seagoing, engine-
driven, ships of wood. Some years from now, when the excess
of war-tonnage has been absorbed and when demand for tonnage
begins to overtake the supply, the next chapter of concrete ship-
building will commence. It will call for special reinforcement
for concrete ships, manufactured to save field work, a lighter
concrete, greater refinements of construction, especially of the
106 SEAGOING AND OTHER CONCRETE SHIPS
centring and placing of the concrete. The classification societies
will have collected experience from the concrete ships in use,
and will no doubt be less exacting in their demands ; and the
result will be a type of ship built with one-third the amount of
steel used in a steel ship, and that material thoroughly and
permanently protected against corrosion.
CHAPTER IX
SHIPBUILDING CONCRETE
Introductory — Portland Cement — Water — Aggregate — Impurities in Aggre-
gate— Sand — Light-weight Aggregate — Proportions of Mixture — Mixing —
Placing and Curing — Steam Curing — Freezing — Vibration, Pressure, etc. —
Compressive Strength — Shear Strength — Bond Strength — Elasticity — Water-
tightness — Contraction and Expansion — Trass Concrete — Action of Sea-water
— Action of Oils, etc. — Repairs — Fire-resisting Power.
Introductory. — Concrete is probably the most commonly used
material in modern constructional work. Not only are founda-
tions and underground work almost exclusively built of this
material, but superstructures such as buildings, bridges, dock
walls, etc., are built of it to an extent that could not have been
conceived fifty years ago. This vast development was made
possible by two inventions — the manufacture of artificial Portland
cement, and the reinforcing of concrete by steel.
The concrete of former days did not possess the strength or
reliability of the present reinforced material, and could not be
used to build an ordinary flat roof or floor. It was employed
only as a mortar or for vault and arch construction like stone or
brick work. The difference between the poorest grade of iron
known to our ancestors and the shipbuilding steel of to-day is
no greater than that between the concrete of fifty years ago and
that used for the building of concrete ships. But there is still
ample room for improvement in concrete whether for land or
ship work.
Concrete for land work and concrete for ship work differ
materially. Concrete for land work should be :
of strength and mixture as specified or as required by
local building regulations.
composed of durable, clean materials,
as cheap as possible, while of the specified quality.
107
108 SEAGOING AND OTHER CONCRETE SHIPS
Concrete for ship work should be :
of maximum strength and elasticity,
of maximum water tightness.
of minimum weight, subject to the strength being
sufficient.
In this case the cost is of minor importance.
The fact that the cost is of minor importance in concrete
for ship work may seem to be surprising. But it is explained by
the other fact that the total cost of all the concrete materials in
the hull of a seagoing concrete ship amounts only to about five
per cent, of the total cost of the ship complete ; of this five
per cent, the Portland cement makes up about three per cent.
and the aggregate about two per cent. For lighters, in which
there is no machinery and little deck equipment and fittings,
the cost of the concrete materials amounts to about 10 per cent,
of the total.
Concrete consists of the following materials :
Portland cement.
Water.
Fine aggregate (sand).
Coarse aggregate (gravel or broken stone).
Of these elements the cement and water are active, and the
others inactive. It is obvious that the cement is of great influence
in determining the quality of concrete ; but it is only recently
that investigations have shown that the amount of water is also
a matter of vital importance.
Portland Cement. — It is known from structures still in exist-
ence that various kinds of cement were used even in ancient
times. The cements used were, however, different from the
Portland cement used to-day ; they were entirely of natural
origin, whereas the present-day article is a factory product.
Natural cements are still available, but they are rarely used
since they are of erratic quality and are inferior in strength to
the manufactured article.
Early in the nineteenth century the Frenchman Vicat tried
to produce an hydraulic cement by burning a mixture of limestone
and clay at a high temperature, but without satisfactory results.
At about the same time the Englishman Joseph Aspdin worked
SHIPBUILDING CONCRETE 109
on the same lines and finally succeeded. Aspdin took out
patents on his method, and called the product Portland Cement
because in colour and hardness it resembled the building stone
obtained from Portland. Owing to lack of chemical knowledge
the early material was uncertain in quality and so was not much
used. The accidental discovery that waste products from the
burning when ground to a fine powder made a better cement
was the foundation of the present methods of manufacture.
And practical experience, together with extensive chemical
investigation, has made Portland Cement a reliable material of
exact chemical proportions whose properties need never be
doubted if it is obtained from a reputable manufacturer.
Portland Cement is a finely pulverized mixture of burnt clay
and limestone, having approximately the following analysis :
Silica. Alumina. Iron Oxide. Calcium Oxide. Magnesia.
Si02 A1203 Fe203 CaO MgO
19-25% 5-9% 2-4% 60-64% 1-2-5%
The raw materials are obtained from many sources, but they
are always proportioned in such a manner that the chemical
analysis of the finished product agrees closely with the figures
above.
The development in the use of Portland Cement can be
roughly appreciated from figures of production. In the United
States the annual production was 990,000 barrels in 1895, and
about 94 million barrels in 1917, practically a hundredfold
increase in 22 years. In Germany 29 factories produced in
1877 2,200,000 barrels ; in 1907 the production was 26,750,000
barrels from 87 factories ; and at the outbreak of the war the
annual output was approximately 50 million barrels.
Setting and Hardening. — According to latest investigations
during and after manufacture, Portland Cement contains three
principal compounds which harden by hydration :
Tri-calcium silicate (3CaO . Si02).
Di-calcium silicate (2CaO . Si02).
Tri-calcium aluminate (3CaO . A1203).
Of these tri- calcium silicate seems to have the greatest
cementing quality. It is the last constituent completed during
manufacture and is formed by combination of calcium oxide
110 SEAGOING AND OTHER CONCRETE SHIPS
(CaO) with 2CaO . Si02. Some free CaO is also present in amounts
depending on the burning process. The iron oxide, magnesia,
alkalies, etc., have little effect on the three principal cementing
compounds, but are added to bring about a combination of CaO
with alumina (A1203) and silica (Si02) during manufacture.
Hardening takes place in the following order :
Tri-calcium aluminate (3CaO . A1203) ; Tri-calcium silicate
(3CaO . Si02) ; Di-calcium silicate (2CaO . Si02).
When water is added to Portland Cement these compounds
are first of amorphous and later both crystalline and amorphous
character, acting much like ordinary glue. The hardening
continues under water, as the minerals are nearly insoluble.
The initial set of Portland Cement is no doubt due to hydration
of tri-calcium aluminate.
Specification. — All ordinary requirements and tests have
been standardized in detail and are practically identical in
countries where Portland Cement is manufactured. In general
the consumer will find it most practical to send samples for
testing to laboratories which specialize in this work. A descrip-
tion of such tests can readily be obtained from any testing
laboratory or from any handbook on ordinary concrete con-
struction. Briefly the following requirements must be fulfilled :
(1) Definition. — Portland Cement is the product obtained by
finely pulverizing clinker produced by calcining to incipient
fusion an intimate and properly proportioned mixture of argil-
laceous and calcareous materials, with no additions subsequent
to calcination excepting water and calcined or uncalcined gypsum.
I. Chemical Properties
(2) Chemical Limits. — The following limits should not be
exceeded :
Per cent.
Loss on ignition . . . . . 4-00
Insoluble residue ..... 0«85
Sulphuric anhydride (S03) . . . 2-00
Magnesia (MgO) 5-00
II. Physical Properties
(3) Specific Gravity. — The specific gravity of cement shall
not be less than 3-10 (3-07 for white Portland Cement). Should
SHIPBUILDING CONCRETE 111
the test of cement as received fall below this requirement a second
test may be made upon an ignited sample. The specific gravity
test will not be made unless ordered.
(4) Fineness. — The residue on a standard No. 200 l sieve
shall not exceed 22% by weight.
(5) Soundness. — A pat of neat cement shall remain firm and
hard, and show no signs of distortion, cracking, checking, or
disintegration in the steam test for soundness.
(6) Time of Setting. — The cement shall not develop initial
set in less than 45 minutes when the Vicat needle is used or
60 minutes when the Gillmore needle is used. Final set shall
be attained within 10 hours.
(7) Tensile Strength. — The average tensile strength in pounds
per square inch of not less than three standard mortar briquettes
composed of 1 part cement and 3 parts standard sand, by weight,
shall be equal to or higher than the following :
Age at Test, Storage of Tensile Strength,
days. Briquettes. Ib. per sq. in.
7 1 day in moist air, 200
6 days in water
28 1 day in moist air, 300
27 days in water
(8) The average tensile strength of standard mortar at 28
days shall be higher than the strength at 7 days.
The above example is extracted from Standard Specifications
and Tests for Portland Cement worked out by a special Committee
representing the U.S. Government, American Society of Civil
Engineers, and American Society for Testing Materials in 1916.
Storage. — The best Portland Cement may be destroyed before
use by being stored in a wrong manner. The storage house
must be absolutely weatherproof with floor at least 2 feet above
ground level and free air circulation under the floor. Instead
of windows there should be covered openings for ventilation and
the cement must be placed at least 8 inches away from external
walls and the floor. It should be stored so that inspection and
samples can be readily taken from each shipment, which is kept
separate until approved.
Cement in bags piled on top of each other frequently tends
1 i.e. 200 wires per inch.
112 SEAGOING AND OTHER CONCRETE SHIPS
to harden from the pressure (" warehouse set "). This does no
harm and is broken up by tossing the bags about, as the hardening
is not due to any chemical action in the cement.
A moderate amount of seasoning improves Portland Cement,
which sometimes contains a little free lime, which causes expansion
during hardening. By seasoning this is first slaked and then
changed to calcium carbonate, which does not swell when
hydrated.
Water. — It is generally advisable to use fresh water when
making concrete. But sea-water can be used in rich mixtures,
such as shipbuilding concrete ; the results of extensive tests
do not indicate any detrimental effects from the use of sea- water
with such mixtures.
The water should be of ordinary clean, drinking quality ;
free from impurities such as oils, acids, alkalies, or vegetable
matter. Acids or alkalies are easily detected by litmus paper,
oils are detected by iridescent surface films, and vegetable matter
and other impurities either float in, or give a bad taste to, the
water. If in any doubt, chemical analysis and tests should be
made to decide the effect of the water on the strength and
hardening of the cement.
Water reacts chemically with Portland Cement and forms a
binding composition of amorphous and crystalline character,
which unites the grains of fine and coarse aggregate in the con-
crete. It also carries the cement particles over all surfaces of
the aggregate and promotes close adhesion by filling with the
cementing substance all minute irregularities between the
aggregate filler. Further, a certain amount of water is required
to lubricate the concrete mass in order to reduce friction between
the particles and allow the concrete to be properly placed in the
forms.
The binding strength of cement depends upon the interlacing
of crystals, and crystallization, as is well known, will only take
place from a saturated or supersaturated solution. If insufficient
water is supplied the chemical reaction will, naturally, stop
before it is completed. Too much water is also bad, because it
dilutes the cementing compound and reduces the strength of
the binding substance, even if this afterwards is partly recovered
when the water evaporates. Further, small air bubbles are often
enclosed by superfluous water and adhere to the surfaces of the
SHIPBUILDING CONCRETE 113
aggregate, sometimes even to the extent of displacing the finest
aggregate ; this defect frequently occurs also as the result of
excessive mixing. The various elements in concrete, cement,
water, fine aggregate, and coarse aggregate, all occupy definite
amounts of space. If the concrete is placed in watertight forms
all the materials remain in the mass ; whereas if the forms are
not watertight some of the water will escape, either before or
after the concrete has hardened. But when the forms are removed
any water remaining uncombined can escape, either by evapora-
tion, gravity, or capillary action ; and the escape of uncombined
water leaves spaces in the concrete. Hence an excess of water
reduces the strength of concrete ; it also reduces the durability,
for porous concrete is subject to penetration by water or other
liquids of chemical action which may freeze with a bursting
effect, so causing deterioration.
A result of excess water is frequently evident in cases where
concreting has been stopped for a day. A chalky substance—
laitance — gathers on the surface of the material last poured ;
this is composed of light particles of inactive cement which have
floated to the top and remain there as a creamy substance,
possessing no strength, and so detrimental to the attainment of
a good joint.
The strongest and most waterproof concrete is secured by
thorough mixing with the addition of the minimum amount of
water for complete hydration of the cement. The amount of
water should be determined by means of actual tests such as are
described below. The water should be added gradually, and
the cement and aggregate should be mixed dry before any water
is added. The results of some tests showing the effects of varying
amounts of water are given in Table C on p. 126.
Aggregate. — The inactive elements of concrete, sand, gravel,
crushed stone, etc., all classed as aggregate, make up about
80 per cent, of the total volume. And the quality of this ' ' filling ' '
material is just as important as that of the active, or binding,
ingredients.
There is no definite distinction between sand and small
gravel. It is customary, however, to consider all particles of
gravel, crushed stone, or other material less than J inch diameter
to be fine aggregate, and to classify as sand all mineral particles
between two millimetres and 0-5 millimetre diameter. All
8
114 SEAGOING AND OTHER CONCRETE SHIPS
particles larger than J inch diameter are termed coarse aggregate.
In concrete for land work the coarse aggregate is generally from
f inch to 1J inch diameter ; but in concrete for shipbuilding
purposes the coarse aggregate should not exceed \ inch diameter.
The essential qualities of an aggregate for shipbuilding con-
crete are : maximum density, hardness, durability, light weight,
and insolubility in water. These qualities are possessed in varying
degree by materials belonging to the following main groups ;
and aggregates in common use generally belong to one or other
of these :
Igneous Rocks, such as, for example, Granite, formed by the
consolidation of molten matter. Granite is composed almost
entirely of minerals, quartz, orthoclase, and mica or hornblende,
without any cementing substance. It is exceedingly hard and
dense ; and it has the strength and durability of a first-class
aggregate, but is rather lacking in toughness. Trap Bock, or
Diabase, is another volcanic rock of high compressive strength,
and it adheres well to cement. It is an excellent aggregate
except when it contains much iron in low oxides, for these expand
by absorption of oxygen and may rupture the concrete.
Sedimentary Rocks, such as, for example, Sandstone. Sand-
stone is in structure a natural concrete, depending for its character
upon the different aggregates present, which may be quartz,
felspar, hornblende, chlorite, magnetite, etc., cemented together
by oxides of iron and carbonates of lime or clay ; the strength
and hardness depend on the quality of the cementing substance.
Sandstones are not, in general, suitable aggregates for ship-
building concrete since they lack strength and durability. Lime-
stone, carbonate of lime deposited under water and subsequently
hardened, is another example of a sedimentary rock. Some types
are chemical products, others are formed from shells of small
animals or hardened tissues of plants. Limestone rarely con-
sists of pure carbonate of lime and is found in many colours,
white, yellow, blue, green, etc., frequently containing some
magnesia. It is generally considered to be a suitable aggregate
for land construction ; but when it is crushed to a small size,
as for shipbuilding concrete, it ruptures in a flaky manner, and
so it should be thoroughly tested with varying mixtures.
Metamorphic Rocks (Conglomerates). — These geological forma-
tions may contain rocks of varying origins, and their qualities
SHIPBUILDING CONCRETE 115
must be thoroughly investigated by chemical analysis and practical
tests. Gravel is natural rock broken away from parent ledges
and worn round by rolling in rivers ; it possesses, therefore, the
same qualities as the parent rock, and if of good mineral quality
is a very satisfactory aggregate for shipbuilding concrete. The
surface is generally rough and well suited for the adhesion of
cement.
Artificial Aggregates, such as Crushed Bricks, Cinders, Blast-
furnace Slag, and similar materials are used in cases where
strength and watertightness are not of importance.
Impurities in Aggregate. — Silt, which consists of particles
between 0-5 millimetre and 0-005 millimetre in diameter, and
Clay, which consists of particles less than 0-005 millimetre in
diameter, are both as a rule harmful, although a small amount
(about five per cent.) of finely pulverized, perfectly clean, clay
improves the watertightness of the less rich concretes ; but this
is a risky method of trying to obtain watertightness, for the clay
has a tendency to form lumps which obviously cause weak spots.
Clay should not be used in any form in shipbuilding concrete.
Mica is very harmful in high-grade concrete. It has hardly
any strength ; and the surface is not made moist by water, so
that the cementing compound does not adhere and the mica is
merely loosely embedded in the concrete mass.
Iron Pyrites (Fe2S), a bright yellow substance, is a common
impurity in stone. In contact with water it forms sulphuric
acid, which attacks cement with disastrous results. In coarse
aggregate, however, it is not so harmful as in fine aggregate,
where it is more active in forming acids, and where its presence
should be carefully prevented.
'Stone Dust (crushed stone screenings) has practically the same
effect as Silt or Clay. It is never of value in high-grade concrete
such as is used in shipbuilding, and should be removed from the
aggregate by careful washing.
Organic impurities are all harmful. The most common
organic impurity is Loam, which not only prevents cement from
adhering to mineral grains of sand but seems to have also a
chemical action which is at present under investigation. Tannic
Acid, Colloidal Sewage, Manure, Sugar, Tobacco Juice (Spit),
etc., are examples of organic impurities having very injurious
effects on concrete. Other impurities, too minute to be seen,
116 SEAGOING AND OTHER CONCRETE SHIPS
must be detected by chemical analysis, or by practical tests
where a lack of strength is difficult otherwise to explain.
Most organic impurities can be removed by careful washing.
Hence the first condition for a satisfactory aggregate is that it
shall be perfectly clean.
Sand. — All fine aggregates come from rocks which have
disintegrated. Sand is the natural deposit of such material,
carried for thousands of years by rivers towards the sea. Changes
which have taken place during the vast periods of time and
travel are partly physical and partly chemical. The physical
effects have not changed the character of the particles from that
of the parent rock, which is merely broken up and reduced in
size. For instance, a quartz sand contains silicates of exactly
the same type as the parent rock; it is probably the best sand
for all concrete work.
Chemical changes of the fine aggregate which have taken
place during thousands of years are quite different from the
physical changes. The particles decompose, losing their original
character, and enter into new compositions ; examples of such
change are clay and silt. As a rule chemical changes are harmful.
The composition and character of the original rocks are of
great importance. For instance, a fine aggregate obtained from
sandstone consisting of quartz grains cemented together with
calcium carbonate or clay is not suitable for shipbuilding con-
crete. It is often white and very pleasing to the eye, but the
cementing clay absorbs water during the mixing of the concrete
and forms a soft putty, which separates the sand particles and
prevents contact with the Portland Cement, so reducing the
strength of the concrete. Calcium carbonate may be detected
by muriatic acid, which will effervesce if calcium carbonate is
present.
Sand originating from limestone formed by the fossilizing of
minute prehistoric shells is not suitable as a fine aggregate,
since it is easily decomposed and contains tiny voids.
Sea sand is generally satisfactory, but it should be taken
from the bottom, not from the beach where the grains are polished
and smooth from being rubbed together by the waves instead of
having the rough irregular surface which enables the cement
particles to adhere intimately. Further, beach sand contains
more organic matter than sand from the bottom or from above
SHIPBUILDING CONCRETE 117
the beach. Saline deposits do not seem to be harmful in rich
concretes.
The sand grains should be of varying sizes. Standard testing
sand used in laboratories passes through a No. 20 sieve and
remains on a No. 30 sieve ; the grains are therefore of uniform
size, and so the sand has a large amount of voids. Mortars made
with such sand are not strong ; but most regulations for concrete
construction accept a strength equal to that from tests with
standard sand. For shipbuilding concrete, however, such a
strength is not sufficient, and the very best quality of sand is
required for mortar and concrete. As pointed out above, the
cost is of less importance than in land construction, and the
material may accordingly be washed and screened in a more
thorough manner.
The customary manner of specifying fine aggregate, or sand,
for land construction is merely to state that the material should
be " sharp, clean, and coarse." Individual opinions may differ
considerably as regards these qualities, and the specification is
not sufficiently exact for the high-class aggregate required for
shipbuilding concrete. For shipbuilding concrete the fine
aggregate must have :
Cleanness, determined by careful washing, by chemical tests,
or by both methods together. Sand containing more than one
per cent, of mica should be prohibited. ,
Coarseness, determined by granulometric screening.
Strength, determined by actual compression tests with mortars
and concretes at 7 days and 28 days with different mixtures.
Light-weight Aggregate. — Extensive experiments were carried
out by the Concrete Ship Section of the U.S. Shipping Board in
order to develop an artificial aggregate of light weight. Experi-
ments towards the same end ha^e been carried out also by the
author.
The author burned clay in a limekiln under various conditions
of moisture and temperature and succeeded in obtaining an
aggregate which floats in water owing to the air-cells blown in
the material. The strength was not, however, comparable to
that of first-class gravel, and much of the advantage as regards
lightness was lost when the material was crushed down to the
sizes required in shipbuilding concrete ; many of the air-cells
were broken up and so the unit weight increased. Particulars
118 SEAGOING AND OTHER CONCRETE SHIPS
of the U.S. Shipping Board material can be obtained in Engineering
News-Record, vol. Ixxxii, No. 17, p. 802.
Concrete made with any of the light-weight aggregates which
have sufficient strength to be considered for shipbuilding pur-
poses weighs about 100-110 Ib. per cubic foot, that is, about
75 per cent, of the weight of gravel concrete. But when it is
borne in mind that the reduced strength of the light-weight
concrete involves the use of more concrete in the ship in order
to attain a desired standard of strength, it is obvious that the
saving in weight of hull is not so great relatively as the saving
in weight per cubic foot.
Light-weight aggregate is harsh and unpleasant to work,
and readily forms pockets in the concrete on account of the
porous, sharp surfaces grinding against each other, thereby
causing excessive friction between the pieces of aggregate and
reinforcement. This fact accounts for the easy shattering of
the shell from an external blow recorded with reference to the
S.S. Cape Fear in the last report (21st January 1921) of the
" Special Committee on Concrete Ships and Barges " to the
American Concrete Institute. In none of the collisions, ground-
ings, etc., of concrete ships built by the author's firm, in which
gravel concrete was used, has damage in the form of cracks or
shattering of surrounding concrete extended appreciably beyond
the local wound ; the crushing has always been clearly defined
and limited.
The author does not agree with the frequent assertions that
the light-weight aggregate is waterproof because each air-cell is
closed off from its neighbours ; simple experiments — for example,
floating a few pieces of the aggregate in water — show that after
a few weeks, at most, the pieces lose buoyancy and finally sink.
It is believed that Lloyd's Register have not so far been satisfied
with the waterproof qualities of the light-weight aggregate.
Of course, mixing with Portland Cement, which fills up the pores,
greatly adds to the watertightness. When, further, special
coatings and paints are applied to the concrete surface a ship
built with light-weight aggregate can probably be made perfectly
watertight.
Proportions of Mixture. — Scientists and engineers are at
present trying to determine general rules for securing the best
possible grade of concrete. But from the nature of the problem
SHIPBUILDING CONCRETE 119
it is not probable that definite rules will cover all cases, since
finished concrete depends for its quality not only on the correct
proportions of the ingredients, but on the mixing, placing in the
forms, and conditions during the setting and hardening.
The following considerations should be borne in mind when
deciding the proportions for shipbuilding concrete :
1. The compressive strength after 28 days of age should not
be less than 4,000 Ib. per sq. inch.
2. The watertightness should be perfect for pressures due to
at least the full depth of the ship in which the concrete is to be
used.
3. The mixture should be plastic and easily worked around
the steel reinforcement in the forms without too much water
being used.
If the first condition is fulfilled the shearing strength, abrasive
quality, and adhesion to the steel will generally also be satisfactory.
If the second condition is fulfilled the density of the concrete
will generally be satisfactory, thereby assuring durability pro-
vided the aggregate is of the highest class.
If the third condition is carefully maintained, the result will
be an all-round good quality of concrete. The bad effects of too
much water have already been explained. On the other hand;
the mixture must not be so dry that there is insufficient water
for the chemical reaction or that the concrete clogs between
the reinforcing rods and leaves hollow spaces. The amount of
water should not always be constant, but should vary according
to the temperature, speed of concreting, and position in which
the concrete is to be placed. In bottom and deck the concrete
is readily worked around the reinforcement even if the mixture
is fairly dry. In the ship's sides this is not possible, nor in
bulkheads, narrow beams or stanchions, and so in these places
the concrete must be relatively moist.
The author has found from practical experience gained during
four years by the construction of about 30 concrete ships that
the proportions of the mixture should be about
1 part Portland Cement,
2-J- parts Aggregate.
The mixture found to be most satisfactory with the brand
120 SEAGOING AND OTHER CONCRETE SHIPS
of Portland Cement and the local aggregates used in the ships
built Ijy the author's firm was
1 part Portland Cement,
1-85 parts Sand,
0-65 part Gravel.
It may be mentioned that in the Namsenfjord the mixture
used in the deck and bottom was
1 part Portland Cement,
1-4 parts Sand,
2-6 parts Gravel.
The mixture used in the sides was
1 part Portland Cement,
1-5 parts Sand,
1-5 parts Gravel.
The difference between the proportions used in the Namsen-
fjord and those used latterly is the result of experience. Gravel
is difficult to work around steel reinforcement in confined spaces,
and it cannot be mixed in mortar which is plastered on, for the
gravel jumps out when the mortar is thrown on to the metal
mesh. Apart from these considerations, a large amount of
gravel in the mixture not only tends to cheaper concrete but
also to stronger concrete. Compare, for example, the following
results from tests made by the author :
Mixture. Age. Compressive Strength.
1:2 . .3 months 4,270 Ib. per sq. inch
l:2i . . „ 3,840 „
l:lj:2i . „ 4,520 „
l:lf:2| . „ 4,880 „
Since cement is the most expensive ingredient of concrete it
is obvious that the last mixture, containing 1 part cement to
4 parts aggregate, is cheaper, besides being stronger, than the
first mixture, containing 1 part cement to 2 parts aggregate.
But for shipbuilding concrete compression tests made in a labora-
tory do not always indicate the most satisfactory proportions,
because watertightness and easy-working quality are of greater
importance in relation to compressive strength than in the case
of concrete for land construction.
SHIPBUILDING CONCRETE
121
In the ships built for the U.S. Shipping Board the mixture
used was generally
1 part Portland Cement,
0-67 part Sand,
1-33 parts Gravel.
As a general rule the mixture should not be made richer than
1 part cement : 2 parts aggregate, because expansion, contraction,
and Modulus of Elasticity increase with the proportion of cement.
On the other hand, the mixture should not be leaner than 1 part
cement : 3 parts aggregate, because watertightness then becomes
uncertain ; the ship may not actually leak, but water will pene-
trate into the concrete and cause corrosion of the reinforcement.
The following table gives average values of the compressive
strengths of various mixtures, as determined from tests carried
out by the author :
TABLE A.— AVERAGE COMPRESSION VALUES OF VARIOUS MIXTURES
Proportions
of Mixture Cement : Sand :
Gravel .
Percentage
of Water
by Volume.
Compression, Ib. per sq. inch,
average after
7 days.
28 days.
fl :
2-50 : 0-00
15
2,020
3,540
1 : 2HI :
2-00 : 0-50
15
3,180
3,060
\1:
1-85 : 0-65
w
3,320
4,130
1:3 1 :
2-25 : 0-75
14i
2. 005
3,225
f1:
1-50 : 2-50
11
2,990
3,885
1:4 { 1 :
1-90 : 2-10
12
2,450
3,345
1
2-25 : 1-75
13
2,220
2,730
All tests were made on 8" X 8" X 8" cubes at the Christiania
Materials Testing Laboratories according to instructions from
the author. The concrete was not rammed, but the sides of the
forms were tapped lightly and the free surface smoothed off with
a straight board.
The amount of water is stated as a percentage of the total
volume of cement, sand, and gravel. The materials were always
proportioned by volume (not by weight).
The sand was retained on a No. 30 and passed through J inch
screen. The gravel was retained on J inch and passed through
J inch screen (the meshes in the latter were nearly f inch).
Assuming that the cement and quality of aggregate are first-
122 SEAGOING AND OTHER CONCRETE SHIPS
class and have been examined or tested as previously described,
the following simple field tests to determine the amount of voids
in the aggregates and the density of the concrete are very useful
as indicating the mixtures likely to give the best results in actual
compression tests ; they are carried out by means of an accurate
pair of scales and a large graduated measuring glass.
The percentage of voids in the aggregate can be determined by
two methods :
1. By finding the amount of water required to fill all the
voids in a certain volume of the aggregate.
2. By determining the specific gravity of solid pieces of the
aggregate, then weighing a given volume of the aggregate, and
finally calculating the percentage of voids.
By the first method voids in, for example, sand are found
by filling the measuring glass with, say, 100 measures of dry
sand. Pour this out and fill the glass up to, say, 60 measures
with water. Into this sprinkle slowly the same 100 measures
of dry sand. These will now be found to fill the glass only to,
say, 94 measures, having shrunk six per cent. ; while the water
will reach to, say, 121 measures, of which 121 — 94 =21 measures
will be above the sand, and 60 — 27 = 33 measures will be
filling the voids in 94 measures of wet sand. Then the voids in
33
the wet sand amount to — = 0-351 = 35-1 per cent, of the wet
mass. If the sand is poured into the water hastily air is carried
in with it, the voids will not be filled, and the result will be
misleading.
If the second method be adopted the specific gravity of a
solid piece of aggregate must first be determined, either by
dropping the aggregate into a given volume of water (noting the
increase in volume of the liquid), or by suspending a piece of
aggregate by thread from the scales and noting the weight in
air and weight when hanging in water. In such tests it is
desirable to use metric measures of volume and weight, as sim-
plifying the arithmetic since 1-0 cub. cm. of water weighs 1-0
gram. For example, 670 cub. cm. of quartz weigh 1,775-5
1775*5
gram. Therefore = 2-65 is the specific gravity of quartz.
If now, say, 450 cub. cm. of sand weigh 793 gram and the same
volume of solid quartz weighs 450 X 2-65 = 1,192 gram, the
SHIPBUILDING CONCRETE
123
sand is
793
= 0-665 solid, or contains : 1-000 — 0-665 = 0-335
1192
= 33-5 per cent, of voids.
The specific gravity of sand is practically constant at a value
of 2-65.
The specific gravity of gravel is also practically uniform ; an
average value is 2-66.
For different kinds of stone the specific gravity varies from
2-4 for Sandstone to 2-6 for Trap Rock. The percentage of voids
in dry sand ranges from 28 in coarse, well- graded material to
45 in uniform screened sand ; in coarse aggregate it varies from
25 to 55 per cent. Natural sand contains 2 to 4 per cent, of
moisture by weight. It increases in volume to a maximum at
about 7 per cent, of moisture, because the water surrounds the
particles and separates individual grains.
The following values are based on a specific gravity of 2-65.
TABLE B.— PERCENTAGES OF VOIDS IN SAND AND GRAVEL CORRE-
SPONDING TO DIFFERENT WEIGHTS PER CUBIC FOOT
Percentages
Weight per cubic foot of Sand or Gravel in lb.
by Weight .
90
95
100
105
110
115
120
125
0
45-7
42-7
39-6
36-6
33-6
30-6
27-5
24-5
2
4C-7
43-8
40-8
37-9
34-8
31-9
28-9
26-0
4
47-8
45-0
42-0
38-1
36-2
33-3
30-4
27-5
6
48-9
46-0
43-2
40-4
37-5
34-7
31-7
29-0
8
50-0
47-2
44-5
41-6
38-9
36-1
33-3
30-6
The amount of voids depends on the compactness of the
aggregate, and it is customary to determine voids in dry sand
well shaken, and for coarse aggregate in loose measure, because in
concrete the particles of coarse aggregate are separated by sand
and cement. By shaking coarse aggregate the amount of voids
may be reduced by as much as 10 per cent. If spheres of any
uniform size are carefully piled together in the most compact
manner, the mass contains 26 per cent, of voids. If thrown
together and allowed to arrange themselves the voids will
increase to 44 per cent. When all particles are of uniform size
and shape the voids will be practically the same as in other
materials having larger or smaller particles of similar shape and
iunorm size. Aggregate with round grains contains less voids
124 SEAGOING AND OTHER CONCRETE SHIPS
than aggregate with angular particles, and the largest percentage
occurs when all grains are of the same size. The minimum
amount of voids is obtained in a material so graded that each
size of particle fills the voids between the other particles.
The density of concrete can be investigated by means of a
simple field test preliminary to laboratory tests of strength,
which must be carried out later.
Definite quantities of cement, fine and coarse aggregate are
weighed in proportions corresponding approximately to the
mixture it is proposed to use. The materials are mixed together
with a certain amount of water, also weighed, and after obtaining
a concrete of proper consistency, it is poured into a large measur-
ing glass, which is gently tapped on the sides a certain number
of times and the volume of concrete is noted after a certain
time, for instance three minutes. This concrete is then thrown
away and a new batch made with exactly the same total weight
of materials, but slightly altered proportions of fine and coarse
aggregate and water. After mixing and filling the concrete into
the measuring glass in exactly the same manner as before the
volume is noted, and if smaller than that of the first batch it
proves that the mixture has greater density.
By such preliminary investigations an indication is obtained
of the proportions likely to be most satisfactory.
Mixing. — Shipbuilding concrete should always be machine-
mixed in a batch mixer, of which there are many well-known
types on the market. The capacity is generally J, }, or 1 cub.
yard, and the mixer should be driven at the speed recommended
by the manufacturer. The concrete should remain in the mixer
at least 1J to 2 minutes ; an average time of 3 minutes for each
batch was adopted for the ships built by the author's firm.
Before the materials are put into the mixer they are carefully
measured (by volume) and proportioned to suit a practical
measure of cement, for example 2 bags or 1 barrel in each batch.
The fine and coarse aggregates are stored in separate bins and
measured in hoppers, steel-lined or of steel, and made carefully
true to form so that the quantity of material can be closely
gauged. In this way it is unnecessary to measure the cement
except by checking once in a while the weight of cement bags
(or barrels). Water is supplied from a barrel or tank provided
with a gauge glass and a large outlet cock to permit a rapid
SHIPBUILDING CONCRETE 125
supply to the mixer. In cold weather the water must be heated
by steam coils in the barrel, even to the boiling-point if necessary
and sufficient steam is available. In cold weather it is also well
to heat the aggregates by steam coils in the storage bins or by
any other method.
The details of a mixing plant depend on the facilities of the
shipbuilder and should be planned accordingly. At least two
mixers should be installed, in case of a break-down. An inspector,
preferably an engineer realizing his full responsibility, should
always be present at the mixing plant when concreting. He
sees that the materials are clean, of quality as specified, and
proportioned correctly t; and he must assure himself that the
mixer is clean before work commences, that the water-cock and
other valves supplying materials are tight-fitting so that no
leak occurs by which extra material is added or lost in the
mixer. The amount of cement is controlled by counting empty
bags and checking up the number in relation to the number of
batches. One man controls the supply of materials and one
runs the mixer. The latter is responsible for the time consumed
and proper mixing of each batch. If a stop occurs in the con-
creting operation a batch should not be mixed longer than
30 minutes, and in such a case the mixer should be run very
slowly.
Tests have shown that even mixing for three to four hours
has not materially reduced the tensile strength of mortar, but
the results are so erratic that no certain conclusions can be made,
and other tests show opposite results. Slightly more water
should be added during exceptionally long mixing.
Concrete should always be placed in its final position within
one hour from the completion of mixing. In exceptional cases
mixtures up to two hours old can be remixed and used, but
this should never happen unless quite unavoidable and both
water and extra cement should be added to the concrete, which
must be thoroughly stirred up and remixed until it has normal
consistency.
U.S. Dept. of Agricult. Bull. No. 235 refers to tests by the
Office of Public Roads which show that mortars of mixture 1 : 2
have at the age of four months approximately the same tensile
strength whether remixed after If hours (initial set of cement)
and after 7J hours (final set of cement), or when left to harden
126 SEAGOING AND OTHER CONCRETE SHIPS
immediately after being mixed. Water was added to restore
normal consistency. But the same tests show that mortar of
mixture 1 : 3 lost about 17 per cent, in tensile strength under
the same conditions.
Placing and Curing. — Concrete may be transported to the
forms by carts or buckets, but not by spouts.
Spouts are satisfactory in ordinary land construction, but ship-
building concrete must be handled more carefully than land
concrete. In traversing long spouts the concrete tends to
separate and absorbs air-bubbles. When passed along spouts
concrete must be made moister than when transported in buckets
or carts.
The inspector must carefully inspect the forms and all steel,
which should be placed in position before concreting. The forms
must be tight and are sprayed with a water hose, but care should
be taken that superfluous water escapes through special drain
holes made for this purpose before any concrete is deposited.
The most important duty of the engineer in charge of placing
concrete is to decide and maintain the correct consistency of the
concrete and regulate the amount of water accordingly.
sThe facts stated on the preceding pages should be carefully
borne in mind, since apart from these only practical experience
with the actual materials can show how much water is needed.
In hot weather the mixture should be softer, because the water
naturally evaporates faster. Table C gives average values
from about 100 tests on samples taken from the concreting of
two seagoing ships during summer and autumn and shows the
effect of varying amounts of water.
TABLE C.— COMPRESSIVE STRENGTH AFTER 28 DAYS
Mixture by Volume.
Ship No.
Date of Concreting.
Percentage of
Water by Volume.
Compressive Strength
in Ib. per sq. inch.
1 : 1-85 : 0-65
28
Nov. 1918
14
4,607
M
n
Oct. 1918
15
4,522
)»
» »»
19
4,593
»
33
July 1919
20
4,323
»
»
» »
25
4,110
The test cubes (8" X 8" X 8") were made in the shipyard
from samples selected by the Classification Society's inspector
during the actual concreting.
SHIPBUILDING CONCRETE 127
Concrete should preferably be placed continuously until the
hull is completed. Practical difficulties may prevent this,
however, and it has been found that a shut-down from, say,
11 p.m. to 5 a.m. does no harm, when care is taken that the
surfaces of the joints are kept scrupulously clean and brushed
with a solution of neat cement and water before new concrete is
placed. No joints can then be seen after the forms are removed.
Concrete should be tamped in the forms with short rods in
layers of about 4 to 6 inches until it has a uniform consistency
like soft jelly. Water will work itself to the top, but the mixture
should not be so wet that superfluous water will collect on top
of the concrete before the next batch is placed. A few bags
of cement should always be kept near the forms so that the
mixture can be made dryer in case a single batch is made too
wet by accident.
The curing of shipbuilding concrete is generally easier than
that of ordinary concrete in roofs, floors, etc., since ships are
usually built under cover and the double forms on the sides
retain the moisture in the concrete. The most exposed part
is the deck, on which the finishing coat should not be worked
until all machinery, fittings, rigging, etc., are placed ; this
may be several months after the ship is launched. During the
first 8 or 10 days after concreting the deck should be kept
moist with wet sacks and all exposed parts of the concrete sprayed
by means of a hose regularly in the mornings and evenings. After
this period the outside forms can be removed and the exterior
finish plastered on, the rough concrete surface having first been
thoroughly soaked by means of a hose exerting good water-
pressure.
The exterior cement finish should be mixed in the proportion
1 part Portland Cement,
2| parts Sand.
The sand may be considerably finer than that used in the con-
crete, and may pass through a No. 20 and be retained on a No. 40
sieve. The cement finish should be about J inch thick, plastered
on by hand in the usual manner, as a continuous operation. It
should be kept moist for about 10 days and be protected against
strong sunshine for another 10 days.
Much research work has been done to find the best method
128 SEAGOING AND OTHER CONCRETE SHIPS
of placing and curing concrete, but many experiments are based
on artificial conditions (in the laboratory) which never occur in
practical life, and the results are of little interest to the engineer
or shipbuilder.
Steam Curing. — In exceptional cases, such as repairs of
ships after grounding or collisions, concrete may be cured by
special methods, so as to harden in a few days to an extent
which otherwise would require the same number of weeks or
even months. The curing can be done by steam, and interesting
tests on the subject have been made by the U.S. Bureau of
Standards (Tech. Paper No. 58) as referred to in Table D.
TABLE D.— EFFECT OF CURING 1 : 4 MORTAR UNDER STEAM
PRESSURE (8" X 16" cylinders)
Gauge Pressure
Ib. per sq. inch.
Temperature
(Fahr.).
Duration of
Exposure to
Steam (hours).
Compressive Strength in Ib. per sq. inch.
2 days.
7 days.
14 days.
28 days.
Not steamed
613
1,296
1,528
1,727
0
212
48
1,267
—
—
—
2
218
24
1,808
1,792
1,805
—
10
239
24
1,786
1,555
1,701
1,902
20
258
24
2,139
2,284
2,740
—
40
286
24
3,292
3,381
3,984
—
80
323
24
3,964
3,966
4,433
—
80
323
24
4,487
4,187
4,840
~~
These tests were made on Portland Cement mortar, but
similar results were found with regard to concrete. The mortar
and concrete should have an initial set before being exposed to
treatment with steam.
Freezing. — The opposite effect to steam curing is found when
concrete freezes, or is cured at low temperatures. Hardening
requires from 4 to 8 times as long as is required normally.
Experimental studies of the effect of frost on mortar and concrete
are somewhat conflicting in their conclusions. It is generally
assumed that if concrete is prevented from freezing during the
first 48 hours after being placed the chemical action will continue
even if the temperature drops considerably below freezing-point.
Tests indicate that a mixture of 1 Cement, 2 Sand, 4 Aggregato
(| inch size) when cured at 30° F. will have at 28 days of age
about 60 per cent, of the compressive strength which it would
have had if placed and cured at normal temperature (70° F.).
Two facts tend to lessen the injurious effect of freezing
SHIPBUILDING CONCRETE 129
that concrete is a poor conductor of heat, and that the chemical
action of setting and hardening cement evolves heat and raises
the temperature. Both points, however, apply to concrete in
large bulk more than to concrete in shipbuilding, where the
quantities are always small.
Vibration, Pressure, etc. — Vibration of the forms and com-
pression of the mass have been tried as means of producing
concrete of increased strength. Mechanical methods of shaking
and jigging the concrete have also been tried, and interesting
results from elaborate researches on these subjects are given
by Prof. Duff A. Abrams in Bull. No. 3, published by the Struc-
tural Materials Research Laboratory, Lewis Institute, Chicago, who
arrives at the following general conclusions, assuming that a
" Standard " method of hand-puddling concrete for laboratory
tests should be 25 strokes with a f inch steel bar for each 4 inch
layer of concrete in a 6" X 12" cylinder :
Varying the number of strokes from 12 to 50 in the " Stan-
dard " method of hand-puddling had little influence on the
compressive strength.
The various methods of mechanical shaking generally gave
lower strengths than hand-puddling, and a tamping rod of large
diameter was less effective than a smaller one.
Striking the metal forms with a steel bar after puddling by
the " Standard " method had no effect on the strength of the
concrete.
Vibration by means of an electric hammer did not affect the
strength of concrete hand-puddled by the " Standard " method
if carried on for about 30 seconds, but the strength of the concrete
was reduced by about 10 per cent, when vibrated for about
60 seconds.
Jigging generally reduced the compressive strength, no matter
the height of drop, or rate or duration of treatment ; the greater
the drop the greater the reduction in strength.
Pressure applied during moulding increased the compressive
strength of concrete to the extent of 20—35 per cent, for pressure
from 200-500 Ib. per sq. inch. The increase in strength was
due to water being expelled ; the duration of pressure therefore
made very little difference.
It is concluded that all these artificial methods of treating
the concrete do no good and may be harmful if too severe or
9
130 SEAGOING AND OTHER CONCRETE SHIPS
too long-continued ; finally it is stated, that by applying such
methods concrete may be placed dryer than usual, that excess
water brought to the surface must be removed, and that coarser
aggregate than usual may be used.
Compressive Strength. — In the introduction to this chapter
it was stated that shipbuilding concrete should possess maximum
strength, elasticity, and watertightness. Since these qualities do
not always go together it becomes necessary to investigate each
separately by actual test, and it may be found that a partial
sacrifice of one quality is necessary to obtain the others.
Investigators in different countries have tried to devise
empirical formulas giving definite mathematical relations between
the properties of finished concrete and the proportions of the
mixture. The author is inclined to believe that the application
of such formulas, with their preliminary preparations of aggregate,
will be restricted mostly to laboratory investigations because no
general rule can cover the conditions for every shipyard ; further,
concrete is made on the spot, not manufactured in a laboratory
by scientists, and shipped to the builder like steel.
Amongst the large number of rules presented by different
authorities to determine the strength of concrete the author
has only been able to recognize two which apply in all cases,
namely :
1. The strength of concrete increases with inherent strength of
cement and aggregates, provided the minimum amount of water to
make the mixture workable is used.
2. Strength increases with age for an indefinite period.
It may be assumed that the strength of concrete generally
increases with the richness of mixture (amount of cement), but
this is not always the case. Note, for instance, in Tables A and E
that a mixture 1 part cement : 4 parts aggregate (1 : 1-5 : 2-5)
has greater strength than 1 part cement : 2J parts aggregate
(1:2: 0-5) or 1 part cement : 3 parts aggregate (1 : 2-25 : 0-75).
Further, density generally denotes strength, but this assump-
tion also has frequent exceptions, and cannot be considered a
rule. Maximum density generally means maximum water-
tightness, but the greatest strength is often obtained by using
coarser aggregates in the mixture. Aggregates of different
sizes and gradings may be combined in different proportions to
produce concretes of practically the same strength.
SHIPBUILDING CONCRETE
131
Everything depends on the materials actually used and the
placing and curing of .the concrete. Rules and results of tests
with other mixtures are, therefore, only of comparative value,
and each shipbuilder ought to carry out his own investigations
with all materials at his disposal. Such tests should investigate
compressive strength, shear strength, adhesion to steel (bond),
elasticity, and watertightness.
In Table A are shown 7 day and 28 day tests of one mortar
and six different mixtures of concrete. Some further tests of
compression after 7 days, 28 days, and 3 months are given in
Table E for two mortars and one concrete, mixed and placed
under two different conditions, but from the same materials.
TABLE E.— COMPRESSIVE STRENGTH
Proportions by
Cement, Sand,
Volume :
Gravel.
Percentage of
Water by .
Volume.
Compression, Ib. per sq. inch, average after
7 days.
.28 days.
3 months.
1 : 2
15
2,530
3,780
4,270
1 : 2-5
15
2,020
3,540
3,840
1:1-5:
2-5
11
2,335
3,520
4,520
Very dry mixture, mechani-
cally rammed :
1:2
8i
5,700
6,800
7,990
1:2-5
H
4,880
5,890
6,900
1:1-5:
2-5
7-2
4,680
6,310
7,830
All the figures represent an average of three tests. The first
concretes were of usual consistency, and were placed in the
forms without any puddling. A thin knife was inserted along
the inner sides of the forms, which were slightly tapped outside,
and the free surface was smoothed off with a straightedge. The
last concretes were made very dry and mechanically rammed
in the forms. All the materials were of the same quality. The
test cubes of mortar were 4" X ¥ X 4" and of concrete 8" X 8"
X 8". The average specific gravities of the first mixtures
were 2-27 for the mortars and 2-40 for the concrete ; for the
second mixtures they were respectively 2-35 and 2-43. The
compressive strength after 7 days is seen to be more than 100 per
cent, greater for the mechanically rammed, dry concrete ; but
the mixture was much too dry to use in shipbuilding.
Shear Strength. — In Table F the shearing strengths are given
for the concretes considered in Table A ; each figure represents
the average of three tests.
SEAGOING AND OTHER CONCRETE SHIPS
Compared to results obtained by other experimenters the
shearing values are very low. It is probable, therefore, that,
in spite of precautions taken, considerable tension has contri-
buted to the failure of each specimen. Pure shear stress is
difficult to obtain in a laboratory and rarely occurs in practice.
The tests were carried out on briquettes 2f" X 2f" X 8J", firmly
fixed in iron frames from both ends towards the middle third,
which was loaded.
A formula sometimes used to find the shearing strength of
concrete is :
S = \ . V @- T, where 8 = shear strength, C = compres-
sive strength, T = tensile strength.
TABLE F.— SHEARING STRENGTH
Proportions by Volume :
Cement, Sand, Gravel.
Percentage of
Water by
Volume.
Shear, Ib. per
sq. inch,
after 28 days.
, 01 f 1 : 2-00 : 0-50
1 : **\i : 1-85: 0-65
15
144
645
600
1:3 1 : 2-25 : 0-75
14|
560
( 1 : 1-50 : 2-50
11
620
1:4 { 1 : 1-90: 2-10
12
705
1 1 : 2-25 : 1-75
13
605
The total shearing surface was 100 sq. cm., and the load
varied from 3| to 4J tons. The results are uniform, and since
shear in concrete ships is resisted principally by reinforcement
the shearing strength of concrete is relatively less important
than the compressive strength.
Bond Strength. — Table G gives values of the "bond" or
adhesion between steel and the surrounding concrete after
28 days, for the mixtures of concrete considered in Tables A, E,
and F.
TABLE G.— ADHESION BETWEEN STEEL AND CONCRETE
Proportions by Volume :
Cement, Sand, Gravel.
Percentage of
Water by
Volume.
Stress at initial slip
of steel, Ib. per sq.
inch, after 28 days.
, . 91/ 1:2-00: 0-50
1 ' Z*U : 1-85: 0-65
15
640
775
1:3 1 : 2-25 : 0-75
14£
775
{1 : 1-50 : 2-50
11
790
1 : 1-90: 2-10
12
650
1 : 2-25 : 1-75
13
535
SHIPBUILDING CONCRETE
133
The tests were made by pulling rods out of concrete blocks,
in which they were inserted about 5 to 7 inches. The exact
diameters of the rods varied from 15-1 to 15-5 mm., and the
surface of contact between steel and concrete varied from 66-4
to 86-2 sq. cm. The steel rods were taken from stock and tested
in their usual condition, with a slight surface film of rust. The
bond between concrete and steel is nearly always increased
considerably by mechanical means, namely, by the fitting of
hooks on the ends of rods, or by the use of special bars either
twisted or provided with lugs.
Elasticity. — Tables H and I give the moduli of elasticity,
in compression and tension, for the concretes already considered,
together with measurements of the permanent and total defor-
mations in each test. The compressive tests were carried out
with briquettes 2f" X 2|" X 8J", sectional area 50 sq. cm., age 28
days. Each figure is the average of three tests.
TABLE H.— ELASTICITY OF CONCRETE IN COMPRESSION
Proportions of Volume :
Cement, Sand, Gravel.
Percentage of
Water by
Volume.
Reduction in Length per cent.
Modulus of
Elasticity,
Ib. per sq. inch.
Permanent.
Total.
, 9,(1 : 2-00: 0-50
15
0-066
0-190
5,405,000
1 ^*U : 1-85: 0-65
14£
0-062
0-171
4,975,000
1:3 1 : 2-25 : 0-75
14|
0-057
0-158
6,400,000
(1 : 1-50: 2-50
11
0-075
0-167
6,255,000
1:4 1 1 : 1-90: 2-10
12
0-042
0-103
6,045,000
1 1 : 2-25: 1-75
13
0-041
0-092
4,695,000
The tensile tests were carried out with briquettes 21" X
2}" X about 5f", sectional area 50 sq. cm., age 28 days. Since
the elongations were very irregular the results in Table I are
given for individual tests.
Properly speaking an inelastic material like concrete has no
coefficient, or modulus, of elasticity, which is the ratio between
unit stress and unit stretch or deformation within the elastic
limit. The modulus of elasticity for concrete is, therefore, defined
as the ratio of an increment of stress to a corresponding increment
of deformation.
It increases with age and richness of mixture and varies
considerably with different aggregates and cements. For cinder
concrete it is about half of the value obtained for ordinary stone
or gravel concrete.
134 SEAGOING AND OTHER CONCRETE SHIPS
TABLE I.— ELASTICITY OF CONCRETE IN TENSION
Proportions by Volume :
Cement, Sand, Gravel.
Percentage of
Water by
Volume.
Test
No.
Elongation per cent.
Modulus of
Elasticity,
Ib. per sq. inch.
Permanent.
Total.
f
a,
0-0012
0-0055
4,700,000
ri : 2-00: 0-50
15
b
0-0010
0-0042
3,550,000
1
c
—
1
j
a
0-0019
0-0058
4,065,000
ll : 1-85: 0-65
b
0-0039
0-0075
4,700,000
1
c
0-0019
0-0055
3,780,000
(
a
0-0011
0-0049
4,380,000
1:3 1 : 2-25 : 0-75
14|
b
0-0016
0-0042
4,380,000
I
c
0-0008
0-0035
4,065,000
a
0-0033
0-0069
—
1 : 1-50 : 2-50
11
b
0-0033
0-0075
3,780,000
1
c
0-0018
0-0051
5,175,000
(
a
0-0044
0-0080
5,690,000
1:4 1 : 1-90: 2-10
12
b
0-0005
0-0025
4,065,000
{
c
0-0033
0-0061
4,380,000
1 : 2-25: 1-75
13 {
a
b
0-0006
0-0024
0-0017
0-0070
5,175,000
4,380,000
Watertightness. — Since the practical experience gained from
building concrete lighters proved these to be perfectly tight
laboratory tests of watertightness were only carried out for one
of the six concrete mixtures previously tested for strength, etc.,
namely, the mixture
1 cement : 1J fine aggregates : 2J coarse aggregate
Four plates 4 inches thick of slightly conical shape, average
diameter 8J inches, were tested.
(1) Head of water 20' 0" ; examination made after 5 days :
Test No. 1, under glass cover : no trace of moisture on surface.
2, no covering : a fine crack occurred around the
perimeter ; the surface appeared entirely dry.
(2) Head of water 40' 0" ; examination made after 3 days :
Test No. 1 : entirely dry.
2 : slight drops beginning to form around perimeter.
3 : entirely dry.
„ 4 : entirely dry.
(3) Leakage of water under 40' 0" head :
Between 3-7 days. Between 7-14 days.
Test No. 1 . 2 g. 126 g.
2 . . 72 g. Ill g.
3 . . 0 32 g.
400
SHIPBUILDING CONCRETE 135
The average leakage shown by all four tests during the last
week was 67 g. =0-19 cub. cm. per sq. cm. surface per week,
or in round figures, a 2 mm. layer of water per week.
Note. — The above water- pressure was equal to about three
times that on bottom of the standard size ships to be constructed.
The thickness of the concrete plates tested was only 4 inches,
while the thickness of bottom in ships of this size is generally
4J to 5 inches, of which the outside J inch is waterproof cement
mortar finish.
For these tests 1 per cent, of alum was dissolved in the water
used in making the concrete, but later experience has shown that
rich concretes (say 1 : 1-85 : 0-65), proportioned to obtain the
greatest density, and of proper consistency, are watertight under
moderate pressures without any artificial means of waterproofing.
Some of the much advertised compounds may help to make
lean concretes waterproof, but they nearly all reduce the
strength. To secure complete watertightness in ships a rich
mixture of concrete with an outside J inch finishing coat of
mortar is generally quite sufficient. In order to make still more
sure, and to prevent marine growths, concrete ships may be
painted below the water-line with hot coal-tar.
Contraction and Expansion. — Concretes expand with rise in
temperature and contract when the temperature is lowered.
The coefficient of expansion per degree F. is 0-000006 for a
mortar of mixture 1 : 2, and 0-00000677 for a concrete of mixture
about 1 : 1 \ : 3, according to experiments made at Cornell
University by Prof. A. P. Mills. The range of temperatures
was from 70° to 212° F. on specimens from one to eight
months old.
Tests show that the coefficient of expansion increases
slightly with richness of mixture. A fact of great importance is
that average concrete has almost exactly the same coefficient of
expansion as average steel (from 0-00000617 to 0-00000676).
Concretes expand also under moisture and contract when
dried or exposed in air after having been immersed in water ;
and this is true not only of the early hardening period, but even
after 20 years in service. Prof. A. H. White at the University
of Michigan (Proc. Am. Soc. Test. Mat., vols. xi. and xiv) found
that two briquettes I" X 1" X 4", of 1 : 3 mortar, expanded
0-05 per cent, in length in a 3-4 months' period when placed in
136 SEAGOING AND OTHER CONCRETE SHIPS
water ; they contracted in air at about the same speed. Other
tests with the same proportions, but other brands of cement,
showed greater changes in volume. A mortar stored in air
contracted about 1-10 per cent, during the first three months,
and a briquette of a rich mortar finishing coat from a side walk
20 years old expanded about 0-16 per cent, through being stored
for two years in water ; while a specimen from the gravel concrete
base of the same side walk expanded about 0-12 per cent, in the
same period.
The conclusions obtained from various tests are that concrete
drying out in air generally contracts from 0-02 to 0-05 per cent.,
and expands at least half this amount when immersed in water.
This means (assuming E = 2,000,000) that tensile stresses from
400 to 1,000 Ib. per sq. inch may occur in a concrete structure
restrained from freely contracting ; the concrete will then crack
and frequently does so. Difficulties from strains induced by
expansion are more rare and never cause failure in compression,
but at the worst a buckling action in large surfaces.
Shrinkage stresses in concrete, with resulting hair-cracks in
the surface, are at present seemingly unavoidable, but they can
be reduced in size to be quite harmless and of no importance.
The best means of accomplishing this are :
1. Light steel reinforcement (temperature bars) placed near
the surface to absorb internal stresses from expansion and con-
traction and distribute these so that no large cracks can occur.
2. The exterior mortar finish should not be too rich nor too
thick. It must adhere closely to the underlying concrete, which,
being protected against moisture and temperature variations,
changes less in volume.
3. The outside finish should not be trowelled too much, since
this brings the cement out and causes more hair-cracks in the
surface.
Trass Concrete. — The subject of using Trass l or other puzzo-
lanas as a partial substitute for Portland Cement in rich con-
cretes has not been sufficiently investigated to justify definite
conclusions. Most of the trass obtained in Europe comes from
Germany, and it is natural that investigations regarding the
material have been made there. If the advantages claimed by
1 Trass is finely ground Tufa (Trass-stone), containing chiefly silica and
some alumina. Used alone it has very little cementing power.
SHIPBUILDING CONCRETE
137
manufacturers of trass can be substantiated the material is of
considerable importance to the concrete shipbuilding of the
future. But it should be borne in mind that the Portland
Cement of to-day is of higher quality than that of about 20 years
ago, when some of the investigations were made. The tests
recorded in Table J were made by Herr Helbing at Essen in 1906.
Since the amount of water and method of mixing and placing
are not stated, the results are of uncertain value, and unfortun-
ately they deal only with trass mortars.
TABLE J.— COMPRESSIVE STRENGTH OF TRASS MORTARS
Proportions by Volume :
Compression, Ib. per sq. inch, average at
Cement, Trass, Sand.
14 days.
28 days.
100 days.
1 : 0-5 : 3-5
3,340
4,200
5,900
1:0-7:3
2,850
3,900
5,040
1:0-8:4
3,040
3,730
4,950
1:1:5
2,350
3,020
3,900
1:1:6
2,040
2,740
3,770
Note. — Since the tests were supervised by a Government
Engineer in connexion with the construction of municipal water-
works the results should be comparable with those required for
concrete used in actual land construction.
The tests recorded in Table K were carried out at the
Laboratory of the Technical High School at Berlin in 1910 with
trass from Andernach.
TABLE K.— COMPRESSIVE STRENGTH OF TRASS MORTARS
Proportions by Volume :
Compression, Ib. per sq. inch, average at
Cement, Trass, Sand.
14 days.
28 days.
3 months.
1 : 1
1 : 1
3
4
6,060
4,520
7,530
5,780
7,050
Note. — The figures stated are averages of 10 tests, the
majority of which are remarkably consistent. The average
ratios of tensile strength to compressive strength were :
;r at 14 days
13-1
1
28
3 months
138 SEAGOING AND OTHER CONCRETE SHIPS
The proportions of trass recommended are : 30 per cent,
trass -f 70 per cent. Portland Cement, and 40 per cent,
trass -+- 60 per cent. Portland Cement.
Apart from the lower cost, which may be doubtful in countries
where trass is not found and Portland Cement is manufactured,
the principal advantages claimed as the result of adding trass
to concrete are :
(1) Greater elasticity.
(2) Greater resisting power against action of sea- water.
(3) Lighter weight.
Definite information is not available on the first point. The
modulus of elasticity has not been ascertained, and the numerous
tests of tensile strength generally referred to in the German
statements give no proof of the amount of stretch, or elasticity, of
the mass. The results give only the resistance against stretch,
which is of small interest in reinforced concrete construction,
where all tensile stresses are assumed to be absorbed by the steel.
As regards the claim in respect of increased resistance to the
action of sea-water, there is probably some benefit from an
admixture with trass for lean concretes, especially with the Port-
land Cement of 20 years ago, that contained more free lime
which became chemically bound with the trass. In shipbuilding
concrete the use of trass should not be necessary.
The weight of ground trass is claimed by manufacturers to
be 40 per cent, less than that of Portland Cement. If an admix-
ture of 30-40 per cent, of trass is added to the Portland Cement
in shipbuilding concrete, there is a reduction of about 5 per cent,
in the weight of concrete.
Action of Sea-water.— So long ago as 1882 Dr. W. Michaellis,
of Berlin, waged a war against the German Cement Makers'
Association in favour of adding trass to Portland Cement, in
order, especially, to increase the resistance of concrete to the
action of sea- water. He submitted a paper on the subject to
the Institution of Civil Engineers (No. 2592, vol. cvii, session
1891-2, part No. 1) and made a comprehensive study of the
subject which has been of benefit to the manufacture of Portland
Cement. He claimed that the excess of lime in Portland Cement
which reacts with soluble sulphates in sea- water to form gypsum
SHIPBUILDING CONCRETE 139
should be prevented by providing trass as a suitable agent to
bind the free lime and form hydraulic mortar.
For many years the general question of the action of sea-
water has been much discussed in regard to concrete docks,
breakwaters, and harbour works in general. The quality of
concrete used in these structures is much inferior to shipbuilding
concrete ; the mixture is never richer than 1 part Portland
Cement : 6 parts Aggregate (1:2:4), the grading of fine and
coarse aggregate has hardly ever been done according to scientific
principles, nor was the importance of using a minimum of water
in mixing the concrete understood. Further, a considerable
amount of concrete construction for harbour works, etc , is
poured in situ, where below the water-line, and this prevents the
application of a protective covering of rich mortar.
Sea-water has a disintegrating action on poor concrete, but
even before disintegration takes place corrosion of the reinforce-
ment, shown by rust spots on the surface of the concrete, may
be observed. The rust spots are frequently followed by the
cracking, and displacement, of the surface concrete due to the
expansion of the reinforcement resulting from corrosion. If the
concrete is of poor quality a thickness of 1 J inches, or even more,
may be insufficient to protect the reinforcement against the
action of sea-water. But shipbuilding concrete can protect
the reinforcement with a thickness of one- half to three-quarters
of an inch.
In the shipbuilding concrete made by the author's firm the
aggregates were scientifically graded, the mixture was rich,
properly proportioned, of the right consistency, and carefully
placed. The concrete was therefore watertight, but for further
assurance it was protected with an outside mortar finish, carefully
placed, and inspected by sounding the entire surface with heavy
hammers before the ships were launched. Coal tar or anti-
fouling composition painted on the hulls went still further ta
make the hulls immune to the action of sea-water. And none
of the ships showed any sign of the action of sea-water on the
concrete.
Action of Oils, etc. — The conclusions reached with regard to
the action of sea- water on concrete apply also to the action of
oils, alkalies, acids, etc. : first-class concrete, such as shipbuilding
concrete, is not attacked appreciably by oils, etc., under ordinary
140 SEAGOING AND OTHER CONCRETE SHIPS
conditions, but a poor grade of concrete is attacked. But strong
acids which injure other materials, such as sulphuric and muriatic
acids, will also affect concrete, and in tanks to hold these acids
elastic and proof linings are necessary. Substances which
contain acids in diluted form, manure for example, may injuri-
ously affect green concrete, but not concrete that has hardened
and been properly cured. It has been proved by many years
of experience that concrete sewers are not seriously injured by
the action of sewage, which commonly contains diluted acids
and other active chemicals.
Petroleum and the heavier mineral oils used for fuel do not
injure concrete, but oils containing fatty acids produce injurious
effects by forming compounds of lime. For small tanks with
no great head of oil, and for reservoirs below ground level where
slight initial leakage is of minor importance, special oilproofing
is not necessary, provided the concrete is of first-class quality
and is properly reinforced so that cracks do not occur. Deposits
in the pores from heavy oils will after a few days make the
concrete oilproof for low pressures if it is not initially perfectly
tight. But even with rich mixtures such as 1 part cement to
2 1 or 3 parts aggregate a thin surface coat of 1 part cement
to 1J or 2 parts sand should be plastered on the inside to fill
crevices or irregularities from the forms.
Interesting tests were carried out by the U.S. Bureau of
Standards on a large number of small concrete tanks 15 inches
diameter by 16 inches high inside, with no oilproofing or finish.
A few tanks were covered and tested under a pressure head of
25 feet. Eleven kinds of mineral oils, varying from commercial
petrol to very viscous residual oil (paraffin), five vegetable oils
of different types, and two animal oils were used, during a period
of 13 months. During this time the penetration of the oils not
under pressure head into the concrete averaged about 0-6 inch.
Cylinders stored in the oils showed no appreciable diminution
in compressive strength, and only coco-nut oil and lard oil seemed
to attack the concrete surface appreciably. The tests with
25 feet head on the tanks showed that even under this condition
heavy- and medium-grade fuel oils can be stored in concrete
tanks without excessive loss. The concrete in the test tanks
was made with 1 part cement, f part sand, 1J parts small
gravel. The storage of kerosenes and gasolines under a con-
SHIPBUILDING CONCRETE 141
siderable head is not economical unless the concrete is oilproofed
beforehand.
For low pressures of only a few feet various types of coatings
can be applied with a brush to the concrete surface, such as :
Shellac Varnish,
Sodium Silicate (water-glass),
Magnesium Fluosilicate (MgSiFl6),
Spar Varnish.
The best results are obtained when the first coat is thinned
out, the second made somewhat thicker, and the third coat of
heavy consistency. A stiff brush should be used and the concrete
surface must be perfectly clean, dry, and free from cracks other
than unavoidable hair-cracks. The author has used shellac
varnish and sodium silicate ; while in America spar varnish and
magnesium fluosilicate have been tried with considerable success.
The latter is the main constituent of numerous liquid " hardeners "
for concrete floors, etc., which are sold under different trade
names. Magnesium fluosilicate fills the pores and neutralizes
free lime in the concrete which would otherwise attack the
film of oilproof coating.
A method of oilproofing which was used in the construction
of the oil-tankers for the Standard Oil Company described in
Chapter VI was developed by the author's brother, Mr. Hermann
Fougner. The method was found satisfactory for petrol under
a 20 feet head, and it will no doubt be satisfactory for heavier
oils under much larger heads. It consists in using a mixture of
finely pulverized iron, Portland Cement, and sand in the pro-
portions :
100 Ib. bag of pulverized iron.
1 bag of Portland Cement,
f cub. feet of sand.
To the water used for mixing one per cent, of ammonium
chloride should be added if the worker can endure the fumes
generated, for this addition accelerates the oxidation which is
the source of the oil- tightness. The concrete surface to be
treated must be thoroughly clean, moderately roughened with
a stiff wire brush, and made thoroughly moist. The mixture is
142 SEAGOING AND OTHER CONCRETE SHIPS
then hand-plastered in the usual manner. A finishing coat is
applied with a brush a few hours after the plastered coat has
set. For this purpose iron-powder with five per cent, of
ammonium chloride is mixed with water, the mixture being
made as stiff as can conveniently be handled, and being stirred
frequently so that the iron does not settle to the bottom. The
quality of the pulverized iron is of great importance. The
material should be made from pure ingredients and not from
scraps containing dirt, oil, etc. ; the fineness should be such
that the material will pass a No. 100 sieve.
With regard to this method of oilproofing, the Head of the
Marine Department of the Standard Oil Co. reported on 8th June
1920 as follows :
" The oilproofing in the tanks of our concrete barges has
been satisfactory, except that on the overhead surfaces it
flakes off, and a better adhesive substance would be an im-
provement."
The flaking- off overhead was probably due in part to the
steaming out of the tanks with live steam, a procedure which is
necessary before workmen may enter oil tanks. The defect can
be remedied by using one of the other methods for the oilproofing
of the overhead surfaces, assuming that it is necessary to treat
these surfaces.
Repairs. — The simplicity of repairs is one of the great advan-
tages of concrete ships. Minor repairs can frequently be carried
out at sea by the crew ; and every concrete ship should, there-
fore, carry a small supply of materials for the purpose, such as :
2 bags of Portland Cement.
4 ,, coarse, clean sand,
4 Ib. of alum.
\ gall, water-glass (sodium silicate).
12 \ inch diam. round steel rods 6 feet long.
*••* A ,, 55 55 55 55
The cement must be stored in a dry place or kept in an air-
tight tin.
Penetration of Moisture can be remedied by brushing the face
exposed to water-pressure with a hot 5 per cent, solution of
soft soap. When this has dried a warm 5 per cent, solution of
SHIPBUILDING CONCRETE 143
alum is applied in the same way. The treatment should be
repeated two or three times.
Leakage through a small crack or hole can be stopped by filling
the crack or hole with neat cement mixed with water-glass.
The mixture should be stiff, and must be held in position during
the setting by centring ; the mixture hardens very rapidly.
The hole must be thoroughly cleaned before being filled.
Larger damage — for example, from grounding or collision —
may be repaired while the ship is floating if above the water-line,
otherwise the work must be done in dry dock or on a suitable
beach. All fragments of the crushed concrete must be removed
and cut away, so that the entire circumference is free from cracks
or loose pieces. The edge of the hole must be made rough and
irregular to allow of a good joint being made with the new con-
crete and may widen slightly outwards. If the reinforcement
is bent, it should be straightened back into position or extra
steel put in. Broken rods can be spliced by placing new ones
alongside, arranging an overlap of 15 diameters on each side of
the break, with hooks of five diameters on the ends of the rods.
The entire circumference of the hole must be thoroughly cleaned
with a stiff wire brush. Centring must be placed against one
side ; this may be held in position by wires attached to the rein-
forcement. The concrete should be mixed with 1 part Portland
Cement and 1J parts coarse, well-graded Sand (up to J in. size).
Alum to the amount of two per cent, should be mixed in the
water before adding this to the Cement and Sand previously
mixed dry. The concrete may be placed by careful ramming
and placing boards in front as the hole fills up, or by throwing
the concrete on in layers of plaster. The filling method is best
for all thicknesses above 2J inches. The perimeter of the hole
must be thoroughly wetted by alum water mixed with neat
cement immediately before the concrete is placed. The forms
can be removed after two or three days, but if considerable
water-pressure is exerted against the repaired portion the inside
forms should remain in position for eight days, or even longer
in cold weather, and should be well braced. During frost
the concrete materials should be heated and prevented from
freezing for at least 48 hours. The new concrete must be kept
moist for at least 4 or 5 days. If necessary, the outside face
can be coated with coal tar or an antif ouling composition two
144 SEAGOING AND OTHER CONCRETE SHIPS
days after pouring, but it is preferable to wait a few days
longer until the surface is dry.
Fire-resisting Power. — In connexion with a proposed oil-
storage tank which was designed by the author for Singapore,
FIG. 44. — Concrete Tank containing burning oil. Singapore, 1912.
an experiment on the fire-resisting power of concrete was made
for the satisfaction of the municipal authorities.
A tank 6 feet by 6 feet by 6 feet was constructed, the sides
and bottom being of 2 J inch concrete plastered on metal sheeting.
Into this were poured 500 gallons of petroleum which was
ignited by a ball of waste soaked in benzine. The flames burst
about 30 feet into the air with an explosion, and a roaring fire
SHIPBUILDING CONCRETE 145
kept blazing for four hours. The tank became extremely hot,
but stood up perfectly to the pressure of water from a fire hose
playing full force against the sides. The internal coats of cement
mortar flaked off at the top during the conflagration, and cracks
were caused when the hot walls were suddenly cooled off by
water from the hose. But no burning oil escaped from the tank,
and the damage was repaired at the trifling cost of ten dollars.
10
CHAPTER X
STEEL REINFORCEMENT
Types— Quality — High-Carbon Steel .
Types. — In ordinary land construction the sectional area of the
steel reinforcement amounts to about 0-5 to 1-0 per cent, of the
sectional area of the concrete section, although in special cases
the higher figure may be exceeded. In seagoing concrete ships
the percentage of the sectional area occupied by reinforcement
amounts to 4-5 — 5-5 per cent., or even more. In other words,
about seven times as much steel is embedded in the hull of a
concrete ship as there would be if the same amount of concrete
were used in construction on land. Such a proportion of steel
is too high and should be reduced considerably, both for
economical and practical reasons.
Bars of round, square, triangular, octagonal, or almost any
other section are used ; they may be twisted or provided with
lugs or indentations to ensure better bond with the concrete.
Some bars have stirrups attached, either shorn directly out of
flanges in the section or by some other patent arrangement. All
manufacturers claim special advantages for their proprietary
types, but as a rule there is very little difference between their
merits. Reinforcement is also made in sheets, either from solid
steel plates which are perforated and expanded, or by weaving
light rods and wires into a fabric.
The present types of reinforcement are not well adapted for
shipbuilding. All expanded metals, wire mesh, or other sheet
reinforcements are too light in section and cannot be used with
economy ; and the employment of several layers is not advisable,
since the flow of the concrete round, and through, the reinforce-
ment would be seriously obstructed. Bars with rigidly attached
stirrups also obstruct the flow of the concrete. Round rods
are used for sizes below J inch diameter, and square, octagonal,
or bars of other sections are used for the larger sizes up to
1J inch diameter, or side dimension.
Costs being equal, the author prefers a type of octagonal
bar with cross ribs, because the quality has always been satis-
146
STEEL REINFORCEMENT
147
factory ; this type of bar bends easily cold, without warping or
springing out of place as square bars are apt to do — for example,
in the bilges before concreting. Square bars have larger sectional
area than round rods of the same dimension, so that more steel
can be placed in narrow frames by using such bars than by
using round bars, and they have the advantage that they are
more rigid and easier to keep in position than round bars, so
permitting workmen to climb about the reinforcement without
disturbing it ; but they have the disadvantage that concrete
does not flow easily round them. There is no object in using
deformed bars of less than J inch size, because the lugs or inden-
tations become so small as to have no practical value.
Quality. — The steel generally used for the reinforcement of
concrete ships is the mild, medium, open hearth material used for
the construction of steel ships. Such material must have the
properties required to pass, for example, the tests laid down by
Lloyd's Register and Norwegian Veritas as follows :
Tensile breaking strength 28 to 32 tons per sq. inch.
Elongation of at least 20 per cent, on a test piece 8 inches long.
Bending the test piece cold through 180 degrees without
fracture, the internal radius being 1J times the thickness of
the test piece.
By way of comparison, extracts from the " Standard Specifi-
cations for Billet-Steel Concrete Reinforcement Bars " of the
American Society for Testing Materials are given below :
Structural Grade.
Intermediate Grade.
Hard Grade.
Tensile strength, Ib. per sq.
inch ....
Yield point, Ib. per sq. inch,
at least ....
Elongation, in 8 inches, per
cent., at least .
Bending cold around a pin
without cracking on the out-
side of the bent portion:
Under £ inch diam.
f inch or over
55,000 to 70,000
33,000
1,400,000
70,000 to 85,000
40,000
1,300,000
80,000
50,000
1,200,000
Ten. str.
180 deg.
d = t
180 deg.
d = t
Ten. str.
180 deg.
d = 2t
90 deg.
d = 2t
Ten. str.
180 deg.
d = 3t
90 deg
d = 3*
d = diameter of pin about which the specimen is bent.
t = thickness, or diameter, of specimen.
For bars over £ inch in thickness or diameter a deduction of 1 from the
percentages of elongation shall be made for each increase of ^ inch in thickness
or diameter above f inch.
148 SEAGOING AND OTHER CONCRETE SHIPS
All steel must be free from paint, oil, heavy rust, or mill scale.
A slight film of rust is not objectionable.
High-Carbon Steel. — In comparing the requirements of Lloyd's
Register with the specification of " Hard " Billet- Steel Rein-
forcement Bars, it will be observed that the " Hard " steel has
considerably greater tensile strength but less elasticity against
cold bending than the shipbuilding material. The difference in
test requirements arises from the difference in the conditions
under which the materials do their work. The reinforcement
in concrete construction, whether on land or afloat, is protected
against shocks and blows ; and the forces acting on it cause
tension, but neither torsion nor bending. Practically every
kind of stress is set up in the material of a ship, and, in addition,
the material must be able to withstand the severe treatment it
receives during its preparation in the shipyard. Consideration
of these differences in conditions would seem to indicate that it
is possible to use a higher grade of steel for reinforcement than
for the construction of steel ships. But the higher grades of
steel have practically the same modulus of elasticity as mild
steel ; and equality in modulus of elasticity involves equality
in " stretch," or deformation, at a given stress. The fact that
high-grade and mild steel will stretch to the same extent at the
same stress is equivalent to the fact that the increased working
stress permissible with high-grade steel involves increased
" stretch " as compared with mild steel. And the increased
" stretch " consequent upon the adoption of an increased working
stress involves an increased possibility of cracks in the concrete.
Thus it is neither breaking strength, nor yield point, nor elastic
limit, that determines the value of a steel as reinforcement ; it
is the modulus of elasticity, or, using the reciprocal expression,
it is the Coefficient of Elongation, that is the determining quality.
A high-grade steel with a high modulus of elasticity would
be specially desirable for the reinforcement of concrete ships,
since the permissible increase in working stress would involve
a reduction in the weight of reinforcement. Such a material
cannot, however, be made at present. Alternatively, a concrete
with a lower modulus of elasticity, that is, a larger coefficient
of elongation, will allow the great strength of high- carbon steel
to be utilized to full advantage. But this material is not obtain-
able either.
STEEL REINFORCEMENT 149
Some engineers object to the high-carbon steel on account of
possible irregularity in quality ; but strict inspection and careful
manufacture can eliminate that cause of complaint, particularly
in the case of steel for reinforcing bars, since this is rolled in
small sections which are readily cooled. It may be mentioned
that a high- carbon steel containing 0-56 to 0-60 per cent, carbon
is used in the United States for the manufacture of locomotive
tires.
CHAPTER XI
CONDITIONS GOVERNING STRUCTURAL DESIGN
Theory of Design — Side Frames — Bottom Frames — Centre Keelson —
Longitudinal Strength — Strength of Shell Slab — Watertight Bulkheads —
Norwegian Government Requirements — Deflection Test on Lighter.
THE actual strength calculations prepared by the author for the
Askelad are reproduced in the Appendix. For the purpose of
indicating the conditions governing the design of the structural
members these calculations are discussed in the following pages,
comments being made on each item in the calculations in turn.
A discussion of the forces acting on the structure of a ship
is outside the scope of this book ; so is a lengthy discussion of
the stresses in reinforced concrete structures whether on land
or afloat. To the technical reader, well versed in the theory
of reinforced concrete construction, who desires to study the
problems involved in the consideration of the strength of ships
the author strongly recommends the article on " The Theory
and Design of British Shipbuilding," by Mr. A. L. Ayre, published,
in British Shipbuilding, by the Syren and Shipping, Limited,
London. In seventeen brief chapters Mr. Ayre has condensed
in a very lucid and admirable manner all the essential theories
of general naval architecture. To the naval architect or ship-
builder who desires to study the theory of reinforced concrete
construction the author recommends the Concrete Engineer's
Handbook, by Hool and Johnson, published by the McGraw-Hill
Book Company, Inc., of New York and London. An authorita-
tive statement on the theory and design of reinforced concrete
construction is the " Final Report of the Joint Committee on
Concrete and Reinforced Concrete," which expresses the opinions
of the affiliated committees of the American Society of Civil
Engineers ; American Society for Testing Materials ; American
Railway Engineering Association ; Portland Cement Association ;
and the American Concrete Institute, during the period from
150
CONDITIONS GOVEENING STRUCTURAL DESIGN 151
1903 to 1916, when the final Report was adopted by the Com-
mittee. The Report is published in the Transactions of the
American Society of Civil Engineers, vol. Ixxxi, December 1917.
On the special subject of Shipbuilding Concrete there is no
literature so far, but the usual theory of reinforced concrete is
applied with working stresses modified to suit the materials and
conditions.
Theory of Design. — The flexure formula generally used for
reinforced concrete beams (slabs) is based on the " Straight
Line " theory, and corresponds with the accepted theory of flexure
as applied to other materials. It is based on the following
assumptions :
1. A plane section before bending remains plane after bending.
2. Adhesion between the concrete and its reinforcement is
perfect ; the materials are therefore stressed in compression in
proportion to their moduli of elasticity.
3. The modulus of elasticity of concrete in compression is
constant.
4. Tensile stresses in the concrete are neglected.
5. There are no initial stresses in the materials.
A. RECTANGULAR BEAMS WITH SINGLE REINFORCEMENT
Standard notations, see Diagram A.
fs — tensile unit stress in steel ;
fc = compressive unit stress in concrete ;
Es = modulus of elasticity of steel ;
Ec = modulus of elasticity of concrete ;
M = moment of resistance, or bending moment in general ;
A, = steel area ;
b = breadth of beam ;
d = depth of beam to centre of steel ;
Jc = ratio of depth to neutral axis to depth d ;
z = depth below top to resultant of compressive stresses ;
j = ratio of lever arm of resisting couple to depth d ;
jd = d-z = arm of resisting couple ;
A
p = steel ratio = -4-
152 SEAGOING AND OTHER CONCRETE SHIPS
The total compression in the section must equal the total
tension ; hence :
%fjcdb = pbdfs (1)
According to the first assumption above :
f° = * . (2)
/ *»n lf\ '
Is n(L K)
Combining (1) and (2) gives the balanced ratio of steel,
; or : p = J -r-r^ , ... (3)
DIAGRAM A. — ^Rectangular Beams with Single Reinforcement.
Again combining equations (1) and (2),
±Jc* = n(l — k)p, whence
k = \/2pn
The stress curve being a straight line, the resultant of the
compressive stresses must be located $lcd above the neutral
axis. Therefore the arm of the resisting couple is,
7 = 1-P ....... (5)
Taking moments about the centre of tension in the steel,
2M
jlcbd'
(6)
(7)
CONDITIONS GOVERNING STRUCTURAL DESIGN 153
Taking moments about the centre of compression in the
concrete,
........ (8)
jdA. jd*bp
(9)
The above equations express all relations between the
stresses in beams and slabs of rectangular section with single
reinforcement.
In practical design the equations are simplified by inserting
the values of n, fs) and fc which have been found by tests of
the materials. They determine the maximum ratio of steel and
position of the neutral axis (equations (3) and (4)).
For example :
Maximum working stresses shall not exceed :
/, = 16,000 Ib. per sq. in.
fc = 800 Ib. per sq. in.
n = 15
P = * ,,— /^ x = 0-0107 (3)
1)
16000 /I 6000
800 \800.15
. 0-0107 . 15 -f- (0-0107 . 15)2 — 0-0107 . 15 = 0-429
j = 1 — i . 0-429 == 0-857
M = 0-857dAs16000 = 13712dAs ....... (8)
In reinforced concrete design the problem is usually to find
the amount of steel required in the beam or slab, and for this
purpose equation (8) is the most practical, with one important
proviso : that the ratio of steel must not exceed the value determined
by equation (3), as otherwise higher compressive stresses than the
permissible maximum will occur in the concrete. That is to say
(continuing the previous example) :
A
p = ~ must not exceed 0-0107.
In other words : A3 must not exceed 1-07 per cent, of (bd).
From the above it is clear that the moment of resistance of
the beam according to equation (8) depends on the factor j,
depth of beam d} area of steel As, and the allowable working
154 SEAGOING AND OTHER CONCRETE SHIPS
stress in the steel fs. If special conditions make it desirable
to find the moment of resistance based on the compression of
the concrete, equation (6) gives the following value (continuing
the same example) :
M _ j . = Q857
M = Ulbd2 ...... (6)
By equalizing the moments of resistance calculated from the
tension in the steel (8) and the compression in the concrete (6),
the above-mentioned steel ratio (0-0107) appears :
= 13712dAs
A =
For all lower ratios of steel the values of the factor j are
greater. It is therefore a very safe assumption to reduce equa-
tion (8) to the simple formula M = 13712dAs in the example.
B. BEAMS WITH DOUBLE REINFORCEMENT
The amount of steel sometimes required in the top of isolated
beams to help the concrete in compression can be determined
by a practical, accurate, and simple method, which obviates the
use of complicated formulae.
Assume a maximum, allowable stress on the concrete of
800 Ib. per sq. inch as in the previous example.
The top steel must be covered with concrete, and is placed,
say, 1 inch below the extreme fibre. Compression here is, for
instance, 700 Ib. per sq. inch. As n is equal to 15, the com-
pression in the steel will be about 15 . 700 = 10,500 Ib. per
sq. inch.
This means that for every square inch of tensile steel in
excess of the balanced or economic ratio (0-0107 or 1-07 per cent.)
there must in isolated beams be provided about 1-5 sq. in. com-
pressive steel in the top (vrr^xx = 1*51.
As this steel is always placed above the resultant of com-
pressive stresses in the simple beam, the factor / tends to
increase, and equation (8) can be used with perfect safety.
CONDITIONS GOVERNING STRUCTURAL DESIGN 155
The formulae recommended by the Joint Committee are
A' = area of compressive steel ;
p' = steel ratio for compressive steel ;
/', = compressive unit stress in steel ;
C = total compressive stress in concrete ;
C' = total compressive stress in steel ;
d' = depth of centre of compressive steel ;
z = depth of resultant of C and C'.
DIAGRAM B. — Beams with Double Reinforcement.
Position of neutral axis,
k = V 2n(p + p'^-j + n2(p + p')2 — w(» + »')
V » /
Position of resultant compression,
z =
Arm of resisting couple,
jd = d — z
Fibre stresses,
6M
Ic —
U*
M
Wnf* d'\ /, d'\\
kV ~ d) I1 " j)J
1° ~ pjbd* ~ n1*
i. d/
d
f'8 = nfc-j-
1 -k
. (9)
(10)
(11)
(12)
156 SEAGOING AND OTHER CONCRETE SHIPS
C. T-BEAMS
b = width of flange ;
b' = width of stem ;
t = thickness of flange.
K" ~ D *~ ~~ "~ — H * "H» **
1
*••
ft
' " * 1 *
lui Vj
i *^ /f (+
*-J
>rx
jd
=— LT
o
DIAGRAM C. — T-Beams.
Case I. When the neutral axis lies in the flange, use the
formulae for rectangular beams.
Case II. When the neutral axis lies in the stem.
The following formulae neglect the compression in the stem.
Position of neutral axis,
2ndA8 + bt*
~ 2nA8 + 2bt
Position of resultant compression,
2t t
z =
2kd — t 3
Arm of resisting couple,
jd = d — z .
Fibre stresses,
A,jd
(15)
(16)
(17)
(18)
fc =
Wed
bt (led - JO jd" n l—k
(For approximate results, the formulae for rectangular beams
may be used.)
The following formulae take into account the compression in
CONDITIONS GOVEKNING STRUCTURAL DESIGN 157
the stem ; they are recommended where the flange is small
compared with the stem :
Position of neutral axis,
M= v -— • ±2 - b )* + (nA* + <6
- b')t\*
'~ /
\ b'
— nAs -f (6 — &')Z
Position of resultant compression,
- !O& + [(*d — ty(t H
*(2feJ — Q6 + (JW — ^)26'
Arm of resisting couple,
jd = d — z (22)
Fibre stresses,
/8=A-^ (23)
, = 2MW ,2.
'• [(2M - t)bt + (kd- t)'b'}jd
D. SHEAR, BOND, AND WEB REINFORCEMENT
V = total shear ;
V' = total shear producing stress in reinforcement ;
v = shearing unit stress ;
u = bond stress per unit area of bar ;
o = circumference or perimeter of bar ;
2o = sum of the perimeters of all bars ;
T = total stress in single reinforcing member ;
s = horizontal spacing of reinforcing members.
For rectangular beams,
(26)
(For approximate results / may be taken at J.)
The stresses in web reinforcement may be estimated by means
of the following formulae :
Vertical web reinforcement.
T = (27)
158 SEAGOING AND OTHER CONCRETE SHIPS
Bars bent up at angles between 20 and 45 deg., with the hori-
zontal and web members inclined at 45 deg.,
Ve
T = i.~ ..... .. (28)
jd
In the text of the Joint Committee's Report it is recom-
mended that two-thirds of the external vertical shear (total
shear) at any section be taken as the amount of total shear
producing stress in the web reinforcement. V therefore equals
two-thirds of V.
The same formulae apply to beams reinforced for compression
as regards shear and bond stress for tensile steel.
For T-beams,
(30)
(For approximate results j may be taken at J.)
E. COLUMNS
A = total net area ;
A, = area of longitudinal steel ;
Ac = area of concrete ;
P = total safe load.
Total safe load,
P=/.(A, + «AJ=/^[l+(»-l)Pl] . . (31)
Unit stresses,
p
/c = A[l + (n- l)p]
fs = nfc ........ (33)
Side Frames. — From the rules of the Norwegian Veritas it
was found that for a ship of the dimensions of the Askdad the
frames between the stern post and 20 per cent, of the length
from the stern would be 1" X 3" X 0-44" bulb angles, spaced
23" apart, attached to a shell 0-40" thick. The arrangement of
a frame and a strip of shell plating one-frame space wide is shown
on p. 3 of the calculations. For this frame girder the moment
of inertia was calculated as shown, and it was found that,
assuming a working stress on the steel of 15,000 Ib. per square
CONDITIONS GOVERNING STRUCTURAL DESIGN 159
inch, the frame girder was capable of resisting a bending moment
of 86,000 inch-lb. per foot of length of ship. For the concrete
ship the frames were to be spaced 4' 0" apart, whence the bending
moment would be 344,000 inch-lb. ; adding to this the 20 per
cent, required by the Norwegian Government the bending moment
to be resisted by the concrete frame became 412,800 inch-lb.
The concrete frame varied in depth from 17" at the heel to 13"
near the deck, and the " effective depth " was taken to be 0-84
of the actual depth. From these figures and the bending moment
to be resisted it was found that, assuming a working stress of
15,000 Ib. per square inch, the area of steel required was
2-46 square inches, and this was provided by two 1" rib bars and
one f" rib bar.
From the bending moment the shearing force was estimated
in the manner shown in the calculations ; and it was found to
amount to 19,660 Ib. The average section of the concrete frame
measured 15" X 6J", whence the shear stress on the concrete
was found to be 195 Ib. per square inch.
The frames from 20 per cent, of the ship's length from the
stern to the collision bulkhead in as teel ship to Norwegian
Veritas rules were found to be 7J" X 3" X 0-44" bulb angles,
23" apart. From the strength of such a frame, and making the
required 20 per cent, addition, it was found that the bending
moment to be resisted by the concrete frame at 4' 0" spacing was
456,000 inch-lb. This bending moment requires 2-50 square
inches of steel in a concrete girder whose average section is
16" x 6J" ; and the required amount of steel was provided by
the adoption of the same reinforcement as in the other side
frames.
Bottom Frames. — For this type of steel ship built to Nor-
wegian Veritas rules the bottom frames, or floors, would be
0-38" plate, with a 4J" X 3" X 0-38" angle at top and bottom,
and a 0-42" shell. The arrangement of the material is shown
on p. 4 of the calculations. For this girder the permissible
bending moment per foot of length was found to be 664,000
inch-lb., whence the bending moment for the concrete floors at
a spacing of 4' 0" was found to be 3,187,200 inch-lb.
This bending moment was found to require the provision of
9 square inches of steel in the top of the floor beams, which were
28" deep by 10" broad ; the necessary material was provided
160 SEAGOING AND OTHER CONCRETE SHIPS
in nine I" rib bars. The compression at the bottom of the
floor is resisted by the lower part of the concrete beams and by
the concrete shell slab, which was designed to be 4" thick. It
was found that the sectional area of concrete provided was
capable of resisting a bending moment of 3,300,000 inch-lb.,
using a working stress of 800 Ib. per square inch.
The foregoing consideration is based on the assumption that
the bending moment on the floor is such as to cause tension in
the upper material. But this is not always the case. When
there is a full load of cargo in the holds and there is a wave trough
at the midship portion of the ship the bending moment may be
such as to cause tension in the bottom of the floor. This possi-
bility was met by the provision of about 4 square inches of
steel in the bottom of the floor ; and such an area of steel, with
the depth of floor adopted, was found to be capable of resisting
a bending moment of 1,270,000 inch-lb. A bending moment
of 1,270,000 inch-lb. would be set up by a pressure of about
300 Ib. per square foot acting downwards on the bottom.
When the holds are full the minimum water- pressure would occur
in way of the trough of a wave, and would amount to about
700 Ib. per square foot, namely, that corresponding to about
an 11 feet "head." Hence to produce a downward pressure
of 300 Ib. per square foot the cargo load would need to amount
to 1,000 Ib. per square foot ; and such a load could be produced
only by a cargo weighing about 60 Ib. per cubic foot. But the
ship would be immersed to her load draught if completely filled
with a cargo weighing about 50 Ib. per cubic foot. Hence the
downward pressure of 300 Ib. per square foot is greater than
is likely to be found in practice, and so the floor as designed is
amply strong.
At this point it may be desirable to point out that in many
elements of a ship structure it is necessary to provide material
to resist tension at both sides of the cross-section ; the tension
sides and compression sides are not separate and distinct. This
fact explains in great measure the higher percentage of steel
used in the construction of seagoing concrete ships than in
construction on land.
Centre Keelson. — This element of the structure was treated
in exactly the manner outlined above for the side and bottom
frames, and so comment is not necessary.
CONDITIONS GOVERNING STRUCTURAL DESIGN 161
Longitudinal Strength. — As far as the strength of a ship as
a whole is concerned, the worst possible cases occur when the
ship is fully loaded. There are two " worst possible " cases. In
both, the ship is assumed to be sailing at right angles to waves
of her own length. In one case there is a crest of a wave at
amidships and a trough at each end ; the concentration of
support amidships and the diminution of support at the ends
cause the ends of the ship to droop relatively to the middle
portion and set up tension in the deck. The ship is then said
to be " hogging." In the other case there is a wave crest at
each end and a wave trough amidships ; the excess of support
at the ends and the defect of support amidships cause the middle
portion of the ship to droop relatively to the ends and set up
tension in the bottom shell. The ship is then said to be " sagging."
The two conditions are illustrated on pp. 205 and 206 of the calcu-
lations in the Appendix.
For any ship the distribution of total weight can be calcu-
lated and plotted on a diagram. Such a " weight " curve is
best plotted as the summation of the weight curves for all the
different elements which make up the total weight ; tor example,
hull, machinery, fittings, etc. Similarly the distribution of
support can be plotted. The support at any point along the
length of the ship is measured by the immersed cross-sectional
area of the ship at the point. If the curves of weight and
support are plotted on the same base-line and to the same scale,
there will be at practically every point along the base-line two
ordinates, one representing weight and one representing sup-
port. The difference between the two ordinates at any point is
the difference between weight and support, and represents
the unbalanced force, or " load," acting at the point. If the
differences between weight and support are plotted with
reference to a straight base-line the result is called a " curve
of loads." At some points weight is in excess of support, and
at others the reverse is the case ; accordingly at some points
the " load " is downwards, at others it is upwards. Curves of
weight, support, and loads are shown on pp. 205 and 206 of the
Appendix.
Graphic integration of the curve of loads — in other words,
graphic integration of the vertical forces acting on the structure
of a ship — gives as its result the curve of shearing for the structure
11
162 SEAGOING AND OTHER CONCRETE SHIPS
of the ship. And graphic integration of a curve of shearing
force gives the associated curve of bending moment.
Curves of shearing force and bending moment for the Askelad
in the " hogging " and " sagging " conditions are given on pp. 205
and 206 of the Appendix. The maximum values of the bending
moment are, respectively, 2,060 foot-tons and 6,600 foot-tons.
The bending moment acting on a ship is, of course, a function
of displacement, of weight, and length ; and it is often expressed
B.M. = 4*±
0
where A = displacement,
L = length, .
C = a coefficient between about 25 and 35 for
ordinary steel merchant ships with engines
amidships.
For the Askelad the bending moments as calculated were found
to correspond respectively to — - — and — - — . Similar cal-
143 49
culations in the case of the Namsenfjord gave, for a displacement
of 340 tons, bending moments of 140 foot-tons and 715 foot-tons
for the "hogging" and "sagging" conditions respectively;
these correspond to — and — — — - respectively.
But the bending moments found from actual calculations
were not used for the determination of the amount of steel in the
cross-section of the Askelad. This was due to the fact that for
a ship whose design was prepared previous to that of the Askelad
the Norwegian Veritas had suggested as the standard of longi-
tudinal strength the strength of a steel ship of equal dimensions,
assuming a working stress on the material of 13 tons per
A y T
square inch ; but a bending moment expressed by J was
\.2i
given as an absolute maximum. In the case of the Askelad the
maximum bending moment referred to by Norwegian Veritas
was taken as the standard bending moment for which pro-
vision had to be made ; this bending moment amounted to
1735 X 17° . 24,570 foot-tons.
12
The stress calculations for the midship section are given on
CONDITIONS GOVERNING STRUCTURAL DESIGN 163
p. 204 of the Appendix ; and it is shown that the chosen standard
bending moment could be resisted with the steel stressed to
12-5 tons per square inch, that is, with the steel working at a
lower stress than would have been permitted by the Norwegian
Veritas.
The calculations for moments of inertia of cross-section of
ships are made " on a steel basis " ; in other words, the sectional
areas of concrete-resisting compression are expressed in equivalent
areas of steel. For example, consider Item 1 in the calculations
(p. 204 of Appendix). From the sketch at the left of the calcu-
lations it is seen that Item 1 is the top of the hatch coaming.
In the " hogging " condition the material at the top of the hatch
coaming is in tension ; hence in the calculation for " hogging "
Item 1 is represented by 12 square inches, the area of the rein-
forcement at the top of the hatch coaming. In the " sagging "
condition the material at the top of the hatch coaming is in
compression ; hence in this case the concrete must also be taken
into account, not the steel alone. The area of the steel is 12
square inches. The gross area of concrete is 108 square inches ;
hence the net area of concrete is 96 square inches. The ratio
modulus of elasticity of steel
modulus of elasticity of concrete
was taken to be 15 ; in other words, for a given strain the
stress on the steel was taken to be 15 times the stress on
the adjoining concrete, or the load borne by the steel was
15 times the load borne by an equal area of concrete at the
same place. On this basis the 96 square inches of concrete is
equivalent to 6-4 square inches of steel. And so for Item 1
in the " sagging " calculations the effective area is 6-4 square
inches for the concrete expressed in its equivalent area of steel
plus 12 square inches for the actual steel, making 18-4 square
inches in all. Items 1-4 in the " sagging " calculations and
Items 5-9 in the " hogging" calculations are treated in this way,
the net areas of concrete being converted to equivalent areas of
steel, and these equivalent areas added to the actual areas of
steel.
Strength of Shell Slab. — In designing the Askelad the rein-
forcement in the bottom slab was made adequate to carry the
water- pressure due to a draught of 15' 3" when stressed to
164 SEAGOING AND OTHER CONCRETE SHIPS
5,400 Ib. per square inch. But it must be borne in mind that
there is a tension stress in the reinforcement in the bottom
slabs when the ship is " sagging " ; and the tension stress due to
" sagging " must be added to the tension stress due to water-
pressure. Hence the reason for the low working stress on the
bottom reinforcement when considered from the point of view
of water-pressure only.
The reinforcement in the side slabs was provided on a similar
basis to that in the bottom slabs, but the working stress on the
steel was increased to 6,500 Ib. per square inch. The increased
working stress is consistent with the fact that the stresses due
to " sagging " are not so severe in sides as in bottom.
Watertight Bulkheads. — When designing the Askelad the
peak bulkheads were made capable of withstanding a pressure
due to a " head " of water to the load line at working stresses
of 15,000 Ib. per square inch for steel and 800 Ib. per square
inch for concrete ; for the other bulkheads the same " head " of
water was adopted, but the working stresses were increased to
29,000 Ib. per square inch and 1,600 Ib. per square inch respec-
tively. In designing a bulkhead provision must be made against
the possibility of water-pressure on either side. Hence there
must be reinforcement near both surfaces.
Deck Beams, etc. — In designing the deck beams the method
of comparison with the requirements for a steel ship was adopted ;
the actual calculations were made in exactly the manner outlined
above for the side frames. When designing the hatch coamings
it was assumed that the load from the deck and from the hatch
covers amounted to 168 Ib. per square foot. In the case of the
Namsenfjord the deck beams and slabs were designed to with-
stand a loading of 250 Ib. per square foot.
Norwegian Government Requirements. — In May 1916 the
author's firm received an order from the Sydvaranger Mining
Company for an ore-carrying ship of 2,700 tons deadweight
capacity. In view of the fact that the author's firm had only
begun the construction of concrete lighters the action of the
Mining Company indicated their great faith in the new method
of construction. The ship was not completed, various causes
having led to the suspension of the contract. But in virtue of
the discussions which the design of the ship called for with the
Director of Shipping, with the Technical Committee appointed
CONDITIONS GOVERNING STRUCTURAL DESIGN 165
by the Department of Shipping, and with the Norwegian Veritas,
the design contributed appreciably to the progress of concrete
shipbuilding in Norway.
The preliminary requirements of the Technical Committee
were, briefly :
The strength of any proposed concrete ship must be calcu-
lated relatively to that of a steel ship of the same dimensions.
Calculations of strength must be submitted for approval,
together with detailed plans of the concrete ship and of the
equivalent steel ship, the latter having been submitted to, and
approved by, the Norwegian Veritas ; the calculations of strength
for the steel ship must also be submitted.
It may be assumed that a steel ship can stand a stress of
13 tons per square inch without change of shape, and from this
assumption the bending moments, etc., on the elements of the
structure can be determined. For the concrete ship the appli-
cations of the bending moments, etc., so determined must not
cause tensile stresses beyond the elastic limit of the steel, nor
compressive stresses greater than 55 per cent, of the crushing
strength of the concrete.
The bending moments at amidships as determined in the
manner outlined above are to be assumed constant over 40 per
cent, of the length amidships, and are then to be uniformly
reduced to zero at the ends. But a bending moment amounting
A x L
to - — - — may be taken to be the maximum possible value,
\.2i
even if calculations made for a steel ship show a higher value.
The shear strength of elements of the structure of a concrete
ship must be equal to the shear strength of the corresponding
elements of the structure of a steel ship. For example, the
shear strength of the shell slabs must be equal to the shear
strength of the single or double-riveted edge landings of the
equivalent steel ship. Similarly the shear strength of the
joint between frame and shell slab must be equal to the shear
strength of the rivets joining frame and shell plating in a steel
ship, allowance being made for the larger frame spacing in the
concrete ship.
The maximum bending moments found for frames and beams,
etc., must be assumed to act at any point in the frame, beam,
etc , and in either direction.
166 SEAGOING AND OTHER CONCRETE SHIPS
There were requirements also in regard to quality of steel
and cement and tests of concrete ; but these are not of importance
in the present consideration. The requirements correspond in
principle to the author's methods of calculating seagoing concrete
ships as submitted to the Director of Shipping the previous year.
Dsflection Test on Lighter. — During the summer of 1917 the
author decided to carry out a deflection test on a concrete lighter.
The experiment was made just about a fortnight before the
Namsenfjord was launched, and was carried out on one of the
standard 100-ton lighters built by the author's firm. The
lighter was practically ready for launching ; the concrete in the
sides was 30 days old, and that in the deck 50 days old. Over
12 feet of the length from each end the lighter was carried on
supports and on the launching cradle ; over these lengths the
hull was so wedged up that the weight was practically uniformly
distributed. Over the 40 feet of length between the supports
the launching cradle was lowered about 5 to 6 inches, so that
it would be quite clear of the hull.
A load of 15 tons, in the form of gravel in bags, was placed
on top of the hatch, and a further ton, made up by 13 men,
was also placed on the hatch. Fig, 45 shows the lighter under
test.
The weight of the lighter was about 58 tons, and it was
assumed to be distributed uniformly along the length. The
additional load of 16 tons was assumed to be distributed uniformly
over the 40 feet of length between the supports. And the
support was assumed to be uniformly distributed over the 12 feet
of length at each end. On these assumptions, which are obviously
reasonable, the curves of shearing force and bending moment in
Fig. 46 were determined.
The maximum bending moment was found to be 419 foot-
tons. Since the loaded displacement of the lighter was 162 tons,
this bending moment corresponds to , which is not less
&G
than the amount to be expected on actual service.
The deflection of the hull between the points of support was
very carefully measured, and was found to amount to about
1-5 mm.
The hull was inspected by a representative from the Depart-
ment of Shipping and by a surveyor from Norwegian Veritas,
I
167
168 SEAGOING AND OTHER CONCRETE SHIPS
TOTAL DISPLACEMENT (p) ON 6'-O" DRAFT = 162. TONS.
LENGTH B.P. (L) 64.'-o"
D * I- = IO36S FOOTPOUNDS.
16 TONS LOAD ON 4O1
— *
58 TONS OWN WEIGHT ON 64-'
40'-0"-
16 TONS
f-~2 40*0,4= I6TOI
SUPPORT
CURVE OF BENDING
MOMENTS
FIG. 46. — Deflection Test on 100- ton Lighter, Curves of Shearing Force and
Bending Moment.
and the two inspectors gave a joint certificate to the effect that
the lighter showed no signs of weakness, nor even any sign of
cracks in the cement finish on the shell.
CHAPTER XII
GENERAL METHOD OF CONSTRUCTION
Preliminary Work — Bottom Floor Prepared — Outside Centring Completed —
Bottom and Side Reinforcement in Place — Frame Centring and Reinforcement
in Place — Deck Centring in Place — Centring and Reinforcement Completed —
Concreting — Concreting Finished — Cement Finish — Cement-Gun Concreting.
THE procedure in the construction of the ships built by the
author's firm was as described in the following paragraphs ; for
all ships in which the concrete is poured in situ the procedure
is similar.
Preliminary Work. — A bottom floor was prepared, of 1J inch
tongued and grooved boards in sheets 2' 6" X 8' 0" supported
by beams 6" X 7" spaced 18" apart. See Fig. 47, diagram (a).
Holes about 12 inches square were arranged at intervals along
the centre line for drainage and cleaning purposes. The height
of the platform (indicated by a in Fig. 47) was made sufficient
to permit of the launching ways being fitted. See Fig. 47,
diagram (6).
The mould loft floor was laid down, its size being sufficient
to permit of the half -sections of the ship, as on a body plan,
being drawn full size. The floor was of f inch boards, on
stringers 24" apart. On this floor the frame lines were drawn
in, or carved in, with a knife.
Templates, of 2" x 5" planks, were made in accordance with
frame lines on the mould loft floor. The frame lines were drawn
actually to the outside of the shell. Hence the centring fitted
inside the template in effect reduced the size of the ship ; but
the exterior mortar finish was the thickness of the centring
boards and so compensated for the reduction due to the centring
boards. The bottom reinforcement was cut and bent, rods
above J inch diameter having hooks made on the ends. Stirrups
for keelsons, frames, etc., were made.
Bottom Floor Prepared. — The outside forms were erected,
169
// T.SfG. BOARDS
(CL)
6"x7
-14^14
(b)
I8"O.C.
Fia. 47. — Bottom Floor and Launching Ways.
170
GENERAL METHOD OF CONSTRUCTION 171
templates made from the mould loft floor being placed every
24 inches, and centring of } inch rough boards fitted inside the
templates, beginning above point a in Fig. 48, and continuing
upwards and inwards. The stem and stern posts were erected
and thoroughly braced ; these formed terminations for the
FIG. 48.— Outside Centring.
centring. Special care was taken that the stern tube was lined
up correctly.
The exterior reinforcement in frames and keelsons was bent
according to the lines on the mould loft floor.
Outside Centring Completed. — Bottom slab reinforcement,
lower steel in keelsons and bottom frames, reinforcement in
sides (slabs) and interior steel in side frames was placed. Stirrups
in side and bottom frames and keelsons were placed.
172 SEAGOING AND OTHER CONCRETE SHIPS
Forms for bottom frames, keelsons, side frames, stringers,
and stanchions were prepared.
Bottom and Side Reinforcement in Place. — Bottom centring
(boxes) were placed and well braced. Side forms were placed
and braced, partly from the bolts embedded for nailing strips
for the inner ceiling.
Forms for stiffener beams and one side of slab centring for
bulkheads were placed.
Top reinforcement in bottom frames and keelsons was placed,
and the stirrups already in place straightened up and bent over
the top bars. Steel was erected in the stanchions and the stiffener
beams in the bulkheads.
Frame Centring and Reinforcement in Place. — Reinforcement
in bulkhead slabs, in deck, hatch coamings, and deckhouses was
cut arid bent.
The centring for the deck beams was erected and connected
to that of the side frames and the deck slab.
Deck Centring in Place. — The steel was placed in deck beams
and longitudinals, a few J inch diameter rods 4 inches long being
placed under the reinforcement to keep it clear of the forms.
The steel was placed in the deck slabs, hatch coamings, fore-
castle deck, and bulwark stiffeners.
The deck beams, longitudinals, and stanchions were braced
and supported by 4" X 4" or 5" diameter posts, well braced to
each other. The lower 15 inches of the inside slab centring
boards were placed in position in the recesses behind the cleats
indicated in Fig. 49, diagram (a). The forms for coamings were
erected (c) and the anchor bolts for deck fittings placed in position.
Centring and Reinforcement Completed. — The ship was
thoroughly cleaned inside by means of hoses, so that all dust,
shavings, scales, etc., were removed. When the cleaning was
finished and inspected, the openings left in the bottom centring
were closed.
Concreting. — One Smith mixer, capacity 20 cubic yards per
hour, was sufficient for concreting a ship of the 1,000-ton type ;
in case of a break-down another machine was always available.
The concrete was transported in large buckets on overhead
rails attached to the roof trusses of the shed covering the ways ;
and sheet-iron channels about 2 feet long, of tapering shape,
were used for filling the frames and slabs.
^^
0.
0
= 1-
b
__jj_
a
z
173
174 SEAGOING AND OTHER CONCRETE SHIPS
Small concrete spades, tampers of hardwood 6" x 6" x 2J"
with handles, and short f inch steel rods were used for tamping
the concrete.
Concrete carefully inspected and made according to specifi-
cation was filled in seven or eight panels of the bottom slab,
beginning aft ; a fairly stiff mixture was used, which was thor-
oughly rammed. Then the bottom frames, keelsons, and bilges
were filled about half-way up with a fairly soft mixture. After
that an additional seven or eight panels of the bottom slab
were concreted as before, working forward. Then, going back,
the bottom frames, etc., were filled up to the top. Next the
frames, keelsons, etc., adjoining the second set of bottom panels
were half filled ; then the succeeding panels of the bottom slab
were concreted, and so on until the stem was reached. When
the bottom was completed, the concreting of the side slabs and
frames was started, beginning aft, with two gangs, one on each
side. A layer about 15 inches deep was poured all round, and
the boards of the inside centring placed in position for the next
layer. The four or five panels furthest aft were poured one
round ahead of the others ; the concrete was thus prevented
from running downwards (aft) and remained where it was placed.
The concreting of the deck beams and slabs was carried out in
the same manner as the floors in a building ; the surface was
left rough for the subsequent finish, and was covered with sacks
or sawdust and sprayed regularly with water for four or five days.
Concreting Finished. — The exterior side centring was first
removed and scaffolding erected around the ship. When the
concrete had sufficiently hardened the bottom forms were
removed in sections, not more than 30 feet long, corresponding
to the length of one log of the centre launching way. All concrete
was then carefully inspected, if necessary with a hammer and
chisel.
The outside cement mortar finish was then applied ; this
finish is described below. The bottom was finished in sections,
as the outside forms were removed.
When each section of bottom finish was completed, the
centre launching way with "sleigh" timbers — see Fig. 47,
diagram (&) — was shifted into position. When the centre way
was in position the two sideways were blocked up in place ; the
three launching ways were greased with tallow and soft soap.
GENERAL METHOD OF CONSTRUCTION 175
To start the ship when launching, a 100-ton hydraulic jack was
placed against the stem, after the last retaining braces had been
removed ; heavy pulleys, fixed in the launching " sleigh " timbers
and the concrete foundations, with leads to an electric winch,
could also be used if needed. With a slope of J inch to the
foot no difficulty was found in getting the ships off.
After launching, the engines, deckhouses, equipment, etc.,
were installed, and this work was very similar to that in steel
ships. The propeller and shaft were placed in the stern tube
before launching.
The most economical complement of workmen for each ship
of the 1,000-ton type was found to be about
10 to 12 men placing steel,
12 to 15 carpenters making forms,
20 to 25 men (skilled and unskilled) for concreting.
The concreting was generally accomplished inside of two
weeks, working 16 hours per day in two shifts of 8 hours each.
For the outside cement finish, 3 expert masons with helpers
were required besides the attendants at the mixer.
Cement Finish. — Doubts have been expressed as to the advisa-
bility of plastering outside finish on concrete ships. It was
feared that the outside finish would drop off ; and it has been
considered safer to depend on the monolithic concrete surface,
presumably moulded in extra well made forms of planed boards.
But two objections should be raised against these doubts. In
the first place, the finish, when carried out strictly in accordance
with the following specification, will not come off, but will stay
on indefinitely ; and it will thoroughly waterproof and protect
the steel and concrete. In the second place, the natural surface
of poured concrete is never entirely free from slight irregularities,
especially cavities due to air bubbles and water not chemically
bound ; and these will appear even when steel forms are used
and the utmost care is taken in mixing and placing the concrete.
On land structures these irregularities and cavities do not matter,
but on ships, in salt water particularly, they do matter ; the skin
friction is largely increased, the concrete may be affected by
salt water penetrating through these porous " blow-holes," and
there may even be corrosion of the reinforcement. To some
extent these troubles can be avoided by painting the surface
176 SEAGOING AND OTHER CONCRETE SHIPS
with a plastic composition ; but the rational, lasting method
is to use cement mortar finish.
Materials. — First-class Portland Cement and clean, well-
graded sand up to No. 10 size (passing a screen with 10 meshes
per linear inch) ; proportions 1 : 2J. The cement and sand
were very thoroughly mixed in a machine mixer with fresh
water to consistencies as described below ; hand-mixing is not
satisfactory.
The surfaces to be finished were made scrupulously clean,
free from dust, and should preferably be rather rough, as from
undressed boards with plain edges. On the afternoon before
the cement finishing was started the surfaces to be treated were
well wetted by spraying with a hose.
The surfaces were splashed with plain water, or water mixed
with a special waterproofing compound, by means of an ordinary
large paint-brush. While the surfaces were moist the first layer
of thin mortar was thrown forcibly on by the trowel ; this layer
was made as thin as possible, since it acted as a binder for the
next coat.
The second layer of rather stiff mortar (the same proportions
otherwise) was first thrown on by steel trowel and afterwards
evened off and pressed together with a wood float (or trowel).
It was applied about J inch thicker than the completed finish
was to be, and was placed before the first layer had set. Before
the mortar had set hard the surface was gauged or screeded to
the ship's true form with a board template and the trowel. This
coat was made regular, but not smooth in the surface.
The third layer, about J inch thick, consisted of mortar pro-
portioned 1 : 2J as before, but made with finer sand, up to, say,
TV inch size. It formed the " backing " of the surface finish,
and was thrown on with the trowel and hand-floated in the
usual manner, but care was taken that only limited areas were
plastered at one time, because the following surface coat had to
be placed before the " backing " was dry.
The fourth, and last, layer was applied while the third was
still moist. In general three or four men started throwing on
the mortar. When about 2,000 square feet had been covered
one of the men commenced hand-floating ; and when the
floated part began to dry, another man followed with the
surface finish.
GENERAL METHOD OF CONSTRUCTION 177
The surface finish may be carried out by two different
methods :
(a) Brush Finish. — Mortar of mixture 1 : 1-5, with fine sand,
is plastered on in a very thin layer, either with a steel trowel
or a steel float and worked into the " backing." The surface is
then brushed with a fine hair- brush about 3 inches in diameter,
with hairs 2J to 3 inches long. If necessary the brush may be
slightly moistened with clean water.
(b) /Smooth or Polished Finish. — A thin mortar, of mixture
1:0-5 (fine sand), of a consistency like thick soup, is plastered
on with a steel float and pressed or worked into the backing
until the surface appears hard and polished. In order to secure
this more rapidly, it is customary to throw some dry cement on
by hand during the trowelling, and no ill effects from this practice
have been observed in the outside finish of ships.
Notes. — The polished finish gives the smoothest surface, but
is more expensive in materials and labour. It is also more apt
to develop hair- cracks.
The mortar must be used right away when it is mixed. If
it stands more than 1 to 1| hours it will not adhere to curved
or overhanging surfaces.
No layer of finish should be placed without first moistening
and thoroughly cleaning the surface on which it is to be
plastered.
The Deck Finish was placed after all fittings, deck machinery,
etc., had been mounted. It was made f inch thick and
trowelled to a polished finish. It is exposed to wear, large
temperature changes, and injuries in the same manner as a
floor finish on land, and is therefore likely to need repairs. The
outside finish of the hull, on the other hand, works under almost
ideal conditions of even temperature, uniform pressure against
the concrete, and no wear, except from the water-friction, and
this shows no effect up to date after four years of service.
In conclusion, the author desires to emphasize that to achieve
a good finish is difficult work, requiring expert workmen who are
particularly skilled in such work. But if carried out strictly as
described above, by skilled men using good materials, the finish
will be entirely satisfactory. After the finish has hardened for
at least a week, it should be inspected by going over the entire
surface of the ship with a heavy hammer, hitting moderate
12
178 SEAGOING AND OTHER CONCRETE SHIPS
blows to sound for possible crevices ; should any place be
doubtful, it must be cut open with chisels and finished properly.
Cement-Gun Concreting. — The concrete oil carriers built for
the Standard Oil Co. were constructed partly by use of the
Cement- Gun. Wood forms were erected on one side only,
against which the concrete was " shot " around the steel. Interior
bulkheads were concreted in this manner, and also the transverse
frames of the canal boats, which were shot on the reinforcement
as shown in Fig. 50. The concrete was smoothed off to regular
shape and surface by hand trowelling.
The cement-gun was also used in connexion with a method
of oilproofing concrete. Since the machine is comparatively
unknown in most countries at present, a brief description and
some figures from its practical use are of interest. The type
presently described is a proprietary machine developed and
manufactured by the Cement -Gun Company, of Allentown,
U.S.A., who have experimented for years on the subject. It is
not a concrete mixer, but a tool for placing the previously
mixed concrete (or mortar) in position.
Cement and fine aggregate are thoroughly mixed together
dry in any practical way in the proportions chosen. It should
be noted that a considerable portion of the sand jumps out by
rebound when the concrete is shot against the forms, steel or
concrete surface, and so the original mixture is materially
altered before being in place. Experience has shown that a
mixture in the machine of 1 part cement to 3J parts sand will
ultimately yield 1 part cement to 2| parts sand in the finished
product. The dry mixture is placed in a conical hopper on top,
and falls by the release of an airtight bottom valve into a cone-
shaped chamber. From there it drops by the release of a bottom
valve into another chamber, also of conical shape. The double
conical chambers form airlocks and permit a continuous supply
of materials ; by alternately opening the upper and lower valves
the air can be let out of the upper chamber without appreciably
reducing the pressure in the lower chamber. In the lower
chamber a feed wheel supplies the mixture (still dry) to a 1 J inch
reinforced rubber hose through an outlet provided with a special
valve. Compressed air is supplied from a separate air compressor.
The dry materials are shot through the hose, and water is
supplied through another hose which connects with the first at
GENERAL METHOD OF CONSTRUCTION 179
the nozzle and hydrates the materials as these are being shot
out. The manufacturers recommend the use of an air-pressure
of 35 to 45 Ib. per square inch or higher, and a water- pressure
about 20 Ib. higher than the air-pressure. The author's experi-
ence indicates that pressures of 18 to 20 Ib. per square inch for
FIG. 50. — Shooting Concrete in Place with the Cement-Gun on Oil Carrier
Socony 201.
the smaller machines and 28 to 30 Ib. per square inch for the
larger machines are better ; the former pressures require 150 to
175 cubic feet of free air per minute and the latter 250 cubic
feet per minute.
The capacity of the smaller gun is about 150 cubic feet of
concrete per eight-hour day and of the larger about 200 cubic
feet, placed in a layer about 2 inches thick. A minimum crew
180 SEAGOING AND OTHER CONCRETE SHIPS
of three men is needed to work each gun, apart from the men
required to work the power plant. The machine is made of
steel, weighs 1,200 lb., and is mounted on two wheels like a
cart. The maximum efficient length of hose was found to be
about 100 feet.
The advantages of placing concrete with the cement-gun
depend on the type of work and the local labour conditions.
Concrete shot through the gun is very dense and hard, sets
rapidly, and can be placed in colder weather than ordinary
concrete. For fireproofing steel work, concreting thin walls,
and repairing or placing concrete linings in shafts, tunnels, etc.,
where a smooth finish is not required, the machine is very useful,
but in its present development the method has several drawbacks
in concrete shipbuilding. The rebound of sand is serious, as it
may cause sand pockets around the reinforcement and uneven
quality of the concrete in corners where straight shooting is
difficult. Fine sand is uneconomical, as the rebound with its
use is excessive. Coarse sand is much preferable not only from
the standpoint of economy, but on account of the better quality
of the concrete. The machines are at present complicated and
require experts to operate both the nozzle and the filling. Some
parts, especially the rubber lining of the nozzle, wear out rapidly
and must be frequently replaced. In cold weather moisture in
the air- lines freezes at the joints and bends, causing trouble.
For straight work easily accessible, such as floor slabs, it is
doubtful whether any saving can be made in time or cost by
using the cement-gun ; but the method undoubtedly contains
great possibilities and will probably be perfected and simplified.
CHAPTER XIII
SOME SPECIAL METHODS OF CONSTRUCTION AND
PARTICULAR SHIPS
M.S. R. P. Durham — M.S. Linnea — " Pre-Cast " Systems — S.S. Armistice —
S.S. Bartds — Present Tonnage of Concrete Ships — Author's Recommendations.
THE feverish activity of shipbuilding displayed in all shipping
countries during the war naturally brought forth a large number
of suggestions and schemes of construction. This was particu-
larly noticeable in concrete shipbuilding, after it was proved
that seagoing ships of this material were a practical proposition.
Space does not permit the detailed consideration or even the
enumeration of all the propositions which appeared in the press,
as patent applications or mere suggestions to concrete ship-
builders. If the originators of these schemes had stated the plain
truth, that their ideas had not yet been tried out, or if they had
refrained from writing until they had reliable data to put forward,
much confusion would have been avoided and many exaggerated
or entirely unfounded statements would never have appeared.
Unfortunately for the development of concrete ships the authors
of the proposals rarely disclosed that they possessed no actual
experience ; yet they did not hesitate to publish in leading
technical journals on both sides of the Atlantic all sorts of fic-
titious data purporting to be facts ascertained from personal
experience.
But some special methods of construction were actually tried
out, and a few examples are described below.
M.S. "R. P. Durham." — The Engineering News-Record, 1920,
p. 388, describes the construction of a 2,000-tons oil-tanker of
concrete, which was built in sections on end. The dimensions
of the ship, which was named R. P. Durham, are 298' X 33' 9" X
21' 10", and the capacity was estimated at 14,000 barrels of
medium oil. The design and method of construction are unusual.
The cross-section of the ship consists of two complete circular
181
182 SEAGOING AND OTHER CONCRETE SHIPS
frames of 21 feet in diameter, with their centres 13 feet apart.
A central chamber 6 feet wide inside is formed by the circular
sections cutting each other. This is used for a passage-way,
and for piping, etc. ; and bulk oil is carried in the remaining
space in the two cylindrical holds, divided by bulkheads every
30 feet. No transverse or longitudinal frames are used, but
the shell is extra heavy, 7 inches at the top and 10 inches near
the bottom. The total length of the ship is made up of seven
intermediate sections (length 30 feet) and the bow and stern
portions, which were built on ways in the usual manner. The
seven sections were constructed on end, one at a time, using
sliding forms lifted by jacks as the concreting went up. After
hardening, each section was moved on rollers to a special crane,
which tipped it into horizontal position, and it was now trans-
ported (on rollers by winch and tackle) to the launching ways,
where all were spliced together. Each section had reinforce-
ment protruding about 38 inches from each end, and this was
overlapped by steel from the next section. Concreting of the
open spaces was done by spraying the end faces of each section
with mortar from a cement-gun and filling in the gaps with
ordinary concrete in forms.
The bow section is provided with a forecastle deck and
bulwarks ; the stern contains engine-room, fuel tanks, etc. A
high deckhouse with bridge amidships provides rooms for navi-
gation and cabins for officers and crew. Two Bolinder crude oil
motors of 160 B.H.P. each are installed.
The R. P. Durham and a sister ship were constructed at
Aransas Pass, Texas, for the France and Canada Oil Transport
Co.. New York, by the Macdonald Engineering Co. of Chicago,
who proposed the scheme. The concrete was composed of 1 part
cement to 1 part crushed coke up to \ inch size. It is stated to
have shown a crushing strength of 3,500 to 4,000 Ib. per square
inch after 60 days and to weigh 110 Ib. per cubic foot excluding
reinforcement, which is lighter than the Shipping Board's light-
weight concrete (120 Ib. per cubic foot). The R. P. Durham
was launched sidewise on 24th July 1920 ; nothing is known
about her subsequent experience or behaviour in service. The
construction was delayed by a tornado which flooded the ship-
yard and destroyed the records of cost and time of construction.
It is claimed that the ship was built considerably cheaper than
SPECIAL METHODS OF CONSTRUCTION
183
a steel tanker of the same size. The ship seems very long in
proportion to her beam and depth, but extra longitudinal strength
is gained by the internal walls of the central compartments.
The design is unique and results from actual service will be
very interesting. The author believes that the type will be
difficult to handle in rough weather, as the seagoing qualities
are those of a submarine rather than of a merchant ship. It is
probable that the construction would be improved by the ship
being built on ways in one continuous central section ; sliding
steel forms could still be used, especially for the interior centring.
FIG. 51. — M.S. Linnea after launching.
M.S. " Linnea." — The first engine- driven, concrete ship
built in Sweden is the M.S. Linnea, launched in December 1918 at
the yard of A. B. Betonverket, Malmo. The ship is owned by
A. B. Betongelt, Malmo, and the design as well as the method
of construction are very unusual. Briefly, the torpedo shape
of hull is adopted with a small forecastle deck and a deckhouse
aft of the hatches, as seen in Fig. 51. The length is 138 feet
overall, the cross-section is elliptical with maximum breadth
and depth amidships about 32 and 22 feet respectively. The
total displacement is 1,000 tons and the deadweight capacity
184 SEAGOING AND OTHER CONCRETE SHIPS
calculated at 700 tons, which seems high and has not been con-
firmed after completion. The ship is built of a combination of
reinforced concrete and wood. Throughout the entire shell
3" X 3" strips of lumber about 4 inches apart are embedded
permanently in the central section of the concrete slab, which
is reinforced with steel rods near both faces and has a total
thickness of 5J inches.
The launching arrangement was also unique, since the ship
was built on a platform suspended in the air from hangers resting
on pile-clusters on both sides. When the concreting was
finished, the platform was lowered into the water and the hull
floated off. In the Swedish engineering journal Teknisk Tidskrift,
26th March 1919, an article by the builder describes the Linnea,
which had been launched three months before. Various infor-
mation of interest is lacking, such as the type and size of engines,
exact weight and cubic space of the hull, watertightness, interior
flooring, hatches, etc., and cost of construction. Nor has any-
thing later been published about actual experience with the
vessel in service, so far as the author is aware.
" Pre-Cast " Systems. — Several systems of building concrete
lighters from pre-cast units were tried in Great Britain during
the war. Such systems of construction enable a saving to be
made in the expenditure on centring ; but the saving which
can be made on this item is not very great. The cost of lumber
materials (without labour) used for centring in the ships built
by the author's firm amounted to less than ten per cent, of the
total cost of the reinforced concrete in the hulls. With " pre-
cast " systems the labour required erecting forms is reduced,
but the labour required for handling and placing the heavy
pre-cast units probably more than makes up for this, and would
for seagoing ships of fair size involve the provision of cranes not
otherwise necessary in concrete shipbuilding.
A lighter (shown during construction in Fig. 52) was built
according to a pre-cast unit system patented by H. C. Ritchie
and described in a paper before the Liverpool Engineering
Society reported in the Journal of Commerce, 30th January 1919.
The main features are pre-cast transverse units comprising
portions of the shell slabs about two feet long with half of a
transverse frame at each end of each unit ; each unit is thus
of " channel " section. Abutting flanges of adjacent units form
PRE-CAST CONSTRUCTION
185
frame members, which have openings for longitudinal and
diagonal steel bars to pass through. The frames are spliced at
the bilges and centre keelson by steel loops embedded in .each
pre-cast section. The joints between the flanges of the frame
units are filled with mortar ; the deck slab is concreted in situ.
FIG. 52. — Concrete Lighter being constructed by Concrete Seacraft, Ltd.,
Liverpool, on H. C. Ritchie's system of pre-cast units.
Another system on similar lines, but simpler, as it avoids
joints and splices of the unit frames, was devised by Captain
J. H. Waller, R.E. The frames are reinforced and concreted
in place as usual. So are also the longitudinal members, keelsons,
bilge girders, and gunwale girders. The side and bottom slabs
are pre-cast in units reaching from gunwale to bilge and from
the bilge to centre keelson. Side joints are formed at successive
186 SEAGOING AND OTHER CONCRETE SHIPS
transverse frames, where reinforcing rods projecting from all
sides of the pre-cast plates are hooked down around the rein-
forcement in frames before the latter are poured. A cross-
section in Fig. 53 shows the arrangement. Forms were used
only for the frame members. The first ship built according to
Waller's system was a barge 187' 6" x 32' 10" X 19' 0" for the
British Government. An article in the London Engineering
during 1919 describes the yard and details of construction.
paneled
where. _
Shear **«
Stresses
permit
Sectjon through Frames Section between Frames
FIG. 53. — Cross-section of Barge built for the British Government to the design
of Captain J. H. Waller.
A third method of building pre-cast concrete vessels was
introduced by B. N. Stroyer in the construction of ten lighters
for the British Admiralty by the firm of Christian! & Nielsen,
London. Fig. 54 shows five of the ships, delivered in March
1919. The lighters are equipped with steam capstans and
winches for handling coal and are built to the approval of Lloyd's
Register. Their dimensions are 185' X 35' X 18', and the
deadweight carrying capacity is probably between 800 and 900
tons. The bottom, deck, stem and stern parts were concreted
in situ, but the sides were pre-cast in large sections horizontally
BRITISH CONCRETE S.S. ARMISTICE 187
and afterwards raised in place by cranes, before the bottom and
deck were concreted. In executing a large order for ships of
exactly the same type and size, and where it is possible to use
a dry dock for the construction, the system may save time and
possibly cost. But under ordinary conditions, particularly in
constructing larger ships, it is doubtful whether such advantages
would be gained. The side sections would be very heavy and
awkward to place in position on the launching ways, unless each
section was made quite narrow, and this would mean more joints
with expensive or weak connexions.
FIG. 54. — Concrete Lighters with pre-cast sides, built for the British Admiralty
at Tilbury, by Messrs. Christiani & Nielsen.
S.S. "Armistice." — The first seagoing, engine-driven concrete
ship built in Great Britain was the cargo carrier S.S. Armistice,
built by the Ferro- Concrete Ship Construction Co. at Barrow-in-
Furness. The dimensions of the ship are : length b.p. 205 ft.,
breadth 32 ft., depth 19 ft. 6 in., with steam-engine of 400 I.H.P.
The deadweight capacity is said to be 1,150 tons. On her
maiden voyage, from Londonderry to London in February 1919,
the Armistice carried 1,000 tons of oats in bulk. The ship has
been described in papers by Mr. Owens Thurston, Managing
Director of the Ferro- Concrete Ship Construction Co., before
the Institution of Naval Architects, and by Mr. De Vesian, of
the firm Mouchel & Partners (who prepared the reinforced
188 SEAGOING AND OTHER CONCRETE SHIPS
concrete design) before the British Concrete Institute on 27th
March 1919. Fig. 55 shows the launching of the ship.
The Armistice was built to class in Lloyd's Register. The
concrete proportioned about 1 : 1-3 : 2-7 and was placed mono-
lithically in wood forms around the reinforcement ; steel centring
was tried also for the sides. The transverse frames are 3 feet
apart with heavy longitudinal stringers at the bilges and gun-
wales. The hull seems to be considerably heavier than necessary.
The actual deadweight capacity is not known, but assuming that
FIG. 55. — Launch of S.S. Armistice, built by the Ferro-Concrete Ship Construc-
tion Co. at Barrow-in-Furness.
it is equal to the estimate of 1,150 tons, it is only 49 per cent,
of the total displacement of 2,350 tons. The designers may
not have had free hands in the matter, since the ship was built
to class ; but had the Armistice been constructed on the lines,
for example, of the author's design in the Askelad, the ratio of
deadweight to total displacement would have been 54-9 per
cent., giving a deadweight of about 1,290 tons, or 12 per cent,
increased cargo capacity. Some saving could have been made
on the steel reinforcement, which is said to be 190 tons or about
16 J per cent, of the deadweight. In the Askelad 9f per cent.
DANISH CONCRETE S.S. BARTELS 189
steel was used, which for a vessel of 1,290 tons deadweight would
equal 126 tons, or 64 tons less than used in the Armistice. The
merits of the respective designs are best seen, however, by com-
paring the steel per ton deadweight actually constructed, which
means 16|- per cent, against 9|, or nearly 70 per cent, more steel
per ton deadweight in the Armistice design. The ship is reported
to be seaworthy and watertight. But the author is of the
opinion that the concrete used (1 part cement to 4 parts aggre-
gate) was not rich enough. Practical experience has shown
that the plasticity and certainty of watertightness so vitally
important in concrete ships can be assured only by reducing
the amount of aggregate, especially of the coarse type, con-
siderably beyond what laboratory investigations may indicate ;
and the mixture ought not to be less rich than about 1 part
Portland Cement to 2J parts well- graded aggregate (up to J inch
size). The additional cost of cement is a trifling matter compared
to the total cost of a seagoing ship.
It has been said that the Armistice after her first trials
developed some cracks in the deck near the hatches, but the
matter has evidently not been of serious importance as the ship
has given good service. In the Financier., 3rd August 1920,
there is a statement by Messrs. Leopold Walford, Ltd. (London),
as to their twelve months charter of the ship. The Managers
say that she has been running since March 1919 like a clock,
causing no trouble, disappointment, delay, or difficulty. She
has proved thoroughly seaworthy, and costs in upkeep only
about a fifth of the average cost of steel ships working under
similar conditions.
It is understood that the first cost of constructing the Armistice
was very high, but it would not be fair to assume from this
regrettable fact that subsequent ships would be as expensive.
Experience would undoubtedly have enabled her designers and
builders to reduce costs very much on later ships if the termination
of hostilities had not brought an almost immediate stop to
shipbuilding activities on the new and untried concrete con-
struction.
S.S. "Bartels." — The largest concrete ship built in Europe
up to date is the S.S. Bartels, constructed in Denmark by the
N. H. & I. Cyclone A.S. in co-operation with the Kjobenhavns
Flytedok & Skibsvaerft at Fredriksholm. The ship was com-
190
DANISH CONCRETE S.S. BART ELS
191
pleted in June 1920, and after a successful trial placed in the
coal trade to England, where she seems to have given satis-
factory service.
ffO
FIG. 57.— S.S. Bartels, Midship Section.
The dimensions of the Bartels are : length 230 ft. 10 in.,
breadth 36 ft. 8 in., depth from turret deck 25 ft. 5 in., draught
loaded 17 ft. 7 in. The total displacement is 3,300 tons, made
up by 1,500 tons weight of the ship and 1,800 tons deadweight.
192 SEAGOING AND OTHER CONCRETE SHIPS
The deadweight is equal to 54-5 per cent, of the total displace-
ment, and makes the S.S. Bartels together with the Askelad and
Faith the three lightest concrete ships so far constructed. The
Bartels is built to class in the Norwegian Veritas. Her light
weight of hull might seem to show that the author's criticism
of classed concrete ships as being too heavy is not justified ;
but the light hull of S.S. Bartels is due to a special type of con-
struction, which may or may not be advantageous.
From a technical point of view the system adopted in the
construction of the Bartels is sound ; but as regards certain
practical considerations of importance, the writer doubts whether
the type is an improvement on the ordinary method. The design
of the bottom was suggested by the late Mr. Bartels and by
Mr. K. Hoigaard, who has described the ship in a paper presented
before the Danish Engineering Society (Dansk Ingeniorforening)
on the 18th February 1920. The turret or trunk deck gives
increased depth of construction against longitudinal strains ;
it also makes the vessel " self-trimming," in a measure, for coal
and similar cargo in bulk. On the other hand, the deck con-
struction is complicated and expensive. The ship does not
gain in seaworthiness, but is apt to work heavily in a rough
sea, and she has much less buoyancy above the harbour deck
than the ordinary ship. The turret type for steel ships is no
longer popular among shipowners, and has practically gone
out of use. With the turret deck construction the main section
of longitudinal deck reinforcement becomes too concentrated
near the hatches, instead of at the gunwales, where it is more
effective.
The bottom construction of the Bartels is radically different
from that of ordinary types. Figs. 57 and 58 show the arrange-
ment, which consists of a large number of slanting struts between
an outer and inner slab. Shallow longitudinal beams connect
the struts, which slope both ways, thereby tying the construction
together in a kind of truss system. The slabs are very light,
3J-3J inches thick ; the beams are 10 X 10 inches ; and the
struts are 6x6 inches ; all are heavily reinforced, there being
no less than eight £ inch round rods in each strut. The amount
of steel in the Bartels has not been published, but the writer
believes it must be very considerable, judging from the plans
and photographs during construction. The labour required to
DANISH CONCRETE S.S. BART ELS
193
erect the unusually complicated reinforcement and forms for the
bottom and deck must also have amounted to much above that
for ships of ordinary form ; but cost data on these interesting
items have not been available. The period of construction was
nearly two years, but the builders no doubt met initial diffi-
culties which would not occur on later ships.
13
194 SEAGOING AND OTHER CONCRETE SHIPS
The double bottom is of questionable value ; it reduces the
cubic space of the hold, necessitates extra pipe lines with pumping
arrangement, and there is no need for water ballast tanks in
concrete ships, except fore and aft for trimming. Usually the
inner bottom adds extra weight to the hull, but this may not
be the case in the S.S. Bartels, where the inner bottom is an
integral part of the truss supporting the outer bottom. The
author would prefer a massive outside bottom slab of double
thickness (6 or 7 inches), which would not be excessive for a
ship of this size. The Bartels grounded some time ago, and
the inner bottom proved valuable as it kept the water out ; but
it might be argued that perhaps no leak would have occurred
if the outer bottom had been much stronger.
Present Tonnage of Concrete Ships. — In dealing with the
foregoing examples the intention has been to demonstrate different
methods of construction and types of ships in order to show
what ideas have been tried in concrete shipbuilding up to date.
Many other ships have been built in the countries mentioned,
as well as in France, Italy, Spain, China, India, and other
countries ; but the vast majority of these have contributed
nothing new or of special interest to the development of the
art. The largest programme for the construction of concrete
ships, apart from that of the U.S. Shipping Board, was started
in Great Britain during 1918 by the Ministry of Shipping. It
originally embodied the construction of about 150,000 tons
deadweight, but it was at the Armistice almost abandoned. Of
ships completed in different yards may be mentioned a dozen
seagoing tugs of general dimensions 125' 0" X 21' 6" X 14' 9",
mean draught 12' 0", triple expansion engine of 750 I.H.P. ; and
about fifty seagoing lighters 180' 0" X 31' 6" x 19' 6". It is
estimated that in all countries together about one hundred
seagoing concrete ships with an aggregate tonnage of approxi-
mately 150,000 deadweight tons have actually been completed
up to the present. In addition to this several hundred lighters
and other small craft for enclosed waters have also been con-
structed.
From these figures it would seem that ample material is
available to determine by practical experience the merits of
concrete ships. This is true only in a certain measure, which
applies to the elementary though most important points such
AUTHOR'S RECOMMENDATIONS 195
as strength, watertightness, and seaworthiness. In regard to
practical considerations of equal importance, such as First Cost,
Cargo Capacity, Speed, Running Expenses, etc., not to mention
details and time of construction, the existing tonnage is not
able to offer definite information, since it consists only of experi-
mental ships, built as a rule by people who neither had a yard
nor any previous shipbuilding experience, and whose activities
were stopped before they even had a chance to build a second
vessel.
Author's Recommendations. — Having considered briefly the
ideas and methods proposed by other engineers, the author
desires to mention that he has himself discarded as unpractical,
or too expensive, several of his own ideas on which patents were
granted, and numerous others which through practical experience
were found unsuitable in the construction of seagoing ships.
The methods of design and construction which so far have given
the best results are fully described in previous chapters, but the
author admits that they are far from perfect, and will in the
course of further development no doubt be much modified or
perhaps radically changed.
Whatever the future brings in the way of improvements,
there are at present some fundamental facts which may be set
down almost with certainty as recommendations for concrete
shipbuilders :
Exterior Shape.— There is no reason for, nor advantage to be
gained by, building seagoing concrete ships different in outside
shape or proportions from the best practice among naval archi-
tects for steel ships of all types. " Simplified " lines do not
appreciably reduce the cost of outside centring ; extra depth is
not needed to secure sufficient longitudinal strength, and super-
structures on deck are required for just the same reasons as on
steel ships.
Details. — There is considerable scope for the ambitious
designer to improve details of the hull, which differ greatly
from those of the steel ship on account of the nature of concrete.
It is certain that it is not economical to place frames as close
together as in steel ships. It is not advisable to construct sides
or bottom of cellular types with very thin double walls. The
shell should be as massive and thick as possible without unduly
increasing the weight ; this facilitates the placing and utilization
196 SEAGOING AND OTHER CONCRETE SHIPS
of the reinforcement, and cheapens the construction. All
accidents to concrete ships have shown relatively greater weak-
ness of shell than of frames.
When a really satisfactory light concrete is developed it is
not unlikely that the shell thickness will be greatly increased,
and that frames between bulkheads will be nearly dispensed
with. Whether transverse or longitudinal frames are most
economical is an open question, and the weight of the hull comes
out practically the same in either case. For transverse frames
a minimum spacing of about 4 feet is generally to be recommended.
Construction and Launching. — In the author's opinion concrete
ships should be monolithically constructed and the concreting
done in one continuous operation as far as possible within
reasonable and practical limits ; this is in keeping with the
character of the material. The exterior centring is erected first
and the steel must of course be in place. At present it is difficult
to see any better way, but when special types of reinforcement
are manufactured for concrete shipbuilding and the industry
has been firmly established, improvements in construction will
naturally occur. There is certainly no need of any spectacular
methods of building or launching concrete ships in any other
position than that which hundreds of years have shown to be
best for ships of wood and steel.
ADDENDUM
Note to paragraph on p. 189, S.S. " Bartels." — What is
now presumably the largest concrete ship constructed in Europe
is reported to have just been launched at Lavagna in Italy.
Designed by Signor Galliquani, this vessel is named the Persi-
voranza, is said to be of 4,700 tons displacement and 3,000 tons
burden, and is fitted with two motors to give a speed of 8 knots
per hour.
[App. p. 1]
APPENDIX
CALCULATIONS FOR THE TRIAL SHIP ASKELAD
1,000 tons D.W. Cargo Vessel, propelled by two 160 H.P. Bolinder
crude oil engines.
Material : Portland Cement Concrete reinforced with steel rods.
Hull No. 21.
Designed and built by Fougners Staal-Beton Skibsbygningscompani
A.S., Shipyard at Jeloen, Moss.
Note. — These calculations are presented just as they were made
in the office. They may be crude in some respects, and the design
could of course be considerably improved with our present experi-
ence ; but it should be remembered that when they were made, the
only seagoing concrete ship in the world was the little Namsenfjord.
197
198 [App. p. 2] APPENDIX
. - 0"
i
i, L. 1
*
. -LJ
l(
To
To
SHIP.
To Tv^. PO\\AT
TTN..
"To
TSL
CALCULATIONS FOR THE ASKELAD |_App. p. 3] 199
tVL TooT
-x \\x Vo.
To
A-x
*^ «
(t-\"H\^&^W.S
x-V*
= %.1.lOO - ^* *%«>«nt *»ooo a \°iji^0 \\je-,
^^^^«.\H^«bTKt«o«b TI ^>^V° _ N^^ \Ws/ft.
5>*xMS
200 [App. p. 4] APPENDIX
^.0% ov THE. VE.co<\)^.\-<b \_^-n<i»rrH VRQVX 'bT^-VN To
R. A'-o"
1.\aO
H
YY*-
fc« •»•%»* « '^W 00
\« %••% s % t>o
To
Pt-H roo-T \_t-n.^TV\ OV "ovkvP
^Vka ^.>\°>.ooc>^q»a ^a^«».oOo t \b«
V^
F\T
*• V
'- 10"
t¥>i IV
CALCULATIONS FOR THE ASKELAD [App. p. 5] 201
f \_o
H*.o To
K1%
1. \Vio
't.O.oo
T ToR.
$* i • T= *
.000 A \S>X = \6r.\oes \b-b
202 [App. p. 6] APPENDIX
NATE.
uiou^L \-\*VF_
Tvvt
V
- tt-t.
jgf
T
p -
ill F RO ^
I T T T T M T T T I wt FV
FRO*
* O.V% l/PvXnY
CALCULATIONS FOR THE ASKELAD [App. p. 7] 203
^HX.^^n^av Vr*.Va* \tS **.*.\.«aon •=• *T.^^QO _ -^-^ Q'V
\\u~b o
7.
W
y\-
\t.
0V
To
\«o
UY To o V<T
WE. V<.^.^.^>
^ i
\\> «»/,..
s \\.\oo
OV W\_
\\
Wu . \XVan\XO,
^O ^«>
204 [App. p. 8]
APPENDIX
'f I*
N
f
I-
i
a
•
0
f
\ !
i
/
<^
if*
\ ii^
>
1,
'o >
\ ••?
<0
^0 "
CALCULATIONS FOR THE A8KELAD [App. p. 9] 205
\
A
206 [App. p. 10] APPENDIX
\-.*.t\«TH «r WV/v » \*Vtl-tf
>M\^X,T «T v^Ky^. » Ci-V"
CALCULATIONS FOR THE ASKELAD [App. p. 11] 207
FOR
To e»S_ y^o 07
Vttl-o" WttD
OF
FROM
To 00 R
We.
OUR
J>0 Q « -*»^°
V> fe^eo
V\7W*_'. <^*-S^A_ % oR
•F "t
OF
« \°i^ Ton«o.
FoR
OF X To
OF
Mb.
208 [App. p. 12] APPENDIX
. SJ —
&<
Va^o
\Vooo X\- IT*.
O VVi
O \ V
o.w
"tSfoVoH
e>o
\^o \y>«.
CALCULATIONS FOR THE A8KELAD [App. p. 13] 209
KT
\_OOW ^t.^^ a
A-d
P. H
0.0% »^%
. oo o \
\
* T* \V» fc" WT To
\t9>o - *-- \
S •j.'.^o
\ fc.o^
\*>.ooo «V^
14
210 [App. p. 14] APPENDIX
II \*\ I I I I I I I I I IT
CALCULATIONS FOR THE ASKELAD [App. p. 15] 211
its
^ C • X . t) d -
OR
\i.««-
5i«"»A
t,oo
> caTtt\. TI.I
Vaoo* \>O«B.
\«o W\
T «.t\«
INDEX
Aaron Mariby, S.S., 1
Abrams, Prof. Duff A., 129
Action of sea-water, 138-9
Admiralty lighters, British, 187
Aggregates, 113-24
— , percentages of voids in, 122
Agriculture, U.S. Dept. of, Bull. No.
235, 125
American Concrete Institute, 46, 72,
78, 82, 85, 118, 150
— ships, 45-9
— Fuel Oil and Transportation Co., 78
— Railway Engineering Association,
150
— Society for Testing Materials, 111,
147, 150
— of Civil Engineers, 111, 150, 151
Andrews, H. B., 85
Armistice, S.S., 187-9
Askelad, M.S., ashore on French coast,
86-90
— calculations for, 197-211
— carrying capacity, 38
— constructional details, 28-33
— cost data, 39
— — of repairs, 90
— first North Sea trip, 35
— main particulars, 27-8
— negotiations for construction, 19-
20
— , seagoing service to present date,
36-8
— , trials and inspection, 33
Aspdin, Joseph, 108-9
Atlantus, S.S.,76
Ayre, A. L., 150
Baker, G. S., 100
Bartds, S.S., 189-94
Beams, deck, etc., 164
— , double reinforcement, 154-7
— , single reinforcement, 151-4
Betongelt, A. B., 183
Betonverket, A. B., 183
Bond strength, 132-3
Bottom floor prepared, 169-71
— frames, 159-60
— reinforcement in place, and side, 172
British Admiralty, concrete lighters
for, 186
— concrete ships and lighters, 184-9
Bruhn, Dr. J., 9
Brunei, I. K., 2
Bryde, Mr., 20, 56
Bulkheads, design of watertight, 164
Buoys, concrete mooring, 65
Bureau of Standards, U.S., 140
Bush, A. L., 78
Calculations for M.S. Askelad, 197-211
— M.S. Namsenfjord, 10-1
— M.S. Stier, strength, 21-2
— in theory of design, 151-8
Cape Fear, S.S., carrying capacity, 46
— , cost data, 49
— , dimensions, 76
Cargo carriers, American concrete, 45-9
Carrying capacities of S.SS. Selma,
Latham, Cape Fear, Sapona, and M. S.
Askelad compared, 47
— of trial (M.SS. Stier and Askelad)
and classed (M.SS. Patent and Con-
crete) ships compared, 43
Cement finish, general method of, 175-8
— , Portland, 108-12
Cement-gun, concreting by, 178-80
Centre keelson, 160
Centring and reinforcement completed,
172
Chemical properties of Portland
cement, 110
Christiani and Nielsen, Messrs., 186
City of Atlanta, S.S., 77
Civil Engineers, American Society of,
111, 150, 151
— , Institution of, 138
Classification societies and concrete
ships, 41-2
Clyde Steamship Co., 78
Coefficient of elongation of steel, 148
Comparative values of cargo carriers,
43-5
Compressive strength of shipbuilding
concrete, 130-1
Comyn, W. L., 68, 70
Concrete, M.S., cost data, 43
Concrete floating dock, the first, 56-60
— Institute, 188
212
INDEX
213
Concrete Institute, American, 72, 78
— lighters, American, 79-82
— , British, 184-7
— compared with wood and steel,
67
— , Norwegian, 65—6
— lightship, Jldjernsflu, 60-2
— mooring buoys, 65
— oil-tankers, 79-82
— Seacraft, Ltd., 185
— Ship Section, U.S. Shipping Board,
72
— , shipbuilding, 108
— , — , elasticity of, 133-4
— , — , oilproofing of, 141
— , — , percentage of voids in aggre-
gate, 122
— , — , Portland cement for, 108-12
— ships, American, 45-9
— , British, 186-9
— , comparative cost data for steel
and, 96-100
— , Danish, 189-94
— , first classified, 41
— , future of, 5-6, 104-6
— , present tonnage of, 194-5
— , running expenses, etc., 102-4
— , speed of, 100-2
— , Swedish, 183-4
— tug, the first, 50-6
— v. steel for ship construction, 4-6
— water-carrier, the first, 62-3
— , watertightness of, 134-5
Concreting by cement-gun, 178-80
- finished, 174-5
— , general method of, 172-4
Construction, general method of, 169
— , special methods of, 181
Contraction and expansion, 135-6
Cost data, comparative, for similar
steel and concrete ships, 96-100
— , M.S. Concrete, 43
— , repairs to M.S. Askelad, 90
— — . — to M.S. Nicanor, 90-1
— , — to M.S. Stier, 92
— , S.SS. Selma, Latham, Cape Fear,
Sapona, and M.S. Askelad, compara-
tive, 49
— , trial and classed ships, 43-5
— , — ships Askelad and Stier, 39
Cuyamaca, S.S., dimensions, 76
Cyclone, A. S., N. H. and I., 189
D
Danish concrete ship, 189-94
— Engineering Society, 192
Deck beams, etc., 164
— , cement finish for, 177
— , centring in place, 172
Deflection test on lighter, 166-8
Design, centre keelson, 160
— , deck beams, etc., 164
— , longitudinal strength in, 161-3
— , side frames, 158-9
Design, theory of structural, 151-8
— , watertight bulkheads, 164
Dinsmore, S.S., dimensions, 76
Dock, dimensions and particulars of
concrete floating, 57-8
Durham, R. P., M.S., 181-3
E
Elasticity of concrete, 133-4
Engineering, 186
- News-Record, 94, 118, 181
Engineering Society, Danish, 192
— , Liverpool, 184
Engineers, American Society of Civil,
111, 150, 151
— , Institution of Civil, 138
Equipment of concrete ships, 14-5,
17-8
Expansion and contraction, 135-6
Faith, S.S., 68-71
Ferguson, L. R., 94
Ferro-Concrete Ship Construction Co.,
187
Financier, The, 189
Finish, general method of cement,
175-8
Finished, concreting, 174-5
Fire-resistance of concrete, 144-5
Floating dock, first concrete, 56-60
Fougner Concrete Shipbuilding Co.
(New York), 76, 79
— , Hermann, 71, 141
Frame centring and reinforcement in
place, 172
Frames, bottom, 159-60
— , side, design of, 158-9
France and Canada Oil Transporta-
tion Co., 78, 182
Freeboard in concrete ships, 47
Freezing of shipbuilding concrete,
128-9
Future of concrete ships, 5-6, 104-6
G
Garry Owen, S.S., 2
Glaettli, J., jun., 78
Great Britain, S.S., 2
H
Hardening of Portland cement, 109-12
High-carbon steel reinforcement, 148-9
Hogging, 161
Hoigaard, K., 192
Hool and Johnson, 150
Hurley, E. N., 72
Ice-breaker, first concrete (tug), 53
Ildjernsflu, concrete lightship, 60-2
Impurities in aggregate, 115-6
214
INDEX
Institute, Concrete, 188
— , — , American, 78
Institution of Civil Engineers, 138
— of Engineers and Shipbuilders,
North- East Coast, 100
— of Naval Architects, 187
Iron ships, development of, 1-4
Journal of Commerce, 184
K
Keelson, design of centre, 160
Kjobenhavns Flytedok and Skibsvaerft,
189
Labour, cost and amount of, 97, 99-
100
Latham, S.S., carrying capacity, 46
— , cost data, 48-9
— , dimensions, 76
Lighter, deflection test on, 166-8
Lighters, concrete, American, 79-82
— , — , British, 184-7
— , — , Norwegian, 65-6
Lightship, first concrete, 60-2
Lightweight aggregate, 117-8
Linnea, M.S., 183-4
Literature on concrete construction,
150-1
Lloyd's Register of Shipping, 4, 147,
188
Longitudinal strength, 161-3
Lord, J. W., 85
M
MacDonald, Allan, 68
— Engineering Co., 182
Maritim, A. S., 56
Material per ton, units of, 96
Materials, American Society for Test-
ing, 111, 147, 150
Michaellis, Dr. W., 138
Mills, Prof. A. P., 135
Mixing shipbuilding concrete, 124-6
Mixture for shipbuilding concrete, pro-
portions of, 118-24
Moffit, S.S., dimensions, 76
Mortars, trass, 136-7
Mouchel and Partners, 187
N
Namsenfjord, M.S., assumption for cal-
culations, 10-1
— , cementing, 14
— , engine foundations, 12-4
— , equipment, 14-5
— , first seagoing concrete ship, 7-18
— , Government permit obtained, 9-10
— , inspection after trials, 16-7
— , launching, 15
— , experience gained from, 17-8
Namsenfjord, M.S., main particulars, 10
— , method of construction, 11-5
— , preliminary considerations, 7-9
— , stern post, 14
— , trials, 15-6
Naval Architects, Institution of, 187
Nicanor, M.S., 90-1
Norske Veritas (see Norwegian Veritas)
North-East Coast Institution of Engin-
eers and Shipbuilders, 100
Norwegian Department of Shipping,
7-9, 15-6, 19, 27
— Government requirements?, 7-9, 19,
21, 164-6
-Veritas, 21, 147, 162, 165, 166, 192
Oil carriers, concrete, 79
— proofing of concrete, 141
— storage afloat and ashore, concrete
for, 82-4
— tankers, carrying capacities, 76
— , cost per ton deadweight, 49
Oils, etc., action of, 139
Outside centring completed, 171-2
Palo Alto, S.S., dimensions, 76
Patent, M.S., carrying capacity, 43
Pearson, J. C., and J. A. Smith, 85
Peralta, S.S., dimensions, 76
Physical properties of Portland cement,
110-11
Placing and curing shipbuilding con-
crete, 126-8
Polias, S.S., dimensions, 76
— , on Cilley Ledge, 92-5
Portland cement, 108-12
— , setting and hardening, 109-12
— , specification, 110-12
— Cement Association, 150
Poss, Victor, 68
Pre-cast construction, 184-7
Proportions of mixture in shipbuilding
concrete, 118-24
Q
Quality of steel reinforcement, 147-8
R
R. P. Durham, M.S., 181-3
Register of Shipping, Lloyd's, 4, 147,
188
Reinforcement, high-carbon steel,
148-9
— , quality of, 147-8
— , specifications for, 148-9
— , types of, 146-7
Repairs, cost of, M.S. Askelad, 90
— , _, M.S. Nicanor, 90-1
— , — , M.S. Stier, 92
— to shipbuilding concrete, 142-4
INDEX
215
Ritchie, H. C., 184
Running expenses, etc., of concrete
ships, 102-4
S
Sagging, 161
St. Valery-sur-Somme, M.S. Askelad
ashore near, 86—7
San Francisco Shipbuilding Co., 68
San Pasqual, S.S., dimensions, 76
Sand, 116-7
Sapona, S.S., carrying capacity, 46
— , cost data, 49
— , dimensions, 76
Sea- water in rich mixtures permissible,
112
— on concrete, action of, 138-9
Selma, S.S., carrying capacity, 46
— , cost data, 49
— , dimensions, 76
Setting and hardening of Portland
cement, 109-12
Shear strength, 131-2
Shell slab, strength of, 163-4
Shipbuilding concrete, 107
Shipping Board, U.S., investigations
by, 71-2
— -, Lloyd's Register of, 4, 147, 188
— , Norwegian Department of, 7-9,
15-6, 19, 27
Side frames, design of, 158-9
Slater, W. A., 72
Smith, G. A., 85
Society, Danish Engineering, 192
— for Testing Materials, American, 111,
147, 150
— of Civil Engineers, American, 111,
150, 151
Socony 200, 201, and 50, oil carriers, 79
Sorensen, Thygo, 103
Specific gravitv of Portland cement,
110
Specification for Portland cement, 110-
12
— for steel reinforcement, 147
Speed of concrete ships, 100-2
Staal-beton 19, first concrete tug, 50-6
— , main particulars, 54
Standard concrete ship, U.S., 72-3
- Oil Co., 99
Standards, U.S. Bureau of, 140
Steam curing shipbuilding concrete,
128
Steel reinforcement, high-carbon, 148-9
— , quality of, 147-8
— , specifications for, 147
— , types of, 146-7
— ships, cost of, 97-100
— , development of, 3-4
— v. concrete ships, 4-6
— v. , comparative costs, 96—100
Stern construction, concrete and steel,
14, 28, 30
Stier, M.S., accident and cost of re-
pairs, 92
— carrying capacity, 43
— constructional details, 22-6
— cost data, 39
— main particulars, 20
— : method of construction, 26-7
— negotiations for construction, 19-20
— strength calculations, 21-2
— trials and inspection, 27
Storage of Portland cement, 111
Strength, bond, 132-3
— , longitudinal, 161-3
- of shipbuilding concrete, com-
pressive, 130-1
— of shipbuilding concrete, shear,
131-2
— , shell slab, 163-4
Stroyer, R. N., 186
Structural design, theory of, 151-8
- Materials Research Lab., Lewis
Inst., Chicago, 129
Swedish concrete ships, 183-4
Sydvaranger Mining Co., 164
Tables :
Adhesion between steel and concrete,
132
Average compressive values of vari-
ous mixtures, 121
Compressive strength, 132
— after 28 days, 126
— of trass mortars, 137
Effect of curing mortar under steam
pressure, 128
Elasticity of concrete in compres-
sion, 133
— of concrete in tension, 1 34
Percentage of voids in sand and
gravel corresponding to different
weights per cu. ft., 123
Shearing strength, 132
Teknisk Tidskrift, 184
Tensile strength of Portland cement,
111
Test on lighter, deflection, 166-8
Testing Materials, American Society
for, 111, 147, 150
Theory of design, 151-8
Thurston, Owens, 187
Tonnage of concrete ships, present,
194-5
Trass mortars, 136-7
Trial ships Askelad and Stier, main
particulars and details of construc-
tion, 20-33
, negotiations for, 19-20
, summary of results,
38-40
Tug, the first concrete, 50-6
Turret ship, concrete, 190
Twin screws, concrete stern construc-
tion for, 28, 30
216
INDEX
u
U.S. Bureau of Standards, 140
— Department of Agriculture, 125
— Shipping Board, concrete ships com-
pleted by, 75-8
— , investigations by, 71-2
— , report and projected pro-
gramme for concrete ships, 72
— standard concrete ships, 73-4
Units of labour per ton, 96-7
— of material per ton, 96-7
Vesian, de, 187
Vibration, pressure, etc., of shipbuild-
ing concrete, 129-30
Vicat, 108
Voids in aggregate, percentage of, 122
W
Walford, Leopold, Messrs., 103, 189
Waller, Capt. J. H., 185, 186
Water carrier, first concrete, 62-3
— mixture for Portland cement, 112-3
Watertight bulkheads, 164
Watertightnets of concrete, 134-5, 142,
143
— of concrete ships, 16, 27
White, Prof. A. H., 135
Wig, R. J., 48, 78
Wood ships, 1-3, 32
RETURN TO the circulation desk of any
University of California Library
or to the
NORTHERN REGIONAL LIBRARY FACILITY
Bldg. 400, Richmond Field Station
University of California
Richmond, CA 94804-4698
ALL BOOKS MAY BE RECALLED AFTER 7 DAYS
2-month loans may be renewed by calling
(415)642-6233
1-year loans may be recharged by bringing books
to NRLF
Renewals and recharges may be made 4 days
prior to due date
DUE AS STAMPED BELOW
AU6 1 7 i
SENTONJLL
0 6 2005
U.C. BERKELEY
LD 21-100m-7,'89 (402s)
uo I
UNIVERSITY OF CALIFORNIA LIBRARY